Latest Podcast Street AddressInterested in this information?Contact us, Stone Ridge, VA 20105, USA
Operational
Fully operational facility
Operated by:

Microsoft: IAD12

Short Code: IAD12
Year Built: 2026
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Cloud TowerInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Global ValleyInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Core CampusInterested in this information?Contact us
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
NN milesInterested in this information?Contact us Cloud RidgeInterested in this information?Contact us
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
NN milesInterested in this information?Contact us Yondr Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
NN milesInterested in this information?Contact us West StationInterested in this information?Contact us
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
NN milesInterested in this information?Contact us Hub OneInterested in this information?Contact us
NN milesInterested in this information?Contact us Yondr Arcola, VA
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
NN milesInterested in this information?Contact us CentralInterested in this information?Contact us
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
NN milesInterested in this information?Contact us MetroInterested in this information?Contact us
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?