Under Construction
New facility under construction
Operated by:

Microsoft: EAT13

Site: Plaza AlphaInterested in this information?Contact us
Short Code: EAT13
Year Planned: 2026
Utility Provider: Chelan County PUD
Floors: 1
Lot Size: 103 acres

Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.

The project will be built in two phases on a 102.5-acre plot the company acquired in April 2022.

  • Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.
  • Phase II is the Curtis and Torres properties, 20 and 10 acres, at 5351 Malaga Alcoa Highway and 5309 Malaga Alcoa Highway, respectively for which the company paid $2.6 million.

The authority says the buildings will each require approximately 83 gallons per minute, totaling just shy of 121,000 gallons per day. Waterworks are expected to be complete by the end of 2025.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Valley ThreeInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Prime PlazaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Prime RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Cloud PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Sabey: SDC Malaga
Sabey-owned planned 144 MW campus near Malaga, WA (Chelan County), in Chelan County PUD substation/transmission study phase; Q2 2030 target with possible acceleration to 2029.
NN milesInterested in this information?Contact us PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us T-Mobile East Wenatchee
T-Mobile's data center is on Sabey's campus.
NN milesInterested in this information?Contact us Sabey Intergate.Columbia
The Intergate.Columbia campus in East Wenatchee sits on 30 acres of land. The campus is fully leased, but Sabey is expanding on the campus.
NN milesInterested in this information?Contact us BitDeer: Washington
Bitdeer is repurposing its long-standing Wenatchee, Washington facility—originally deployed for crypto mining in 2018—into an AI-ready data center, with the conversion scheduled to finish in Q4 2026.
NN milesInterested in this information?Contact us CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more
Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported on...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?