Hub ProInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Leeds LS10 1FQ, United Kingdom
Planned
Future facility in planning stage
Operated by:

Microsoft: LBA11

Site: PrimeInterested in this information?Contact us
Short Code: LBA11
Year Planned: 2030

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

South ValleyInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cloud CampusInterested in this information?Contact us

Distance Site About
0.07 miles Center ProInterested in this information?Contact us
0.08 miles Core StationInterested in this information?Contact us
Microsoft has acquired 48 acres of land at the Skelton Grange site in Leeds, UK, for £106.6 million ($134.83m) from real estate group Harworth.
2.08 miles aql: Leeds DC2
DC2 & DC3 are the company's flagship sites, located within a historic 18th-century chapel. DC3 is famous for its "glass-floored" conference room situated directly above the server racks
2.39 miles aql: Leeds DC5
DC5 Canon House is aql’s purpose-built High-Performance Computing (HPC) hub, situated approximately half a mile from the Salem Chapel campus.
2.47 miles aql: Leeds DC3
DC2 & DC3 are the company's flagship sites, located within a historic 18th-century chapel. DC3 is famous for its "glass-floored" conference room situated directly above the server racks
2.67 miles Lumen: Leeds (Sterling House)
3.51 miles Gridjet: DC4 & DC5
Gridjet Datacentre Ltd operates a strategically located facility in Leeds, UK, providing a versatile infrastructure across two distinct data halls.
3.70 miles Virgin Media Leeds (Temple House)
3.87 miles C.C.S. DC14 - Leeds
3.88 miles AtlasEdge: Leeds, UK
AtlasEdge unveils Leeds first Tier 3 standard data center. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.
5.31 miles Node4: Leeds
6.43 miles nLighten Leeds (Wakefield)
6.97 miles Asanti: Leeds
The Asanti Leeds data centre was acquired from Daisy Group in November 2022. The facility (formerly known as Daisy Birstall) was already operational prior to the acquisition.
11.39 miles Deep Green: Bradford
Data center company Deep Green is set to build a new facility in Bradford, West Yorkshire, United Kingdom.
14.36 miles Stellanor: Harrogate
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
15.03 miles Stellanor: Elland TC4
The facility located at Unit J1, Lowfields Business Park in Elland is a high-specification data center that was acquired by Stellanor Datacenters from Redcentric in late 2025.
15.40 miles Plaza GammaInterested in this information?Contact us
Microsoft is proposing to develop a new UK data center campus on the site of a decommissioned power station in Eggborough, North Yorkshire. Microsoft aims to build two two-story data centers on part of the former Eggborough power station.
16.77 miles Copley Data Center
Lloyds Bank is selling its 55-acre office and data center campus in West Yorkshire.

North ValleyInterested in this information?Contact us Data Center Photos See all

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read Microsoft Begins Construction of La Porte Data Center Campus
Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took plac...

Microsoft Begins Construction of La Porte Data Center Campus

June 18, 2026 Microsoft Azure

Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took place on June 17. Smith wrote: "Today we broke ground in La Porte, Indiana, alongside Mayor Tom Dermody,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?