PrimeInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, 2630 Taastrup, Denmark
Operational
Fully operational facility
Operated by:

Microsoft: Hoje-Taastrup

Short Code: CPH02
Year Built: 2024
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Microsoft's data center is located on Bohus Boulevard in Høje-Taastrup, a town situated 25km west of Copenhagen, Denmark. This facility is one of three data centers built to create a Danish Azure availability zone, a project Microsoft announced in 2020.

  • Waste heat from this new Microsoft data center in Denmark will warm up to 6,000 homes.
  • The data center provides lukewarm water at 20-30oC, which is cheaper for HTF to heat up using heat pumps.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Cloud ParkInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Point ProInterested in this information?Contact us

Distance Site About
0.33 miles STACK Copenhagen COP02
2.06 miles nianet Taastrup
2.08 miles Global Connect Copenhagen Taastrup
4.54 miles GlobalConnect Albertslund (CPH3)
4.65 miles Nianet Vallensbæk
4.77 miles Level3 Copenhagen
5.11 miles Cibicom: Copenhagen West (Smørum)
The Cibicom København Vest (Smørum) data center represents a strategic evolution of Denmark's critical infrastructure, having been acquired as part of the 2018 buyout of Teracom A/S by Agilitas Private Equity.
5.93 miles Penta Infra: Glostrup
7.17 miles nianet Copenhagen Ejby
7.29 miles Telia Copenhagen Ejby
7.38 miles Digital Realty: CPH2
7.41 miles Digital Realty: Copenhagen CPH1
7.42 miles Digital Realty: CPH3
7.55 miles Cibicom: Ballerup
The Cibicom Ballerup data center is a high-security Tier 3 facility located in the Greater Copenhagen tech hub.
7.59 miles Center AlphaInterested in this information?Contact us
Microsoft's first data center facility in Denmark is located in the business area at Finervej, 4621 Gadstrup, Roskilde.
7.82 miles atNorth: DEN01
This Tier III-quality facility occupies a 26,728 sqm plot with room for future expansion and is designed to comply with ISO 27001 and ISO 14001 standards.
10.08 miles Digital Realty: CPH-RS
10.18 miles Core PlazaInterested in this information?Contact us
Microsoft’s CPH03 data center in Køge, part of its Denmark East cloud region, with Phase 2 expansion underway (2026–2028) and designed to operate on 100% renewable energy through power purchase agreements.
10.94 miles AtlasEdge: Copenhagen
11.58 miles Kolo: DK5 Copenhagen
The Kolo DK5 facility is a high-density, AI-optimized data centre in Copenhagen designed for intensive inference and GPU workloads.
12.30 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Verne is planning a data center in Copenhagen, Denmark.
12.53 miles Telia Copenhagen Ørestad
14.04 miles UNI-C Denmark
14.23 miles STACK COP01

East TowerInterested in this information?Contact us Data Center Photos See all

Microsoft Høje-Taastrup Data Center under construction in Denmark
Source: Google Maps
Google, Facebook, and two Apple Data Centers are being constructed in Denmark.
Webscale Data Center Deployments in Denmark
Source: viborg-folkeblad.dk

Google, Facebook, and two Apple Data Centers are being constructed in Denmark.

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read Microsoft Begins Construction of La Porte Data Center Campus
Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took plac...

Microsoft Begins Construction of La Porte Data Center Campus

June 18, 2026 Microsoft Azure

Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took place on June 17. Smith wrote: "Today we broke ground in La Porte, Indiana, alongside Mayor Tom Dermody,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?