Planned
Future facility in planning stage
Operated by:

Microsoft: Lowell, MI

Site planned for 2029 and has expansions through 2031
Utility Provider: Consumers Energy (MISO Zone 7)
Lot Size: 235 acres

Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus. The Lowell facility is a strategic piece of Microsoft’s $80 billion global AI infrastructure investment for 2026. Designed to support the "AI era," the campus is expected to house high-density server environments powered by NVIDIA Blackwell GPUs.

Although the initial 235-acre data center application submitted by Franklin Partners was withdrawn in December 2025 following intense community opposition, Microsoft has since officially identified itself as the project's developer and is moving ahead with a revamped proposal.

Power

  • Utility: Consumers Energy (MISO Zone 7). Lowell Light & Power, the municipal utility serving the City of Lowell and parts of Lowell and Vergennes Townships, does not serve the campus; local reporting puts the load at roughly 50 times LL&P's entire service area.
  • The filed site plan includes a dedicated utility substation alongside five data center buildings and an employee office building on roughly 237 acres.
  • Service would fall under Rate GPD as amended in MPSC Case U-21859 (order Nov 6, 2025): 100 MW minimum service threshold, or 100 MW aggregated across commonly-owned sites of 20 MW or more; 15-year minimum term; ramp-up up to five years; monthly billing at 80% of contract capacity.
  • Consumers Energy signed a large-load agreement for up to 1,000 MW, announced July 2025, and has confirmed it is pursuing an AI training facility with Microsoft near Grand Rapids. The agreement is not tethered to a single site and may span Microsoft's West Michigan cluster (Gaines, Lowell, Dorr).
  • Contract load begins 2028 and ramps through 2030. Local zoning approval is the stated remaining gate.
  • Zoning: rezoning plus a text amendment adding data centers as a permitted use in the LI district. The township board rejected a six-month moratorium 5-2 in May 2026. A revised application was filed in June 2026; the June 8, 2026 planning commission meeting ran six and a half hours without a decision.
  • No MW figure has been disclosed by Microsoft or Lowell Charter Township. The capacity records on this site are estimates.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

ThreeInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Park TwoInterested in this information?Contact us

Distance Site About
9.22 miles Switch: Grand Rapids 2
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
9.35 miles Switch: Grand Rapids (The Pyramid Campus)
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
9.35 miles US Signal: MI01 Grand Rapids East
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
9.54 miles Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
9.72 miles Switch: Grand Rapids 3
This facility is part of Switch's Pyramid Campus in Grand Rapids.
11.14 miles Plaza AlphaInterested in this information?Contact us
Planned Microsoft AI data center campus on ~414 acres at the northwest corner of Patterson Avenue SE and 76th Street SE in Gaines Charter Township, Kent County, southeast of Grand Rapids. Microsoft assembled the site through three transactions beginning August 2024 with a 316-acre purchase from Steelcase, expanded with 40.5 adjacent acres from Republic National Distributing in late 2024, and a third 57.8-acre Steelcase wood plant parcel under contract in 2026. Rezoning to light industrial is pending: the Gaines Township Planning Commission voted 7-0 to table the recommendation on April 15, 2026 following significant community opposition.
15.32 miles 123NET: DC4
15.33 miles US Signal Grand Rapids South
(2) - 800a 480V 3 phase (2) 500kW diesel generators with 24 run time at full load 675kVa UPS with battery backup
15.37 miles ManagedWay Byron Center
17.60 miles Center MaxInterested in this information?Contact us
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
17.85 miles MetroInterested in this information?Contact us
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.

Prime TowerInterested in this information?Contact us Data Center Photos See all

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Unveils Plans for New Data Center in Langley, UK
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Microsoft Unveils Plans for New Data Center in Langley, UK

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?