Planned
Future facility in planning stage
Operated by:

Microsoft: Lowell, MI

Site planned for 2029 and has expansions through 2031
Utility Provider: Consumers Energy (MISO Zone 7)
Lot Size: 235 acres

Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus. The Lowell facility is a strategic piece of Microsoft’s $80 billion global AI infrastructure investment for 2026. Designed to support the "AI era," the campus is expected to house high-density server environments powered by NVIDIA Blackwell GPUs.

Although the initial 235-acre data center application submitted by Franklin Partners was withdrawn in December 2025 following intense community opposition, Microsoft has since officially identified itself as the project's developer and is moving ahead with a revamped proposal.

Power

  • Lowell Light & Power, the municipal utility serving the City of Lowell and parts of Lowell and Vergennes Townships, does not serve the campus; local reporting puts the load at roughly 50 times LL&P's entire service area.
  • The filed site plan includes a dedicated utility substation alongside five data center buildings and an employee office building on roughly 237 acres.
  • Service would fall under Rate GPD as amended by the Michigan Public Service Commission (order Nov 6, 2025): 100 MW minimum service threshold, or 100 MW aggregated across commonly-owned sites of 20 MW or more; 15-year minimum term; ramp-up up to five years; monthly billing at 80% of contract capacity.
  • Consumers Energy signed a large-load agreement for up to 1,000 MW, announced July 2025, and has confirmed it is pursuing an AI training facility with Microsoft near Grand Rapids. The agreement is not tethered to a single site and may span Microsoft's West Michigan cluster (Gaines, Lowell, Dorr).
  • Contract load begins 2028 and ramps through 2030. Local zoning approval is the stated remaining gate.
  • Zoning: rezoning plus a text amendment adding data centers as a permitted use in the LI district. The township board rejected a six-month moratorium 5-2 in May 2026. A revised application was filed in June 2026; the June 8, 2026 planning commission meeting ran six and a half hours without a decision.
  • No MW figure has been disclosed by Microsoft or Lowell Charter Township.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

BetaInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cloud StationInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Switch: Grand Rapids 2
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."
NN milesInterested in this information?Contact us Switch: Grand Rapids (The Pyramid Campus)
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.
NN milesInterested in this information?Contact us US Signal: MI01 Grand Rapids East
Purpose-built from the ground up for data center operations, the Grand Rapids East, Michigan data center is benchmarked to TIA 942 Tier 3 and 4 standards.
NN milesInterested in this information?Contact us Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
NN milesInterested in this information?Contact us Switch: Grand Rapids 3
This facility is part of Switch's Pyramid Campus in Grand Rapids.
NN milesInterested in this information?Contact us PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us 123NET: DC4
NN milesInterested in this information?Contact us US Signal Grand Rapids South
(2) - 800a 480V 3 phase (2) 500kW diesel generators with 24 run time at full load 675kVa UPS with battery backup

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois
The City of Rockford named [Microsoft](https://baxtel.com/data-centers/microsoft-azure) on Nov. 13 as the company evaluating a Monarch Energy-controlled pro![msblogs.thesourcemediaassets.com](/rail...

Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois

November 16, 2026 Microsoft Azure

The City of Rockford named Microsoft on Nov. 13 as the company evaluating a Monarch Energy-controlled property in south Rockford for a data center campus. Microsoft is conducting due diligence on the land and has not submitted a proposal, the city said in its announcement. The land sits along...

Read more
Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) is extending the useful life of its data centers and office buildings to 25 years from 15, effective ![blogs.microsoft.com](/rails/activ...

Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%

October 29, 2026 Microsoft Azure

Microsoft is extending the useful life of its data centers and office buildings to 25 years from 15, effective this fiscal year. The company reported fiscal first-quarter Microsoft Cloud revenue up 30% on Oct. 28, with Azure revenue up 48%, according to Microsoft's earnings release....

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.