Overview
Nordland is a long coastal county in northern Norway that straddles the Arctic Circle. Narvik, in its north, anchors the market. Nscale is building an AI campus at Kvandal outside the town, and Microsoft has contracted its capacity. Further south, crypto sites at Glomfjord and Mo i Rana are converting to AI. Hydropower and industrial parks with their own grids underpin the market.
History
Crypto miners came first. Bitfury opened a bitcoin mine in Mo Industrial Park in March 2018. That year Nordkraft, Narvik's power company, began preparing data-centre sites near grid hubs, among them Kvandal. In 2021 BlueBite moved its mine from Bodø to the old mining town of Sulitjelma, and Hydrokraft opened a crypto mine in Glomfjord Industrial Park. Arkon Energy bought Hydrokraft in 2022. Nscale spun out of Arkon in May 2024 and announced an AI expansion at Glomfjord in March 2025. In July 2025 OpenAI, Nscale and Aker announced Stargate Norway at Kvandal, and Microsoft signed for capacity there that September. Nscale took over Aker's half of the venture in March 2026. OpenAI withdrew in April, and Microsoft took the remaining capacity.
The Market Today
Nscale's Kvandal campus lies near Bjerkvik, north of Narvik. Two groups of buildings, Kvandal South and Kvandal North, are under construction and due during 2027. Microsoft has contracted all of their capacity.
At Glomfjord, Nscale runs GPU clusters at the former crypto site and is adding prefabricated, liquid-cooled modules beside the hall. Net Zero Compute opened an AI factory in the same park in April 2026. In Mo Industrial Park, VivoPower bought the former Bitfury site in 2026 and began converting it to AI that October. Bitcoin hosting continues there until mid-2027. T1 Energy holds the unused Giga Arctic battery factory in the same park. In August 2026 a municipal committee approved data-centre use for part of it.
Nscale also plans a large campus at Korgen and holds a former trotting track at Fauske. BlueBite still mines bitcoin at Sulitjelma. Scale42 plans a data centre at Gjerelvmoen in Sørfold, and Northsafe plans one in a former army mountain hall on Andøya.
Advantages
-
Hydropower. Large hydropower plants stand close to the sites. Statkraft's Svartisen plant near Glomfjord has 600 MW of capacity.
-
Power prices. Nordland lies in NO4, the northern bidding zone, where prices usually run below southern Norway.
-
Industrial parks. Mo Industrial Park and Glomfjord Industrial Park offer existing halls and their own grids.
-
Cooling. The climate is cold, and Net Zero Compute cools its Glomfjord site with outside air and seawater.
Challenges
-
Grid access. Since April 2026 Statnett has accepted no new reservations above 5 MW north of Svartisen. That area covers Narvik, Fauske, Bodø, Glomfjord and Troms. Statnett's national pause on data-centre reservations, set in November 2026, also reaches Mo i Rana and Korgen.
-
Unreserved phases. Nscale's later Kvandal phases and its Korgen campus hold no reserved grid capacity.
-
Appeals. The municipal council adopted Korgen's zoning plan in June 2026. A neighbour's appeal went to the county governor of Nordland that September.
Trends
-
AI replaces crypto. Nscale is rebuilding Hydrokraft's mining hall for GPUs, and VivoPower is converting the Bitfury site. BlueBite now sells some AI compute from Sulitjelma.
-
One developer leads. Nscale holds sites at Kvandal, Glomfjord, Fauske and Korgen. It filed for a US stock listing in 2026.
-
Idle industry converts. T1 Energy seeks data-centre use for a battery factory that it never used.
Power and Policy
Statnett runs the transmission grid. Noranett distributes power around Narvik, Arva around Bodø, Stram at Fauske, and Linea at Korgen and Mo i Rana. Yara runs the grid inside Glomfjord Industrial Park, and Svabo Industrinett runs it inside Mo Industrial Park. Since April 2025 data centres above 2 MW need an approved study of waste-heat use before construction starts.