Tower GammaInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Dorr, MI 49323, USA
Land Bank
Land secured for future development
Operated by:

Microsoft: Dorr 1

Year Planned: 2030
Utility Provider: Consumers Energy (MISO Zone 7)
Ownership: Microsoft Azure owns the building.
Lot Size: 128 acres

In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.

Power

  • Utility: Consumers Energy (MISO Zone 7). Allegan County sits inside Consumers' Lower Peninsula electric territory.
  • Microsoft acquired roughly 272 acres off 144th Avenue near US-131 in 2024 for more than $48M across two parcels. Reporting indicates 128 acres, this parcel, would be developed.
  • The land is already zoned commercial and industrial, which permits a data center, so no rezoning is required.
  • Dorr Township's board approved a 12-month moratorium on data center development in early March 2026, running to roughly March 2027. The township attorney had recommended six months; the board voted twelve.
  • Service would fall under Rate GPD as amended in MPSC Case U-21859. Consumers' up-to-1,000 MW large-load agreement is not tethered to a single site and may span Microsoft's West Michigan cluster (Gaines, Lowell, Dorr).
  • No MW figure has been disclosed by Microsoft or Dorr Township. The capacity record on this site is an estimate.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Sites within 15 miles of Campus PrimeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us PlusInterested in this information?Contact us
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
NN milesInterested in this information?Contact us ManagedWay Byron Center
NN milesInterested in this information?Contact us 123NET: DC4
NN milesInterested in this information?Contact us US Signal Grand Rapids South
(2) - 800a 480V 3 phase (2) 500kW diesel generators with 24 run time at full load 675kVa UPS with battery backup
NN milesInterested in this information?Contact us NorthInterested in this information?Contact us
Planned Microsoft AI data center campus on ~414 acres at the northwest corner of Patterson Avenue SE and 76th Street SE in Gaines Charter Township, Kent County, southeast of Grand Rapids. Microsoft assembled the site through three transactions beginning August 2024 with a 316-acre purchase from Steelcase, expanded with 40.5 adjacent acres from Republic National Distributing in late 2024, and a third 57.8-acre Steelcase wood plant parcel under contract in 2026. Rezoning to light industrial is pending: the Gaines Township Planning Commission voted 7-0 to table the recommendation on April 15, 2026 following significant community opposition.
NN milesInterested in this information?Contact us Switch: Grand Rapids 3
This facility is part of Switch's Pyramid Campus in Grand Rapids.
NN milesInterested in this information?Contact us Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expansion of Pyramid Campus began in 2022.
NN milesInterested in this information?Contact us Switch: Grand Rapids 2
Switch is planning second expansion of its data center campus in Grand Rapids, Michigan. Construction of a third data center building on the site is expected to begin "sooner rather than later," with the investment projected to be "several hundred million dollars."

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?