Center MaxInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Quincy, WA 98848
Operational
Fully operational facility
Operated by:

Microsoft: CO3.2

Site: Prime HubInterested in this information?Contact us
Short Code: CO3.2
Year Built: 2011
Utility Provider: Grant County PUD
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

CO3.2 is the middle of three CO3 buildings on Microsoft's Columbia campus at 501 Port Industrial Parkway in Quincy, Washington. Microsoft built the CO3 group in 2010-2011 with Generation 4 ITPAC modules. CO9 (formerly CO3.1) stands to the north and CO3.3 to the south.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

GlobalInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of South HubInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us South HubInterested in this information?Contact us
CO3.3 is the south building of the CO3 group, which Microsoft built in 2010-2011 on its Columbia campus in Quincy.
NN milesInterested in this information?Contact us South TowerInterested in this information?Contact us
CO9 is a two-level building on Microsoft's Columbia campus in Quincy. Microsoft built it in 2011-2012 as CO3.1 and rebuilt it in 2022-2024 for telecommunications use.
NN milesInterested in this information?Contact us NorthInterested in this information?Contact us
CO7 is a small hall that Microsoft built in 2021-2022 in the northeast corner of its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.
NN milesInterested in this information?Contact us ProInterested in this information?Contact us
CO8 is a small hall that Microsoft built in 2021-2022 at the east end of the CO4 module row on its Columbia campus in Quincy, backed by a 1.5 MWe primary generator and a reserve unit.
NN milesInterested in this information?Contact us ParkInterested in this information?Contact us
CO1 is the east half of the original 470,000 sq ft Columbia building, Microsoft's first data center in Quincy. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.
NN milesInterested in this information?Contact us Core StationInterested in this information?Contact us
CO6 is a hall that Microsoft built in 2019-2021 along the south face of CO2 on its Columbia campus in Quincy, backed by five Caterpillar 3516C 2.5 MWe generators.
NN milesInterested in this information?Contact us Ridge TwoInterested in this information?Contact us
CO2 is the west half of the original 470,000 sq ft Columbia building on Microsoft's first Quincy campus. Its five data halls are backed by 12 Caterpillar 3516C 2.5 MWe diesel generators.
NN milesInterested in this information?Contact us Center PrimeInterested in this information?Contact us
CO5 is a row of open-air modules on Microsoft's Columbia campus in Quincy, built in 2016-2018 and run without backup generators.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported on...

Read more
Read Microsoft Plans 38GW Of Data Center Capacity By 2032
Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with le...

Microsoft Plans 38GW Of Data Center Capacity By 2032

September 11, 2026 Microsoft Azure

Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with leased capacity from third-party providers, including neoclouds such as CoreWeave, Nscale, Lambda,...

Read more
Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?