|
0.25 miles
|
Data4: Warsaw 1 DC2
|
Data4’s second data center at its Jawczyce campus near Warsaw is a 10MW facility, expanding the multi-phase site toward a planned 60MW, four-building development on a 4-hectare campus.
|
|
0.29 miles
|
Data4: Warsaw 1
|
In 2023, Data4 Group opened their first Polish data center in the campus located in Jawczyce, near Warsaw, on a 4 hectares site.
|
|
0.29 miles
|
Data4: Warsaw 1 DC4
|
|
|
0.32 miles
|
Data4: Warsaw 1 DC3
|
|
|
0.92 miles
|
Switch Datacenters: Warsaw 1
|
|
|
1.73 miles
|
EdgeConnex: Warsaw 3
|
The EdgeConneX WAW03 facility in Diamond Business Park launched in Warsaw, Poland, in 2022.
|
|
1.75 miles
|
EdgeConneX: Warsaw 4
|
The data center operator EdgeConneX has reportedly secured a 15-year lease for the Digital Ursus site with Greykite European Real Estate Fund I, its affiliates, and White Star Real Estate.
|
|
1.79 miles
|
Greykite: Warsaw
|
UK-based investment firm Greykite is transforming a former logistics site in Warsaw, Poland, into a data center.
|
|
1.85 miles
|
OVH Warsaw WAW1
|
|
|
1.87 miles
|
Atman: WAW-3 Bldg3
|
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
|
1.93 miles
|
Atman: WAW-3 Bldg2
|
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
|
1.98 miles
|
Atman: Warsaw-3 Campus
|
Atman Data Center Warsaw-3 (WAW-3) Campus is located near Warsaw, the largest business hub of CEE. The campus will eventually consist of 3 buildings.
|
|
2.87 miles
|
Hillwood: Reguły 4
|
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
|
2.88 miles
|
Hillwood: Reguły 3
|
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
|
2.97 miles
|
Hillwood: Reguły 2
|
This facility is part of Hillwood's Reguły Campus near Warsaw.
|
|
2.99 miles
|
Hillwood: Reguły Campus
|
Property developer Hillwood is planning a data center campus on a 40-hectare site in Reguły, southwest of Warsaw. The project, which includes four planned buildings, has faced significant local pushback.
|
|
3.49 miles
|
Equinix WA3
|
The Warsaw WA3 data center is located in the Salomea District of Poland.
|
|
4.06 miles
|
Equinix: WA4x
|
WA4x is Equinix's first xScale (Hyperscale) data center in Warsaw, powered by 100% renewable energy.
|
|
4.19 miles
|
EdgeConnex: Warsaw 2
|
The EdgeConneX WAW02 facility, a hyperscale, carrier-neutral, Tier-3 designed data center offering N+1 configuration, launched in Warsaw, Poland, in 2022.
|
|
4.96 miles
|
VOLT: Warsaw 1
|
Volt is potentially leasing capacity from Switch's Warsaw 1 data center facility.
|
|
6.19 miles
|
Vantage: WAW12
|
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
|
6.20 miles
|
Vantage: WAW13
|
Third data center of Vantage's Warsaw WAW1 campus; ~16 MW, liquid-cooled, planned.
|
|
6.22 miles
|
Vantage Warsaw WAW1
|
Vantage’s Warsaw campus in Poland sited on more than 12 acres (5 hectares) just a half hour drive from Warsaw-Chopin International Airport.
|
|
6.37 miles
|
EdgeConnex Warsaw
|
The site was acquired from Linxdatacenter in November 2018. The facility also offers connectivity to the neighboring LIM-Building ecosystem via a diverse fiber path.
|
|
6.59 miles
|
LIM Warsaw
|
|
|
6.59 miles
|
Equinix Warsaw WA1
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
|
6.64 miles
|
Atman: Warsaw-2
|
|
|
6.79 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
6.84 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
6.97 miles
|
Hyperscale Data Center
Request Dataset
|
Microsoft launched Polish Azure region in 2023.
|
|
7.22 miles
|
Netia WARSC001
|
|
|
7.75 miles
|
Equinix Warsaw WA2
|
The site was a Telecity managed datacenter before Equinix acquired Telecity in July 2016.
|
|
8.10 miles
|
Netia Warszawa WARSC006
|
|
|
9.24 miles
|
3S Warszawa, Annopol
|
|
|
9.50 miles
|
FR Investment: Kajetany
|
Proposed by FR Investment Poland Sp. z o.o. (a subsidiary of the Futureal Group), the Kajetany data center is a planned facility located on a 2-hectare plot at Orlej street.
|
|
9.79 miles
|
Orange: Warsaw
|
In 2021, Orange opened a data center in Warsaw, Poland. The European telco's new Warsaw Data Hub facility contains four 400 sq m (4,305 sq ft) data halls that hosts both the telco's network infrastructure and hosting services for customers.
|
|
10.03 miles
|
T-Mobile Warszawa-Szlachecka
|
In 2022, T-Mobile launched the Szlachecka data center in Warsaw, Poland.
|
|
11.41 miles
|
Aruba Poland PL1
|
|
|
11.42 miles
|
Atman: Warsaw-1
|
|
|
11.54 miles
|
T-Mobile Warszawa-Piasecznie
|
|
|
14.36 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
19.56 miles
|
DL Invest: Teresin, Poland
|
A highly resilient data infrastructure asset located in Teresin, Poland, positioned on a flood-free terrain near Warsaw to serve as a high-density regional cloud hub and specialized disaster recovery site.
|