Planned
Future facility in planning stage
Operated by:

Microsoft: Orchard Pkwy

Year Planned: 2028
Ownership: Microsoft Azure owns the building.
Lot Size: 21 acres

Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 30.6 acres to Microsoft for $78.7 million.

  • The 30+ acre data center project would be right next door to a mixed-use village in North San Jose consisting of offices, hotels, and retail. That project, which is being led by LBA Realty, could clock in at 1.28 million SQFT.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Central ParkInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of EdgeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Goodman Innovation Bldg1
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
NN milesInterested in this information?Contact us Goodman Innovation Bldg2
NN milesInterested in this information?Contact us Connect Data Centers: Santa Clara, CA
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
NN milesInterested in this information?Contact us Digital Realty: SJC11
NN milesInterested in this information?Contact us Tishman Speyer: Santa Clara
In July 2026, global real estate firm Tishman Speyer acquired CyrusOne’s 23.6-acre Santa Clara data center site for $65.4 million.
NN milesInterested in this information?Contact us Digital Realty: SJC37
NN milesInterested in this information?Contact us StratCap: 3205 Bassett
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
NN milesInterested in this information?Contact us Digital Realty: SJC31
Digital Realty's SJC31 is a Powered Base Building at 2805 Lafayette Street on the company's Silicon Valley campus in Santa Clara, with about 58,000 sq ft of raised floor in eight Turn-Key Flex data halls.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) is extending the useful life of its data centers and office buildings to 25 years from 15, effective ![blogs.microsoft.com](/rails/activ...

Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%

October 29, 2026 Microsoft Azure

Microsoft is extending the useful life of its data centers and office buildings to 25 years from 15, effective this fiscal year. The company reported fiscal first-quarter Microsoft Cloud revenue up 30% on Oct. 28, with Azure revenue up 48%, according to Microsoft's earnings release....

Read more
Read ZutaCore Unveils Two-Phase Matrix Flow Boiling for AI Cold Plates
ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds w...

ZutaCore Unveils Two-Phase Matrix Flow Boiling for AI Cold Plates

October 26, 2026 San Francisco Bay Area

ZutaCore unveiled Two-Phase Matrix Flow Boiling, the cooling architecture inside its OmniTherm cold plate family, at OCP Global Summit 2026 on Oct. 13. The Foster City, California, company builds waterless, direct-to-chip two-phase liquid cooling for AI and high-performance computing servers. The...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.