AlphaInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Iskandar Puteri, Johor 81550, Malaysia
Under ConstructionProspective Expansion
New facility under constructionfacility with prospective expansion planned
Operated by:

Microsoft: JHB05

Short Code: JHB05
Year Planned: 2028
PUE: 1.28
Utility Provider: Tenaga Nasional Berhad
Lot Size: 86 acres

JHB05 is the first Microsoft data center to rise on land it bought from Crescendo Corporation at Nusa Cemerlang Industrial Park, Iskandar Puteri. Six colocation buildings with administration, support and security facilities cover about a third of the site. Microsoft plans a cloud region in Johor Bahru, Southeast Asia 3, and has not given an opening date.

Site History

  • November 2025: Microsoft announces the Southeast Asia 3 region in Johor Bahru.
  • May 2024: Microsoft completes the purchase of the second lot for RM132.5 million.
  • February 2024: Microsoft completes the purchase of the first lot for RM315.2 million.

Map and Nearby Locations

This Facility ( Nusa Cemerlang Industrial Park )
Microsoft Azure Sites
Nearby Facilities

AlphaInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Metro PointInterested in this information?Contact us

Distance Site
NN milesInterested in this information?Contact us Core TowerInterested in this information?Contact us
NN milesInterested in this information?Contact us Epoch Digital: Johor
NN milesInterested in this information?Contact us Digital Halo: Johor
NN milesInterested in this information?Contact us Edgnex: Johor
NN milesInterested in this information?Contact us STT Johor Campus
NN milesInterested in this information?Contact us Telekom Malaysia: IPDC 2
NN milesInterested in this information?Contact us Telekom Malaysia: IPDC 1
NN milesInterested in this information?Contact us DayOne: NTP-C

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Files for 316.7-Acre LVL-16 Data Center Campus in Mecklenburg County
Microsoft has applied to the [US Army Corps of Engineers](https://www.nao.usace.army.mil/Media/Public-Notices/Article/4652463/nao-2024-02558-vrmc-26-1656-lvl16-visor-king-data-center-mecklenburg-va...

Microsoft Files for 316.7-Acre LVL-16 Data Center Campus in Mecklenburg County

November 20, 2026 Microsoft Azure

Microsoft has applied to the US Army Corps of Engineers for a five-building data center campus on 316.7 acres in Mecklenburg County, Virginia. Microsoft filed the application, labeled LVL-16, with the corps' Norfolk District under Section 404 of the Clean Water Act. The Norfolk District is...

Read more
Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

November 18, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois
The City of Rockford named [Microsoft](https://baxtel.com/data-centers/microsoft-azure) on Nov. 13 as the company evaluating a Monarch Energy-controlled pro![msblogs.thesourcemediaassets.com](/rail...

Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois

November 16, 2026 Microsoft Azure

The City of Rockford named Microsoft on Nov. 13 as the company evaluating a Monarch Energy-controlled property in south Rockford for a data center campus. Microsoft is conducting due diligence on the land and has not submitted a proposal, the city said in its announcement. The land sits along...

Read more
Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.