Latest Podcast Street AddressInterested in this information?Contact us, Quincy, WA 98848
Operational
Fully operational facility
Operated by:

Microsoft: MWH01 AZ-A

Short Code: MWH01 AZ-A
Year Built: 2015
Utility Provider: Grant County PUD
Lot Size: 193 acres

Sites on this Campus:

░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

MWH01 AZ-A is one of four first-phase AZ halls at 1515 NW Port Industrial Parkway in Quincy, Washington. Microsoft built the phase in 2015 on the campus Ecology first permitted as the Oxford Data Center.

The hall follows Microsoft's Generation 5 design with adiabatic cooling and no chillers. Four Caterpillar 3516C 2.5 MWe diesel generators back it up, plus one reserve unit added in 2016. Grant County PUD serves the campus from its Mountain View substation.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

CentralInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of StationInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Station OneInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us SouthInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us StationInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us North StationInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us ThreeInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us Valley TwoInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us Prime RidgeInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
NN milesInterested in this information?Contact us Hub UltraInterested in this information?Contact us
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported on...

Read more
Read Microsoft Plans 38GW Of Data Center Capacity By 2032
Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with le...

Microsoft Plans 38GW Of Data Center Capacity By 2032

September 11, 2026 Microsoft Azure

Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with leased capacity from third-party providers, including neoclouds such as CoreWeave, Nscale, Lambda,...

Read more
Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents

Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024
Document

Operator data sheet

January 2024

Ready to Level up Your
Data Center Strategy?