Center GammaInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Palmetto, GA 30268
Operational
Fully operational facility
Operated by:

Microsoft: Palmetto 2

Site: Plaza PlusInterested in this information?Contact us
Short Code: Building 2
Year Built: 2026
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Campus OneInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of East ValleyInterested in this information?Contact us

Distance Site About
0.08 miles Park TwoInterested in this information?Contact us
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
0.89 miles T5: ATL IV
US data center firm T5 Data Centers plans for a sprawling a 1.32 million square foot data center campus just outside of Atlanta, Georgia.
2.29 miles Fairburn Technology Center
Bohannon Road Venture LLC is planning to develop 1.19 million sq ft (110,500 sqm) of data center space, spanning three buildings on a 59-acre site.
2.80 miles Strategic Real: Palmetto
Located at 300 Johnston Circle in Palmetto, the campus will comprise up to eight data center buildings totaling 2.1 million sq ft. on a 320-acre site known as Project Peach.
2.81 miles Strategic Real: Palmetto Expansion
2.87 miles Global PlazaInterested in this information?Contact us
2.92 miles Hub AlphaInterested in this information?Contact us
Microsoft is advancing a major infrastructure presence in Northeast Pennsylvania, centered on a two-building data center campus in Newton Township.
6.50 miles Carrier-Neutral Data CenterInterested in this information?Contact us
6.98 miles QTS: Fayetteville DC14
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.01 miles QTS: Fayetteville DC2
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.12 miles QTS: Fayetteville DC13
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.13 miles QTS: Fayetteville DC15
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.14 miles TA Realty: Red Oak ATL03
TA Realty has filed an application with the Georgia Department of Community Affairs to build a data center campus at 7170 Red Oak Road in Union City, Fulton County.
7.20 miles QTS: Fayetteville DC12
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.22 miles QTS: Fayetteville DC8
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.31 miles QTS: Fayetteville DC11
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.32 miles QTS: Fayetteville DC16
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.33 miles Hyperscale Data CenterInterested in this information?Contact us
7.34 miles QTS: Fayetteville DC9
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.44 miles QTS: Fayetteville DC10
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.59 miles QTS: Fayetteville DC7
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.75 miles QTS: Fayetteville DC5
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.80 miles QTS: Fayetteville DC4
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.82 miles Central CenterInterested in this information?Contact us
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.
7.85 miles QTS: Fayetteville DC3
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
7.92 miles Vantage: Georgia GA1
Vantage Data Centers is planning a data center campus outside Atlanta, Georgia.
7.95 miles EdgeConneX: Atlanta ATL11-13
The data center campus will be developed by EdgeConnex on 136 acres of land that Microsoft purchased in Fulton County in April 2024 for $53.5 million.
7.98 miles QTS Fayetteville
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
8.02 miles Valley ThreeInterested in this information?Contact us
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
8.02 miles QTS: ATL2 East Campus
ATL2 East is a massive 2-million-square-foot expansion to the QTS Fayetteville campus, designed to meet the soaring demand for AI and hyperscale cloud infrastructure.
8.10 miles West TowerInterested in this information?Contact us
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
8.20 miles South PointInterested in this information?Contact us
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
8.98 miles Carrier-Neutral Data CenterInterested in this information?Contact us
10.45 miles Plaza AlphaInterested in this information?Contact us
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
11.16 miles Park AlphaInterested in this information?Contact us
CleanSpark’s first ever Bitcoin mining facility is in College Park, Georgia. It sits on six acres near the Hartsfield-Jackson Atlanta International Airport
11.24 miles Crow Holdings: Fayetteville, GA
Crow Holdings Development has officially withdrawn its application to construct a single, two-story data center and dedicated substation on a 37.4-acre parcel of land in Fayetteville, Georgia.
12.52 miles Lumen College Park 1
12.83 miles Vantage: Douglasville 3
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
12.86 miles Vantage: Douglasville 2
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
12.96 miles Vantage: Douglasville
Vantage Data Centers is building a 1.7 million Sqft data center complex in suburban Atlanta.
13.15 miles Vantage: Georgia GA2
The project, known as Westlake, will comprise a 754,220-square-foot (70,070 sqm) facility on undeveloped land west of Plummer Road and north of Riverside Drive in South Fulton, east of the existing Quaker facility.
13.31 miles American Tower: SW Atlanta
American Tower operates a data center on Fairburn Road Southwest in Atlanta, Georgia.
13.98 miles Aligned: ATL-01
Aligned's ATL-01 is the company's Atlanta-market data center at 1551 N River Road in Lithia Springs (Douglas County), Georgia. The ~280,000 sq ft facility on ~44 acres is a conversion of the former Sweetwater Creek Logistics Center, in the metro's fast-growing western data center corridor.
14.26 miles PointInterested in this information?Contact us
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.33 miles Station MaxInterested in this information?Contact us
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.34 miles Flexential: Douglasville 2
This data center is a part of Flexential's Douglasville Campus in Atlanta-Douglasville, Georgia.
14.35 miles CoreWeave: Douglasville, GA
CoreWeave will expand its data center footprint into two new co-location facilities in Hillsboro, Oregon and Douglasville, GA, both of which are owned and operated by Flexential.
14.41 miles Flexential Douglasville
Flexential's Douglasville data center campus is located at 1700 N. River Rd, Douglasville. The first building of the campus spans an area of 204,514 square feet.
14.41 miles HubInterested in this information?Contact us
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.48 miles HubInterested in this information?Contact us
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
14.53 miles DC BLOX: ATL1-B
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building B is due for delivery in early 2028.
14.61 miles DC BLOX: Atlanta West (ATL1)
DC BLOX is offering a hyperscale-ready data center campus in Douglasville, Georgia, referred to as Atlanta West.
14.61 miles DC BLOX: ATL1-C
This data center building is a part of DC Blox ATL West Campus in Atlanta, Georgia. Building C is due for delivery in early 2029.
15.11 miles Core TowerInterested in this information?Contact us
Amazon has purchased 118 acres for a potential new data center in Douglas County to the west of Atlanta for $37M.
15.21 miles PwC Lithia Springs
PricewaterhouseCoopers (PwC) operates a data center on Rock House Road in Lithia Springs, Georgia.
15.21 miles DataCanopy: Lithia Springs (Atlanta)
15.31 miles Menlo Digital: Atlanta, GA
In July 2025, Digital Realty sold the facility in Atlanta to Menlo Equities for $65.5m. The site totals around 31,000 sqm.
15.48 miles Centersquare: ATL1
Centersquare's Lithia Springs data center ATL1 is located less than 20 miles from Atlanta Hartsfield International Airport.
15.48 miles 375 Riverside - Digital Realty
The facility was built in 1998, renovated in 2008, and offers 32 MW of power. It is occupied by three large tenants from the managed services (Cyxtera), telecommunications (AT&T) and healthcare services industries (Cigna Health Insurance.)
15.60 miles Rock House Road data center, Atlanta
The Rock House Road Data Center Site project is located at 1971 Rock House Road in Douglas County’s Lithia Springs would span 1.465 million sq ft (136,100 sqm) across four buildings and an on-site substation.
15.64 miles Digital Realty: ATL11
Digital Realty has fully leased the building to a triple net client. The client is likely Google.
15.81 miles Ridge AlphaInterested in this information?Contact us
Google announced in 2018 that it will acquire 78.8 MW of solar power to run the data center.
15.89 miles Prologis: Project Sail
Logistics real estate giant Prologis acquired Project Sail. The revised plan includes up to nine buildings with 4.34 million square feet of space.
15.97 miles Point AlphaInterested in this information?Contact us
Google completed the expansion of its Douglas County data center in 2016.
16.02 miles DataBank: Lithia Springs ATL5
DataBank's Lithia Springs Campus spans 95 acres and will accommodate two multi-story data centers, offering up to 1 million gross square feet (92,900 sqm) of space.
16.03 miles DataBank: Lithia Springs ATL6
This facility will be the second data center building at DataBank's Lithia Springs Campus.
16.10 miles Prologis: Sail Bldg3
This facility is part of Prologis' Project Sail in Atlanta.
16.13 miles Prologis: Sail Bldg5
This facility is part of Prologis' Project Sail in Atlanta.
16.13 miles Prologis: Sail Bldg4
This facility is part of Prologis' Project Sail in Atlanta.
16.14 miles Switch Atlanta: The KEEP
16.33 miles DataBank: Atlanta ATL4
DataBank's ATL4 is a single-tenant data center located less than 30 minutes from downtown Atlanta. The site is backed by an adjacent Georgia Power substation and features 156,780 raised sqft.
16.34 miles T5@Atlanta III Bldg 3
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.34 miles T5@Atlanta III Bldg 5
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.36 miles T5@Atlanta III Bldg 4
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.38 miles Prologis: Sail Bldg7
This facility is part of Prologis' Project Sail in Atlanta.
16.40 miles Prologis: Sail Bldg6
This facility is part of Prologis' Project Sail in Atlanta.
16.49 miles Switch: Atlanta 3
16.49 miles T5@Atlanta III Bldg 2
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.60 miles STACK: ATL02B
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
16.62 miles T5@Atlanta III Campus
T5@Atlanta III Campus is an 80-acre dedicated Hyperscale Data Center campus situated conveniently 18 miles from the ATL Airport and 16 miles from Downtown Atlanta. The campus comprises five data center buildings.
16.64 miles STACK Atlanta ATL02
Stack Infrastructure is to build two data centers outside Atlanta, Georgia. The project, known as the Lithia Springs Data Center, will see two three-story data centers developed at 808 Factory Shoals Road.
16.67 miles Prologis: Sail Bldg2
This facility is part of Prologis' Project Sail in Atlanta.
16.68 miles Prologis: Sail Bldg8
This facility is part of Prologis' Project Sail in Atlanta.
16.69 miles Prologis: Sail Bldg9
This facility is part of Prologis' Project Sail in Atlanta.
17.81 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
17.82 miles Project Douglas Waldrop
The Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development, is a major infrastructure expansion in the Winston community of Douglas County, Georgia.
17.87 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
17.94 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
17.96 miles Douglas Waldrop Bldg-2
This facility is part of the Douglas Waldrop data center project, led by Trammell Crow subsidiary TC Atlanta Development in Douglas County, Georgia.
18.01 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.10 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.27 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.36 miles Carrier-Neutral Data CenterInterested in this information?Contact us
The company aims to develop a data center complex spanning 246 acres, which will include nine data center buildings and two substations.
18.44 miles Digital Realty: ATL 15
Digital Realty plans to develop a two-building data center campus in Forest Park, Clayton County, Georgia, just nine miles south of Atlanta.
18.48 miles Cogent: Atlanta 2
Cogent's Atlanta 2 data center offers 36,172 square feet of colocation space, featuring 42U cabinets and providing private cage options for customers.
18.53 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.53 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Stream Data Centers' Atlanta West Campus (ATL-A) in Georgia.
18.56 miles EdgeConneX ATL01
EdgeConnex ATL01 facility spans 29,527 square feet and features two data halls. Within this facility, 6,322 square feet of raised floor space is dedicated to tenant racks, allowing for flexible colocation and infrastructure deployment.
18.56 miles EdgeConneX Atlanta Campus
The Atlanta EdgeConneX site has attracted MSOs (Charter, Comcast) and content companies (Netflix and Twitch) into their data center.
18.56 miles EdgeConneX ATL02
In 2018, EdgeConneX launched its second data center in Atlanta.
18.56 miles Lumen Atlanta 5
18.59 miles DataBank Atlanta ATL3
DataBank completed the expansion of ATL3, one of the company’s three Atlanta area data center locations.
18.60 miles DataBank Atlanta ATL2
18.60 miles Hickman Property Expansion
18.60 miles Hickman Property Project
The development is planned for a 700-acre site in Douglas County, with approximately 35 acres situated within the city limits of Villa Rica, which lies about 30 miles west of Atlanta.
19.24 miles Hampton Technology Park
The planned data center campus in Hampton, Georgia, represents a massive infrastructure expansion roughly 35 miles south of downtown Atlanta.

UltraInterested in this information?Contact us Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read Microsoft Begins Construction of La Porte Data Center Campus
Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took plac...

Microsoft Begins Construction of La Porte Data Center Campus

June 18, 2026 Microsoft Azure

Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took place on June 17. Smith wrote: "Today we broke ground in La Porte, Indiana, alongside Mayor Tom Dermody,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your