Under Construction
New facility under construction
Operated by:

Microsoft: Alviso 1

Year Planned: 2028
Floors: 2
Ownership: Microsoft Azure owns the building.
Lot Size: 65 acres

Sites on this Campus:

  • Cloud ValleyInterested in this information?Contact us

Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.

  • The San Jose Planning Commission approved this project in 2025. Microsoft first proposed the plan in 2019, but it was put on hold. It was later reviewed along with a request for parking exceptions from 2022.

  • The new campus will have two one-story data center buildings with office space, a new 115-kilovolt electrical substation, and a rebuilt visitor center.

  • To build the new data center, 79 trees will need to be removed. However, 273 new trees will be planted to replace them. The project also includes taking down and moving the current 1,440-square-foot Valley Water Purification Visitors Center.

  • Microsoft paid $73.2 million for the land on the western banks of Coyote Creek in September 2017.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Plaza PrimeInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Point OneInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Tower ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Prologis: San Jose 1
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
NN milesInterested in this information?Contact us Prologis: San Jose 2
This facility is part of Prologis' data center campus in San Jose, California.
NN milesInterested in this information?Contact us Prologis: San Jose 3
This facility is part of Prologis' data center campus in San Jose, California.
NN milesInterested in this information?Contact us 400 Holger Way, San Jose
NN milesInterested in this information?Contact us Prologis: San Jose 4
This facility is part of Prologis' data center campus in San Jose, California.
NN milesInterested in this information?Contact us MicroLink: Bay Area, CA
MicroLink is planning to build a data center in San Jose, California.
NN milesInterested in this information?Contact us Menlo: 300 Holger Way
A proposal has been approved for a data center at 300 Holger Way in North San Jose, California, though the official permit filings do not explicitly name the developer or operator.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more
Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?