Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.
As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.
82 Facilities Owned
30 Markets Served
░░░░░ Login to view MW Total Power
In January 2019, GI Partners bought the more than 1 million-square-foot office and tech complex at 2300 W. Plano Parkway near Bush Turnpike.
The site was opened in June 2011, is located in Rümlang near Zurich.
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
DC5 is located at Chandivali
The four-story data centre campus will be situated in an industrial area located 30km east of central Jakarta, and will be in Indonesia at the end of 2020.
RagingWire's Sacramento's data center campus is split among 3 buildings (CA1, CA2, and CA3)
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.
The almost 54,000 sqm campus, which is owned by e-shelter, offers space for five free-standing buildings
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
NTT announced that its Global Data Centers division will develop and operate its first data centre campus in Paris, France. The campus, spanning 35.5 acres, is set to support a planned capacity of 84 MW across three data centres.
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
Expansion site acquired in November 2023.
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
The 102-acre campus will have seven data centers offering a total of 240 MWs of critical IT load and 1.5 million sqft of space, along with an on-site dedicated substation. The first data center will offer 36MW across six 6MW vaults and 126,000 sqft
The 144MW site will consist of five buildings with a total space of 1 million sq ft (93,000 sq m).
RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
e-shelter Frankfurt 3 Campus is located in the business park "Blauer See" in Rüsselsheim.
The data center was first built by Dell in 2012. Subsequently sold to NTT Data in the Perot services deal.
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" in some of the planning documents.