2.67 miles
|
Infinity Romford North and South
|
|
2.68 miles
|
Green Mountain: London East Bldg 2
|
Green Mountain is expanding its London data center footprint for its existing facilities in the capital.
|
2.76 miles
|
Green Mountain: London East
|
The parent company of Norwegian-based Green Mountain has acquired Infinity SDC Ltd, taking over a data center in Romford, East London.
|
3.83 miles
|
OVH London LON-1
|
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
|
5.83 miles
|
Google: Purfleet
|
Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments.
|
7.42 miles
|
Custodian Dartford DA2
|
|
7.68 miles
|
Kao Data: Bidder Street, Newham
|
A new data center named as Bidder Street Data Center has been proposed in the Newham area of East London, UK. At full build out the multi-story data center will total approximately 60,510 sqm (651,325 sq ft).
|
7.77 miles
|
Netwise London East (NLE)
|
Situated in East London near City Airport, the facility is powered entirely by renewable energy. It boasts a highly efficient cooling system, utilizing evaporative technology to achieve a design Power Usage Effectiveness (PUE) of 1.05 (design capacity, not annualized).
|
8.02 miles
|
Verizon London THW
|
|
8.03 miles
|
Telehouse London Docklands (North, East, West)
|
Telehouse operates five data centers in London, four at its Docklands campus in East London, consisting of Telehouse North (opened 1990), Telehouse East (opened 1999), Telehouse West (opened 2010), and Telehouse North Two (opened in 2016.)
|
8.06 miles
|
Global Switch London Docklands Campus
|
|
8.07 miles
|
Global Switch: London South
|
Global Switch plans for the construction of a new data center in London Docklands. The new five-floor 290,625sqft data center, known as London South, will expand Global Switch’s London site.
|
8.07 miles
|
GTT London GS2
|
|
8.15 miles
|
Telehouse South
|
Telehouse is expanding its Telehouse South facility in London, UK.
|
8.16 miles
|
Level3 London (E India Dock)
|
|
8.54 miles
|
Infinity SDC HereEast
|
|
8.63 miles
|
Digital Sovereign House (227 Marsh Wall)
|
|
8.64 miles
|
Digital Meridian Gate (215 Marsh)
|
Located in London Docklands, the Memaco House facility sits in close proximity to the city's many transport links. Memaco House provides 1,630 sq m of well-connected premium customer space over four floors.
|
8.81 miles
|
Equinix London LD8 Harbour Exchange (Docklands)
|
Equinix LD8 was known as Telecity Harbour Exchange (HEX) until July 2016. The facility is the second most connected data centre ecosystem in London.
|
8.82 miles
|
nLighten: London Citi
|
In April 2024, nLighten acquired the site from Exa Infrastructure.
|
9.00 miles
|
Digital Docklands: Cloud House
|
|
9.03 miles
|
DRT London (Bonnington House)
|
|
9.04 miles
|
AIMES DC3 Mastmaker Road
|
|
9.06 miles
|
City Reach London Docklands
|
|
9.06 miles
|
Echelon LCY10
|
Echelon’s existing UK facility, LCY10, is a 12,000 sqm (129,000 sq ft)data center located in London’s Docklands.
|
9.08 miles
|
Keppel GV7 London
|
The Keppel London GV7 Data Centre is a newly refurbished data centre located in a secure estate within Canary Wharf, London.
|
9.08 miles
|
Cyxtera London LO3 & LO4
|
|
9.45 miles
|
Coreix Docklands
|
|
10.35 miles
|
Colt London I
|
|
10.53 miles
|
Ark: Meridian Park
|
|
10.74 miles
|
Internap London
|
|
10.76 miles
|
Interxion London 2
|
|
10.76 miles
|
Level3 London (120 Leman)
|
|
10.84 miles
|
Interxion LON1 LON3
|
|
10.87 miles
|
Level3 London (Braham)
|
|
11.04 miles
|
Colt House London
|
|
11.09 miles
|
Netwise London Central
|
The Old Jamaica Road data center officially began operations in 2016. It features two data halls in 11,000 sq ft of space with a combined 6,000 sq ft of white space, accommodating 200 racks.
|
11.20 miles
|
Redcentric London
|
|
11.23 miles
|
Telehouse London Metro
|
|
11.25 miles
|
Epsilon London Telephone House
|
|
11.27 miles
|
iomart DC2 London
|
|
11.35 miles
|
1 Olivers Yard - Digital Realty
|
This site was formerly a Telecity site that was acquired by Equinix (January 2016) and subsequently sold to Digital Realty Trust (July 2016.)
|
11.82 miles
|
Google: North Weald Airfield
|
Google paid a£88.2 million for 52 acres (21 hectares) of land at a former RAF airbase.
|
11.97 miles
|
Volta EC1
|
The data centre is stacked vertically over seven stories and has a Tier III data centre design.
|
12.00 miles
|
Lumen: Goswell Rd
|
|
12.17 miles
|
Level3 London (10 Fleet)
|
|
12.24 miles
|
VIRTUS London1 Enfield
|
|
12.88 miles
|
aptum London
|
|
13.05 miles
|
Coreix Enfield
|
|
13.23 miles
|
Verizon London UK5
|
|
13.59 miles
|
NYSE Basildon
|
|
14.02 miles
|
Google: Waltham Cross
|
Google has started building a new data centre in Waltham Cross, Hertfordshire.
|
14.03 miles
|
Zenium London One
|
|
15.39 miles
|
Visa United Kingdom
|
|
15.45 miles
|
Kao Data: Harlow
|
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
15.51 miles
|
Kao Data: Harlow 3
|
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
15.51 miles
|
Kao Data: Harlow 2
|
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
15.58 miles
|
Kao Data: Harlow 4
|
The KAO datacentre campus is located in the London-Stansted-Cambridge technology corridor.
|
17.50 miles
|
LDeX London LDeX1
|
|
17.58 miles
|
DRT London (Croydon)
|
|
18.42 miles
|
Pulsant South London
|
|
18.54 miles
|
Vantage London I Campus
|
|
18.57 miles
|
Colt Powergate
|
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
18.61 miles
|
Equinix London LD9 Powergate
|
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
18.61 miles
|
Microsoft: Park Royal
|
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
18.74 miles
|
Options West London
|
|
18.81 miles
|
Vantage London II
|
|
19.28 miles
|
Equinix London LD3
|
|
19.50 miles
|
Ark: Alliance Park
|
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|