NTT Osaka 7

Latest Podcast Kyusaigokukaido
Operational
Fully operational facility
Operated by:

NTT Osaka 7

Year Built: 2019
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

Kyusaigokukaido
NTT Sites
Nearby Facilities

NTT Osaka 7 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT Osaka 7

Distance Site About
1.08 miles NTT: Nishiai
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
2.63 miles Vantage: Osaka KIX11
Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.
2.64 miles Vantage: KIX12
This facility will be part of Vantage's Osaka (KIX1) Campus in Osaka, Japan.
2.70 miles CapitalLand: Osaka 01
The new facility will include more than nine data halls along with dedicated office and working spaces to support operations.
3.61 miles NRI: Osaka Data Center II Building 1
NRI's Osaka Data Center II is Nomura Research Institute's Kansai core and disaster-recovery data center in the Saito district of Ibaraki City. Building 1 opened in 2016 as a base-isolated facility certified to JDCC Tier 4. NRI runs its shared financial systems and outsourcing services here, and TIS markets colocation as GDC Osaka.
3.66 miles NRI: Osaka Data Center II Building 2
Building 2 of NRI's Osaka Data Center II opened in February 2023 beside Building 1 in the Saito district of Ibaraki City. The two buildings share power-receiving equipment and serve NRI's shared financial systems and outsourcing services.
3.72 miles MC Digital Realty: KIX15
KIX15 is MC Digital Realty's fifth data center on its KIX Campus in the Saito district of Ibaraki City, north of Osaka. The base-isolated building rises beside KIX10 and supports hybrid air and liquid cooling for hyperscale, cloud, and AI customers. MC Digital Realty is the 50/50 joint venture of Mitsubishi Corporation and Digital Realty.
3.73 miles MC Digital Osaka 1 (KIX10)
3.80 miles MC Digital Osaka 2 (KIX11)
3.85 miles MC Digital Osaka 3 (KIX12)
3.97 miles MC Digital Osaka 4 (KIX13)
4.11 miles Equinix: OS5x
4.12 miles Equinix: OS4x
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
4.13 miles Equinix: OS2x
5.41 miles IIF Osaka Toyonaka
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
6.11 miles Colt: Minoh 2
This facility is part of Colt's Minoh Campus in Osaka, Japan.
6.11 miles ESR Group: Minoh, Osaka
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
6.11 miles Colt: Minoh 1
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
6.50 miles SoftBank: Osaka Suita
SoftBank data center in Suita, about 5 km from central Osaka, with dedicated links to the Dojima internet exchange.
8.17 miles EdgeConneX: Osaka Yawata
EdgeConneX expands in Japan, securing a long-term land lease for its second data center site in Greater Osaka/Yawata.
8.21 miles EdgeConneX: Yawata 3
This facility is part of EdgeConneX Yawata Campus in Osaka.
8.21 miles EdgeConneX: Yawata 2
This facility is part of EdgeConneX Yawata Campus in Osaka.
9.60 miles Optage: Umeda North
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
9.60 miles Telehouse: Osaka Umeda
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
9.65 miles SoftBank: Osaka No. 3
SoftBank data center inside OPTAGE's Umeda Kita data center building in Kita Ward, Osaka, in service since 2012.
9.65 miles TISI: Osaka 1st DC
TISI data center space inside OPTAGE's Umeda Kita building in Kita Ward, Osaka, opened in 2012.
9.92 miles Goldman Sachs: Higashiosaka
Goldman Sachs acquired land to build a data centre in Daito, Higashiosaka.
10.11 miles MC Digital Realty: KIX14
KIX14 is a planned MC Digital Realty data center in Ikoma City, Nara Prefecture, east of Osaka. The design calls for a base-isolated building with four floors above ground. MC Digital Realty is the 50/50 joint venture of Mitsubishi Corporation and Digital Realty.
10.19 miles ADA: Osaka East 1
GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
10.55 miles Digital Edge: Osaka OSA1
10.56 miles Equinix Osaka OS3
10.58 miles Telehouse: Osaka 2
Built as the major Telehouse Data Center for the west of Japan, The Osaka 2 Data Center facility began service on 21st August, 2015.
10.63 miles Optage: Sonezaki
Named 'Optage Sonezaki Data Center,' the 14-story carrier-neutral facility will offer 24,100 square feet (2,250 square meters) of space and incorporate seismic isolation design for earthquake protection.
10.96 miles NTT OS2 (Telepark Dojima Building 2)
11.21 miles NTT: Osaka North 1(OSK12)
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
11.24 miles NTT Data Osaka Dojima (Building #4)
11.26 miles EdgeConneX: Kyotanabe 2
This facility is part of EdgeConneX Kyotanabe campus in Osaka.
11.28 miles NTT OS3 (Telepark Dojima Building 3)
11.36 miles EdgeConneX: Osaka Kyotanabe
EdgeConneX has broken ground on a 200MW AI-ready data center campus in Kyotanabe, Greater Osaka, Japan, spanning approximately 130,000 sqm (1.4 million sq ft). Construction began in March 2026, with the first 28MW phase expected online by early 2028, followed by phased expansion to full capacity.
11.51 miles AirTrunk: Osaka OSK1
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.
11.64 miles SoftBank: Nara Ikoma
SoftBank's Nara Ikoma Data Center sits on the former NEC Kansai Research Laboratories site in Ikoma City, Nara Prefecture, east of Osaka. Its first building opened in October 2025 and supports air-cooled and direct liquid-cooled racks for AI and GPU workloads. A second building is planned on the same site.
11.76 miles Equinix: OS6
OS6 is Equinix's new retail colocation tower in Kyutaromachi, Chuo Ward, in central Osaka. The 13-story building is rising on a former parking lot beside Chuo-odori. Phase 1 opens in tranches from late 2027 through late 2028.
11.76 miles AirTrunk: Osaka OSK2
AirTrunk’s newly announced OSK2 project is a massive hyperscale development located in East Osaka, designed specifically to meet the surging demand for cloud and artificial intelligence (AI) infrastructure in the Kansai region.
11.76 miles AirTrunk: OSK2 Expansion
11.76 miles Empyrion: Osaka JP2
12.05 miles NTT Osaka 5
12.23 miles NTT Osaka OS4
12.34 miles STACK Osaka KIX01
Located in Osaka’s eastern suburb of Keihanna, this data center campus will comprise three buildings with robust access to power and network to ensure strong reliability.
12.34 miles ESR Group: Keihanna OS4
ESR Group and STACK Infrastructure, major players in APAC's New Economy real estate and global digital infrastructure, are jointly building a new data center campus in Keihanna, Japan (Kansai region).
12.36 miles TISI: Osaka 3rd DC (Shinsaibashi gDC-EX)
TISI data center in the Keihanshin Nishi-Shinsaibashi Building, Osaka, opened in 2013 as Shinsaibashi gDC-EX.
12.38 miles Telehouse: Osaka Shinsaibashi
KDDI Telehouse operates a colocation data center in Shinsaibashi, Japan.
12.38 miles STACK: KIX01C
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
12.38 miles Optage: Shinsaibashi
The Shinsaibashi Data Center in central Osaka was launched in 2008. OPTAGE will establish a new connectivity area “Shinsaibashi POP (Point Of Presence)” within the existing Shinsaibashi Data Center in Osaka City By 2025.
12.38 miles TowerInterested in this information?Contact us
12.38 miles STACK: KIX01B
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
12.39 miles INAP Osaka
12.42 miles Optage: Shinmachi
12.44 miles Equinix Osaka OS1
Opened in 2013, the first phase, with room for 320 cabinets is a US$12m investment. Once fully opened the site will carry 800 cabinets.
12.51 miles Colt Osaka Keihanna
12.70 miles TISI: Osaka 2nd DC (Shinsaibashi gDC)
TISI data center in the Keihanshin Kitahorie Building, Nishi Ward, Osaka, opened in 2008 as Shinsaibashi gDC.
12.76 miles NTT Keihanna OSK11
12.89 miles Mapletree: Osaka
The multi-story facility is built on a 4,200 sqm site and offers 13,330 sqm of total space, including 12,720 sqm of lettable area. The property comes with a 70-year land lease that began October 1, 2020.
13.41 miles Kagoya: Keihanna Lab A
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
13.42 miles Kagoya: Keihanna Lab B
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
16.45 miles SC Zeus: Osaka 2
This facility is part of SC Zeus' Project Zeus OSA1 campus in Osaka.
16.47 miles SC Zeus: Osaka 1
SC Zeus, a leader in sustainable data center solutions, is developing Project ZEUS OSA 1 in Osaka, a campus that will comprise two buildings.
16.54 miles ESR Group: Cosmosquare OS1
OS1 is the first building on ESR's Cosmosquare campus in Nanko Kita, Osaka: a five-storey, base-isolated steel data center designed by NTT Facilities, built by Toda Construction and operated by CloudHQ as KIX1.
16.55 miles CloudHQ: Cosmosquare KIX1
CloudHQ operates ESR Group's Cosmosquare OS1 building in Nanko Kita, Osaka, as KIX1, the first building of its KIX campus.
16.56 miles ESR Group: Cosmosquare OS2
OS2 is the second building planned on ESR's Cosmosquare campus in Nanko Kita, Osaka, on the south half of the parcel it shares with OS1. CloudHQ markets it as KIX2.
16.56 miles CloudHQ: Cosmosquare KIX2
CloudHQ plans to operate ESR Group's Cosmosquare OS2 building in Nanko Kita, Osaka, as KIX2, the second building of its KIX campus.
16.59 miles ESR Group: OS3
This facility is part of ESR Group's Cosmosquare campus in Osaka.
16.59 miles ESR Group: Cosmosquare OS3
OS3 is the third building planned on ESR's Cosmosquare campus in Nanko Kita, Osaka. It redevelops the IBM Japan Osaka Nanko building on the west side of the campus after that building's lease ends. CloudHQ markets it as KIX3.
16.61 miles CloudHQ: KIX3
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
18.86 miles SoftBank: Sakai
SoftBank is converting part of Sharp's former LCD panel plant in Sakai, Osaka, into a large AI data center. SoftBank bought the site in 2025 and plans to expand its power capacity in phases.
18.96 miles KDDI: Sakai, Osaka
KDDI has launched an AI data center at the former Sharp Sakai factory site in Osaka Prefecture.
19.62 miles NTT: OSK12 Bldg-2

NTT Osaka 7 Data Center Photos See all

2019 Rendering of OS7
Source: Baxtel

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?