NTT Zurich 1

Latest Podcast Hofwisenstrasse 56
Operational
Fully operational facility
Operated by:

NTT Zurich 1

Year Built: 2011
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The site was opened in June 2011, is located in Rümlang near Zurich. The building, consisting of two parts, has about 7,000 sqm of high-availability data center space in the first building. The building has also obtained LEED Platinum Pre-Certification from the US Green Building Council.

Site History

The site was formerly known as "e-shelter Zurich"

Power:


  • Two independent feeds on the medium voltage level 16 kV
  • Two separate UPS systems (A- and B-supply)
  • Redundant emergency power system with diesel generators

Security:


  • Monitoring by e-shelter own 24/7 Security Command and Control Center with security personnel from e-shelter security on-site
  • Standardized security processes and the 7-level security system secure the tenant areas and technical operations
  • Access control via non-contact chip and PIN or optional biometrics signature
  • Secured perimeter zones with electronically monitored security fencing system, incorporating anti-climb and anti-tunneling protection

Connectivity:


  • Carrier-neutral
  • Carrier-mix from global Tier 1 supplier to local supplier
  • Direct, redundant connection to SWISSIX
  • Via several partners direct connection to international internet exchanges
  • Cross-Connects are realized via dedicated, redundant designed pipelines
  • Datacenter Connects between the data center Zurich and e-shelter locations, e.g. Campus Frankfurt 1 and Frankfurt 3; on request as well to commercial third-party data centers

Map and Nearby Locations

Hofwisenstrasse 56
NTT Sites
Nearby Facilities

NTT Zurich 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT Zurich 1

Distance Site
1.39 miles Digital Realty: ZUR3
1.39 miles Digital Realty: ZUR2
1.44 miles Digital Realty: ZUR1
1.45 miles Digital Realty: ZUR4
1.47 miles Green Datacenter Glattbrugg
4.20 miles Green Datacenter: Dielsdorf Bldg M
4.24 miles Green Datacenter: Dielsdorf Bldg N
4.27 miles Green Datacenter: Dielsdorf Bldg O
4.38 miles Swisscom Zürich
4.40 miles nLighten: Zurich
4.40 miles Equinix Zurich ZH2 ZH4
4.42 miles Equinix Zürich ZH1
4.77 miles Equinix Zurich ZH5
4.99 miles AtlasEdge: Zurich
5.06 miles Tower MaxInterested in this information?Contact us
5.27 miles Equinix: Zurich ZH3
5.55 miles Real Estate Data CenterInterested in this information?Contact us
5.75 miles Green Datacenter Zurich City (Schlieren)
8.10 miles Vantage: Zurich ZRH3
8.67 miles Vantage: Zurich II
8.98 miles STACK: ZUR03
9.47 miles NorthC: Winterthur (Zurich)
10.42 miles STACK ZUR01
10.81 miles Vantage: ZRH13
10.88 miles Vantage: ZRH12
10.92 miles Vantage: ZRH11
15.33 miles Green Datacenter: Zurich West 4
15.36 miles Green Datacenter: Lupfig ZRH1 Expansion
15.37 miles Green Datacenter: Zurich West 1
15.39 miles Green Datacenter: Zurich West 2
15.42 miles Green Datacenter: Zurich West 3
16.92 miles STACK: ZUR02 Beringen

NTT Zurich 1 Data Center Photos See all

Small field next to e shelter's facility in Rümlang
Source: Baxtel
View from Hofwisenstrasse road
Source: Baxtel

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Signs MoU With B.Grimm for 400MW Thailand Data Center Campus
NTT Global Data Centers and Amata B.Grimm Power signed a memorandum of understanding on Nov. 19 to study a 400MW campus in Chonburi, Thailand. B.Grimm Power put the investment at more than THB 113 ...

NTT Signs MoU With B.Grimm for 400MW Thailand Data Center Campus

November 24, 2026 NTT

NTT Global Data Centers and Amata B.Grimm Power signed a memorandum of understanding on Nov. 19 to study a 400MW campus in Chonburi, Thailand. B.Grimm Power put the investment at more than THB 113 billion, about $3.3 billion. The company said the project is expected to create more than 2,500...

Read more
Read Green Starts Heating Dielsdorf Homes With Data Center Waste Heat
Green Datacenter AG now sends waste heat from its Dielsdorf data centers into a district heating network that will eventually serve up to 11,500 households. The Swiss operator and utility Energie 3...

Green Starts Heating Dielsdorf Homes With Data Center Waste Heat

November 23, 2026 Green Datacenter AG

Green Datacenter AG now sends waste heat from its Dielsdorf data centers into a district heating network that will eventually serve up to 11,500 households. The Swiss operator and utility Energie 360° commissioned the network's energy center on Nov. 19, and the first apartment buildings in...

Read more
Read NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy
[NTT DATA](https://baxtel.com/data-centers/ntt-data) will use Bloom Energy fuel cells as primary power at data centers worldwide under a [900MW agreement](https://www.nttdata.com/en-za/news/2026/nt...

NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy

November 06, 2026 NTT

NTT DATA will use Bloom Energy fuel cells as primary power at data centers worldwide under a 900MW agreement, with first shipments in 2027. The companies announced the agreement on Nov. 5. NTT Global Data Centers, the data center division of NTT DATA, will run the fuel cells as the main source of...

Read more
Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.