NTT MSC Sdn. Bhd

Established in 1997, NTT MSC Sdn Bhd, short for "sendirian berhad" (Malay equivalent to incorporated), was named after the renowned Multimedia Super Corridor (MSC), currently known as MSC Malaysia, a national information and communications technology (ICT) initiative conceptualised in 1996 as one of the main programs to accelerate Vision 2020--the strategic intent of the Malaysian government to transform Malaysia into a developed country by the year 2020.

NTT MSC's head office is strategically based in Cyberjaya, while the sales office is located in the heart of Kuala Lumpur's Golden Triangle

  • Operating 7 data centers in 1 market.
  • Their largest faciilty is NTT Cyberjaya CBJ5.
  • The company has 1 site under construction.

7 Facilities Owned

1 Markets Served

░░░░░ Login to view MW Total Power

NTT MSC Sdn. Bhd Data Center Map

NTT MSC Sdn. Bhd Locations

NTT Cyberjaya 3

In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.

NTT Cyberjaya 4

In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.

NTT MSC Sdn. Bhd Data Center Photos


NTT's Sora Data Centre
Posted in NTT Cyberjaya 4
Source: Shaw Architect

Ground Floor Plan for CBJ3 and CBJ4
Posted in NTT Cyberjaya 4

CB5 and CB6 Expansion Plans
Posted in NTT Cyberjaya 4

Sectional Perspective
Posted in NTT Cyberjaya 4
Source: Shaw Architect

Cyberjaya 4 Lounge Area
Posted in NTT Cyberjaya 4

Seamless Cloud for the World
Posted in NTT Cyberjaya 4

CBJ4 Office Area
Posted in NTT Cyberjaya 4

Reception Counter
Posted in NTT Cyberjaya 4
Source: H Lin Ho

Drop Off Area
Posted in NTT Cyberjaya 4
Source: H Lin Ho

NOC Room
Posted in NTT Cyberjaya 4
Source: H Lin Ho

Lobby Area
Posted in NTT Cyberjaya 4
Source: H Lin Ho

Large Bonsai Tree
Posted in NTT Cyberjaya 4
Source: H Lin Ho

Contained Colocation Room
Posted in NTT Cyberjaya 4

Nexcenter Hallway at CBJ4
Posted in NTT Cyberjaya 4

NTT's MSC Global Solution Center (Office)
Posted in NTT Cyberjaya 4

View of CBJ3 and CBJ4
Posted in NTT Cyberjaya 4
Source: Leang Wai Loon

NTT CBJ 3 Data Center
Posted in NTT Cyberjaya 3

NTT CBJ3 Technology Center
Posted in NTT Cyberjaya 3
Source: Nakano Construction

2017 Cyberjaya4 Expansion
Posted in NTT Cyberjaya 4

NTT MSC TECHNOLOGY CENTER (CBJ3)
Posted in NTT Cyberjaya 3
Source: Green Building Index

MSC Global Solution Office
Posted in NTT Cyberjaya 4

NTT Malaysia Cyberjaya 4 Data Center
Posted in NTT Cyberjaya 4
Source: NTT
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Loading Bay
Posted in NTT Cyberjaya 4

The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unauthorized access.

Source: NTT
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable
Posted in NTT Cyberjaya 4

Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.

Source: NTT
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets
Posted in NTT Cyberjaya 4

The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.

NTT provides power capacity and associate cooling of at least 3kVA per rack.

Source: NTT
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room
Posted in NTT Cyberjaya 4

Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

Source: NTT

Designated staging area is available for customer use.
Staging Area
Posted in NTT Cyberjaya 4

Designated staging area is available for customer use.

Source: NTT
Meeting room is available next to the staging area.
Customer Meeting Room
Posted in NTT Cyberjaya 4

Meeting room is available next to the staging area.

Source: NTT

CBJ5 when completed in 2021
Posted in NTT Cyberjaya CBJ5

Files

No Files