NTT Slough 3

Latest Podcast 665 Ajax Avenue
Operational
Fully operational facility
Operated by:

NTT Slough 3

PUE: 1.3
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.

Map and Nearby Locations

665 Ajax Avenue
NTT Sites
Nearby Facilities

Sites within 15 miles of NTT Slough 3

Distance Site About
0.05 miles GTR: Slough 3
Building 3 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The eastern block.
0.07 miles NTT Slough 2
0.09 miles Digital Realty: LHR26
LHR26 is building A of Digital Realty's Slough campus at 630 Ajax Avenue, Slough Trading Estate. Digital Realty acquired the former Cyxtera LHR1 site in 2024.
0.11 miles GTR: Slough 2
Building 2 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The middle block.
0.11 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
0.12 miles Digital Realty: LHR27
LHR27 is building B of Digital Realty's Slough campus at 631 Ajax Avenue, Slough Trading Estate, 15 minutes from London Heathrow.
0.16 miles GTR: Slough 1
Building 1 of GTR's three-building GB One campus on Ajax Avenue, Slough Trading Estate. The western block, and the first one GTR fitted out.
0.18 miles VIRTUS: London 9
0.19 miles Segro: 200 Bath Road
Planned three-storey powered-shell data center by Segro at 200 Bath Road, Slough, on the site of the former Unatrac, Ipsen and BlackBerry offices. Full planning permission granted in 2024.
0.24 miles Segro: 210 Bath Road
Planned data center by Segro at 210 Bath Road, Slough, on the site of the former UCB and Black & Decker offices. Outline planning permission granted in 2024; detailed design to follow.
0.28 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
0.28 miles GoDaddy Slough (HEG)
0.29 miles Iron Mountain: LON-3
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
0.33 miles Logicalis Slough
0.33 miles Iron Mountain: LON-2
LON-2 is a 269,000 square foot data center at 110 Buckingham Avenue in the Slough Trading Estate.
0.37 miles VIRTUS: London 10
0.37 miles VIRTUS: London 12
LONDON12 is VIRTUS's newest operating building on its Slough campus, at 485 Berkshire Avenue on the Slough Trading Estate. Fit-out finished in early 2026.
0.40 miles VIRTUS: London 19
VIRTUS Data Centres plans to add a new high-density, carrier-neutral facility at the Slough Trading Estate. SEGRO will develop the powered-shell building, while VIRTUS will complete the specialist data-centre fit-out and operate the facility.
0.40 miles Lumen Slough
0.42 miles VIRTUS: London 3
LONDON3 is a SEGRO-built extension next to VIRTUS's LONDON4 on Liverpool Road, Slough, linked directly to it. VIRTUS signed a 20-year lease in 2017 and completed the fit-out in December 2018.
0.46 miles VIRTUS: London 4
LONDON4 is the former Infinity SDC Slough data centre on Liverpool Road, which VIRTUS bought in 2015. It anchors the VIRTUS Slough campus and hosts the Jisc Shared Data Centre.
0.46 miles VIRTUS: London 11
0.46 miles CyrusOne LON5
0.48 miles Equinix LD13x
0.51 miles Equinix LD10
0.53 miles CyrusOne London I
CyrusOne London I (LON1) is the former Zenium London One at 12 Liverpool Road on the Slough Trading Estate: one two-storey building with about 4,300 sq m of technical space. CyrusOne acquired it with Zenium in 2018.
0.58 miles China Mobile Slough
0.67 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
0.77 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
0.92 miles Equinix LD14
0.92 miles Equinix LD12
0.95 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
0.96 miles Equinix LD6
0.99 miles Equinix LD7
1.02 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
1.03 miles Equinix LD11x
1.08 miles Virgin Media O2 Slough
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
1.56 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
1.59 miles Yondr: Slough 1
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
1.63 miles Yondr: Slough 2
This facility is part of Yondr's London Slough Campus.
1.70 miles Yondr: Slough 3
Yondr’s Slough 3 data center is the third facility on the company’s London campus, expanding its hyperscale presence on a former industrial site in one of the UK’s main data center markets.
3.21 miles ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.13 miles Pinewood South: Buckinghamshire Campus
The Pinewood South Data Centre is a planned £1 billion ($1.3bn) hyperscale-ready campus located on a 19.5-hectare site directly south of Pinewood Studios in Iver Heath, Buckinghamshire.
4.13 miles Pulsant: Maidenhead SE-2
4.23 miles Thorney: Iver DC-F
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
4.24 miles Thorney: Iver DC-E
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
4.25 miles Thorney: Iver DC-D
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
4.42 miles Thorney: Iver DC-C
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
4.44 miles Segro: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
4.45 miles Thorney: Iver DC-B
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
4.46 miles Thorney Lane LLP: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
4.56 miles Core TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.70 miles CyrusOne: LON6 Bldg1
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
4.72 miles CyrusOne: LON6 Bldg2
This facility will be part of CyrusOne's LON6 Campus in London.
4.76 miles CyrusOne: LON6 Bldg3
This facility will be part of CyrusOne's LON6 Campus in London.
4.77 miles iomart DC5 Maidenhead
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
4.79 miles CyrusOne: LON6 Bldg4
This facility will be part of CyrusOne's LON6 Campus in London.
4.81 miles CyrusOne: LON6 Bldg5
This facility will be part of CyrusOne's LON6 Campus in London.
4.84 miles CyrusOne: LON6 Bldg6
This facility will be part of CyrusOne's LON6 Campus in London.
4.84 miles Thorney: Iver DC-A
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
4.98 miles SDC: M40 Campus
The SDC M40 Campus is a planned £2 billion hyperscale data center development in Buckinghamshire, UK, backed by a partnership between US-based SDC Capital Partners and environmental utilities giant Veolia.
4.99 miles Tritax: Manor Farm (Phase 2)
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
5.00 miles CorScale: Court Lane 2
This is the second building at CorScale's Court Lane Campus in Iver, Buckinghamshire.
5.04 miles CorScale: Court Lane 1
In December 2024, Corscale Data Centers secured planning approval for its first UK project, the Corscale Court Lane Data Center in Iver, Buckinghamshire.
5.05 miles Tritax: Manor Farm (Phase 1)
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
5.26 miles Sequence: Iver, Buckinghamshire
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
5.35 miles West London Tech Bldg2
This facility is part of Greystoke's West London Tech Park.
5.38 miles West London Tech Bldg1
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
5.65 miles Link Park Heathrow Data Center
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
6.26 miles Mulberry: Denham, Uxbridge
Developer Mulberry Commercial Developments II is planning to build a hyperscale data center on a greenbelt site near the village of Denham in Buckinghamshire, UK.
6.85 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
6.86 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
6.98 miles VIRTUS: London 5
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
6.99 miles VIRTUS: London 6
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
7.10 miles DRT London (West Drayton)
7.17 miles QuickHostUK: High Wycombe
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
7.34 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
7.44 miles VIRTUS: London 14
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
8.12 miles Rackspace: LON8
8.47 miles ServerFarm London
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
8.49 miles DataBank: London Heathrow
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
8.73 miles North ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.76 miles Marvel: Hayes
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
8.97 miles Ark: Union Park
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
9.16 miles GTR: Southall 4
Data Centre 4 of GTR's GB Two campus in Southall, the south-west half of the large southern building it shares with Data Centre 3, near Bulls Bridge, in the second build phase.
9.18 miles GTR: Southall 3
Data Centre 3 of GTR's GB Two campus in Southall, the north-east half of the large southern building it shares with Data Centre 4, in the second build phase.
9.19 miles GTR: Southall 2
Data Centre 2 of GTR's GB Two campus in Southall, a four-storey building matching Data Centre 1 in the middle of the plot along the Grand Union Canal, in the first build phase.
9.21 miles GTR: Southall 1
Data Centre 1 of GTR's GB Two campus in Southall, a four-storey building at the north end of the data centre plot next to the campus substations, in the first build phase.
9.22 miles VIRTUS Hayes London2
9.27 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
9.45 miles Brixton Heathrow Estate DC
Heathrow Estate Data Centre is a planned facility at Haslemere Heathrow Estate in Cranford, Hounslow.
9.48 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
9.49 miles Colt: London 6
This planned facility is part of Colt's London Hayes Campus in West London.
9.51 miles Level3 Bracknell
9.52 miles Colt: London 5
This facility is a part of Colt's London Hayes Campus in West London.
9.52 miles Ark: Longcross 1
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
9.53 miles Colt: London 8
This planned facility is part of Colt's London Hayes Campus in West London.
9.53 miles Colt: London 7
This planned facility is part of Colt's London Hayes Campus in West London.
9.56 miles Colt: London 4
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
9.67 miles Keppel: London Bracknell
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
9.68 miles Vodafone: London Bracknell
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
9.74 miles Verizon London UK4
9.97 miles CapitaLand: Cressex Business Park
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
9.98 miles DRT London (Cresses Business Park)
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
9.99 miles Stellanor: Hounslow
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
10.02 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
10.32 miles Wycombe Air Park
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
10.66 miles CyrusOne: Southall LON7
CyrusOne has secured planning permission from Ealing Council to transform the historic former "Honey Monster Factory" site in Southall, West London, into a state-of-the-art data center campus.
11.01 miles Kao Data: Northolt
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
11.01 miles Barclays Data Centre
11.88 miles Lunar 5
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
11.94 miles CapitaLand: Chess Building
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
12.81 miles Centersquare: Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
13.12 miles Stellanor: Byfleet
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
13.16 miles Redwire: London
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
13.39 miles NaviSite Woking
13.39 miles Stellanor: Woking TC3
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
13.41 miles CyrusOne London Woking
13.41 miles Digital Realty Woking
13.73 miles Echelon LCY20
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
14.07 miles Thames Valley Park DC
A data center has been proposed to redevelop office space previously used by Microsoft at Thames Valley Park in Reading, UK.
14.25 miles Gravity Edge: London LDN2
Gravity Edge LDN2 is a 2 MW HPC pod block on the LDN1 campus at Stanhope Road, Camberley, with a roadmap to 5 MW.
14.25 miles Gravity Edge: London LDN1
Gravity Edge LDN1 is a 145,585 sq ft, 5.4-acre freehold data center campus in Yorktown Business Park, Camberley, west of London, with 36 MVA of secured SSEN grid supply, 8 MW operating and a brownfield expansion to 22 MW underway.
14.54 miles Virtus: London 18
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
14.55 miles Virtus: London 17
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
14.55 miles Ark: Alliance Park
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
14.60 miles Virtus: London 15
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings.
14.61 miles Pulsant: Reading SE-4
14.62 miles Virtus: London 16
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
14.77 miles Equinix London LD3
14.81 miles Vision247: London
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
14.97 miles Segro Pure Premier Park
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
15.04 miles Ark: Elstree Campus
Ark Data Centres is developing a massive data center campus in the Elstree/Hertsmere area, close to the A41 and M25.
15.05 miles Ark: Elstree Expansion
15.29 miles Kao Data: Royal Park
Kao Data acquired a 4.7-acre brownfield site in Park Royal for a new data center expected to enter service in 2029.
15.32 miles Options West London
15.36 miles Vantage London II
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
15.44 miles Point PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.44 miles Equinix London LD9 Powergate
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
15.47 miles Colt Powergate
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
15.53 miles Vantage: LHR11
LHR11 is the first of two data centers on Vantage's London I campus in Park Royal.
15.54 miles Vantage: LHR12
LHR12 is the second data center on Vantage's London I campus in Park Royal.
16.13 miles Abbots Langley Data Centre
16.56 miles Asanti: Reading
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
16.61 miles Pure DC: Brent Cross
Pure Data Centres' Brent Cross project has entered its second phase, with the installation of superstructure steelwork now underway for a new building.
16.75 miles Stellanor: Reading
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
16.79 miles Pulsant: Reading SE-3
16.81 miles Amito Reading
16.92 miles iomart: DC12 North London
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX1 site is now integrated into iomart's network as DC12 North London.
17.16 miles Asanti: Farnborough
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
17.25 miles Intercity: Elstree
The Intercity Technology Elstree data center is located on Theobald Street in Borehamwood (Greater London/Hertfordshire border).
17.35 miles Digital Realty: London (Chessington) LHR13
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
17.67 miles Kyndryl: Farnborough
18.12 miles Datum FRN1
18.17 miles Ark: Cody Park
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
18.21 miles Hyperscale Data CenterInterested in this information?Contact us
18.42 miles South PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.43 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
18.44 miles Point AlphaInterested in this information?Contact us
18.53 miles Northtree: Hemel Hempstead
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
18.58 miles NTT Hempstead 3
18.68 miles NTT Hempstead 2
18.71 miles NTT Hempstead 1
18.72 miles Visa United Kingdom
19.49 miles Smallworld: Guildford

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read NTT to Develop 200MW Data Center Campus Near Tokyo
NTT to Develop 200MW Data Center Campus Near Tokyo

NTT to Develop 200MW Data Center Campus Near Tokyo

April 21, 2026 NTT

Japanese technology giant NTT has announced plans for a new data center outside Tokyo. NTT Data this week said that work has begun on a new data center development in the Inzai–Shiroi area of Chiba Prefecture, outside Tokyo.The facility is being developed through NTT Global Data Centers (NTT...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?