Site: NTT Chicago CH1

Company: NTT
Metro: Chicago: Suburban
Metro: Chicago
State: Illinois
Country: United States
Region: North America
Region: Americas
Region: World
Address:
Total Building SqFt: 245,000
Gross SqFt: 126,000
Total Power: ??? NN
Interested in this information? Contact us
Megawatts

RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago. RagingWire began construction of CH1 in 2018.

The two-story Chicago CH1 Data Center will be built in three phases. The first phase, comprising 245,000 square feet space and 16 megawatts of critical power, will have eight 2MW vaults with flexible configuration and dedicated infrastructure options.

Map and Nearby Locations:

255 Pierce Rd, Itasca, IL 60143

SITES within 15 miles of NTT Chicago CH1

Show SqM



Distance Site name SqFt MW
1.90 miles Skybox Chicago I 120,000 30.00
2.43 miles 1450 E Devon Ave (CH3) DRT 157,500 25.60
2.49 miles Element Critical CH2 30,000 2.00
2.52 miles Element Critical CH1 115,500 9.00
2.55 miles ColoCrossing CH1 10,000
2.55 miles ServerCentral CH1 18,000 2.60
2.55 miles Digital Elk Grove Village Campus
2.56 miles 2200 Busse Rd (CH1) DRT 230,000 36.40
2.56 miles Rackspace Elk Grove ORD1 96,232 15.60
2.66 miles STACK Chicago CHI02 24.00

June 2020

NTT CH1 Data Sheet (PDF)