Edge Centres' Kuala Lumpur, Malaysia Edge Facility To Come online in July
June 30, 2022
Kuala Lumpur
In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.
The NTT MSC Global Solution Center is a five story building which offers 64,00 square feet of office space for disaster recovery and business continuity offices.
| Distance | Site | About |
|---|---|---|
| 0.03 miles | NTT Cyberjaya 3 |
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
|
| 0.05 miles | NTT Cyberjaya CBJ5 |
Cyberjaya 5 Data Center is located in the Multimedia Super Corridor, just a 30-minute drive from central Kuala Lumpur, in Malaysia's premier IT hub.
|
| 0.06 miles | NTT Cyberjaya 6 |
|
| 0.07 miles | NTT Cyberjaya 2 |
NTT's Cyberjaya 2 (CBJ2) appears to have closed.
|
| 0.10 miles | NTT Cyberjaya 1 | |
| 0.12 miles | NTT Malaysia Cyberjaya (MSC) Campus | |
| 0.39 miles | Cyberjaya Klang Valley (KVDC) |
Telekom Malaysia is expanding two of its data centers. Cyberjaya Klang Valley Core Data Centre (KVDC) was opened in 2019.
|
| 0.41 miles | GDC SDN: Cyberjaya |
Global Data Centre Sdn. Bhd. (GDC), a subsidiary of Global Telecommunications Sdn. Bhd., is planning to build an AI-Driven Data Centre in Cyberjaya, Malaysia.
|
| 0.41 miles | Edgnex: Cyberjaya |
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
|
| 0.44 miles | Telekom Malaysia: KVDC 2 |
Telekom Malaysia has expanded its Cyberjaya Klang Valley Data Center (KVDC).
|
| 0.66 miles | CSF Computer Exchange 2 (CX2) |
The 300,000+ square foot CX2 data center in Kuala Lumpur, Malaysia is the flagship facility for the CSF Group, which went public in 2010 with an IPO in London.
|
| 0.70 miles | Infinaxis: Cyberjaya 2 |
Infinaxis Cyberjaya 2 will be the company's second data center building of its Cyberjaya Campus.
|
| 0.72 miles | Bridge Data Centres Cyberjaya MY01 |
|
| 0.74 miles | AIMS: CJ1 Block 3 |
Malaysia’s AIM completed construction of Cyberjaya Block 3 in July 2025, ahead of schedule.
|
| 0.74 miles | Infinaxis: Cyberjaya 1 |
Infinaxis Cyberjaya 1 is the company's first data center in Malaysia, located in Cyberjaya.
|
| 0.77 miles | AIMS: CJ1 Block 2 |
In 2024, Malaysia’s AIMS completed a phase 2 expansion of its Cyberjaya campus and announced plans for a third phase expansion.
|
| 0.77 miles | AIMS: Cyberjaya 2 |
DigitalBridge-owned AIMS has finalized a RM4 billion ($1.01 billion) investment to develop a new AI-ready data center in Cyberjaya, Malaysia.
|
| 0.79 miles | AIMS Cyberjaya CJ1 |
AIMS Data Centre began constructing its Cyberjaya facility in the third quarter of 2020.
|
| 0.97 miles | CSF Computer Exchange 1 (CX1) |
The CX1 data center offers a network-dense environment and includes on-site deployment of the Malaysia Internet Exchange (MyIX).
|
| 0.99 miles | TelcoHub X1 Cyberjaya | |
| 1.01 miles | CSF Computer Exchange 5 (CX5) |
Developed in three phases over three years, CX5 was completed in 2015.
|
| 1.08 miles | Bridge Data Centres Cyberjaya MY02 |
|
| 1.19 miles | Bridge: MY02 Bldg2 |
Bridge Data Centres (BDC) is expanding its footprint in Cyberjaya, Malaysia with the MY02 hyperscale data center project, adding substantial IT capacity across three phases.
|
| 1.24 miles | Bridge: MY02 Bldg3 | |
| 1.29 miles | Bridge: MY02 Bldg4 | |
| 1.43 miles | Keppel Cyberjaya Basis Bay DC |
|
| 1.49 miles | Basis Bay: Cyberjaya DC1 |
Operational since 2009, Basis Bay DC.1 is a purpose-built, carrier-neutral facility designed to Tier III/Rated-3 standards (with Tier IV-ready mechanical and electrical redundancies).
|
| 1.52 miles | STT Kuala Lumpur 1 |
STT Kuala Lumpur 1, is specifically designed for hyperscalers and is currently in the final stages of completion to meet the growing demand for global cloud and AI infrastructure.
|
| 1.53 miles | Pi Data Centre: Cyberjaya |
The development will span 7.3 acres, with Phase 1 construction scheduled to begin in the third quarter of 2024. The project is expected to be completed by the fourth quarter of 2025.
|
| 1.53 miles | Basis Bay: Cyberjaya DC2 |
Basis Bay Cyberjaya DC.2 is a pioneering "Eco-Green Premium Data Centre" designed to meet the rigorous demands of the banking, financial services, and government sectors.
|
| 1.58 miles | Vantage: KUL13 |
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
| 1.59 miles | Vantage: KUL14 |
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
| 1.60 miles | Open DC CJ1 | |
| 1.60 miles | MyTelehaus Cyberjaya CJ1 Centre | |
| 1.61 miles | Hyperscale Data Center Request Dataset |
AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.
|
| 1.62 miles | Vantage Cyberjaya KUL11 |
Vantage's multi-story, four-data-center KUL1 campus is an 8-minute drive from the Central Business District via the Persiaran APEC and a 30-minute drive from Kuala Lumpur International Airport.
|
| 1.63 miles | Equinix Kuala Lumpur KL1 |
Equinix KL1 is located within Vantage KUL1 Data Center Campus.
|
| 1.63 miles | Equinix: KL2 |
The site is strategically located less than one kilometer from Equinix's KL1 data center, which began operations in May 2024.
|
| 1.65 miles | Vantage: KUL12 |
In 2022, Vantage launched the second data center (KUL12) on its Cyberjaya CJ1 campus in Kuala Lumpur, Malaysia.
|
| 1.66 miles | Vantage Cyberjaya (KUL2) |
The KUL2 campus, spanning 35 acres, is distributed across 10 structures covering 2.76 million sq ft (256,000 sqm).
|
| 1.98 miles | Hyperscale Data Center Request Dataset | |
| 2.07 miles | EdgeConneX: Cyberjaya |
The EdgeConneX data center campus in Cyberjaya (KUL2) will encompass nine buildings across 30 acres, offering the scalable capacity and power to accommodate a diverse range of customer needs in the future.
|
| 2.08 miles | Hyperscale Data Center Request Dataset | |
| 6.72 miles | Bridge DC: Southville City 2 |
Bridge Data Centres and Malaysian developer Mah Sing Group Berhad are expanding their data center joint venture outside Kuala Lumpur.
|
| 6.87 miles | Bridge DC: Southville City 1 |
The initial phase will focus on developing a data center site on 17.55 acres.
|
| 7.89 miles | Bridge DC: Banting Campus |
Bridge Data Centres (BDC), backed by Bain Capital, has acquired 136.1 acres in Banting’s IOI Industrial Park for RM740.68 million (~$158M).
|
| 8.43 miles | EdgeConneX: Bukit Jalil |
EdgeConnex is building a 60,000 sqm data center in Bukit Jalil, Malaysia. The site will feature a 132 kV substation.
|
| 8.58 miles | Bridge: MY03 DC2 |
Phase One of the expansion was planned to be ready for service by Q3 2025.
|
| 8.59 miles | Bridge Data Centres MY03 |
Bridge DC announced plans for the first building at the MY03 Campus in 2021.
|
| 8.63 miles | Bridge: MY03 DC3 |
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
|
| 8.66 miles | Bridge: MY03 DC4 |
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
|
| 9.28 miles | Exsim: Bukit Jalil |
The EXSIM Hyperscale Data Center Project in Bukit Jalil, Malaysia, complies with Uptime Institute's Tier III/Tier IV standards.
|
| 9.88 miles | ModernOne Kajang | |
| 11.73 miles | NEXTDC KL1 Petaling Jaya |
Once completed, KL1 will be the first Uptime Institute (UI) Tier IV certified data centre facility in Peninsular Malaysia.
|
| 12.05 miles | EC31 Kuala Lumpur | |
| 12.48 miles | Basis Bay: Glenmarie DC1 |
Basis Bay's Glenmarie DC.1 (also referred to as Subang Hi-Tech DC.1) is one of the company's established, purpose-built facilities located in Shah Alam, Malaysia.
|
| 12.56 miles | Basis Bay: Glenmarie DC2 | |
| 12.93 miles | MyTelehaus Kuala Lumpur P33 Centre | |
| 13.07 miles | TM KELANA JAYA DATA CENTRE (KJDC) |
|
| 13.14 miles | Strateq: Petaling Jaya |
|
| 14.54 miles | Hexatoff: Enstek City |
The Hexatoff Group AI Data Center in Enstek City is a flagship digital infrastructure project designed to position Malaysia as a regional leader in high-performance computing.
|
| 14.72 miles | Exitra: Kuala Lumpur | |
| 14.73 miles | TM Brickfields Data Centre (BFDC) |
|
| 15.29 miles | i-Berhad: i-City Bldg-1 |
Located in the heart of Shah Alam, i-Berhad’s Building 1 (also known as Block M) serves as the foundation for the i-City Data Centre Park.
|
| 15.30 miles | Strateq: Shah Alam I-City |
|
| 15.38 miles | i-Berhad: i-City Bldg-3 |
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
|
| 15.40 miles | i-Berhad: i-City Bldg-2 |
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
|
| 15.47 miles | Regal Orion: Shinsei 1 |
The facility is designed as a Tier IV green mega data center with capacity for 4,064 racks.
|
| 15.73 miles | AIMS: KL2 |
AIMS Group, owned by DigitalBridge, expanded its Malaysian footprint in 2024 with the launch of Bangunan AIMS (also known as KL2) in Kuala Lumpur.
|
| 15.74 miles | Crypto Mining Data Center Request Dataset |
This facility is part of Bitdeer's Kuala Lumpur campus in Malaysia.
|
| 15.74 miles | Crypto Mining Data Center Request Dataset |
This facility is part of Bitdeer's Kuala Lumpur campus in Malaysia.
|
| 15.74 miles | Crypto Mining Data Center Request Dataset |
|
| 15.75 miles | AIMS Kuala Lumpur Menara |
|
| 16.39 miles | EdgeConneX: CBD Kuala Lumpur |
EdgeConnex is building a 19,200 sqm data center with in the Central Business District in Malaysia.
|
| 16.49 miles | Safehouse: Wisma Mont’ Kiara |
Launched in 2011, the 5,000 sq ft facility utilizes IBM's Scalable Modular Data Centre Solutions (SMDC) and incorporates technology from Schneider Electric and Juniper Networks.
|
| 17.86 miles | YTL: Sentul 1 |
YTL’s Sentul Data Center 1 is located in the heart of Kuala Lumpur.
|
| 19.06 miles | TM Morib CLS |
Located in Morib, Selangor, Telekom Malaysia’s new 7,000 sq ft open cable landing station (CLS) serves as a strategic gateway along the Straits of Malacca.
|
Established in 1997, NTT MSC Sdn Bhd, short for "sendirian berhad" (Malay equivalent to incorporated), was named after the renowned Multimedia Super Corridor (MSC), currently known as MSC Malaysia, a national information and communications technology (ICT) initiative conceptualised in 1996 as one of the main programs to accelerate Vision 2020--the strategic intent of the Malaysian government to transform Malaysia into a developed country by the year 2020.
NTT MSC's head office is strategically based in Cyberjaya, while the sales office is located in the heart of Kuala Lumpur's Golden Triangle
June 30, 2022
Kuala Lumpur
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas