Site: NTT Cyberjaya 4 is a part of NTT Malaysia Cyberjaya (MSC) Campus

Company: NTT MSC Sdn. Bhd
Country: Kuala Lumpur
Country: Malaysia
Region: Southeast Asia
Region: Asia-Pacific (APAC)
Region: World
Address:
Total Office SqFt: 64,000
Gross SqFt: 45,500
Total Power: ??? NN
Interested in this information? Contact us
Megawatts

In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.

The NTT MSC Global Solution Center is a five story building which offers 64,00 square feet of office space for disaster recovery and business continuity offices.

Map and Nearby Locations:

itelligence Outsourcing MSC Sdn Bhd (H.Q) c/o NTT MSC No. 43000, Persiaran Apec 3rd Floor, NTT MSC Momiji (West) Building Cyberjaya Selangor, Cyberjaya, 63000 Cyberjaya, Selangor, Malaysia

SITES within 15 miles of NTT Cyberjaya 4

Show SqM



Distance Site name SqFt MW
0.03 miles NTT Cyberjaya 3 30,000 3.60
0.05 miles NTT Cyberjaya CBJ5 107,284 13.60
0.06 miles NTT Cyberjaya 6
0.07 miles NTT Cyberjaya 2
0.10 miles NTT Cyberjaya 1 15,000 0.32
0.12 miles NTT Malaysia Cyberjaya (MSC) Campus
0.66 miles CSF Computer Exchange 2 (CX2)
0.72 miles Bridge Data Centres Cyberjaya MY01 157,500 25.60
0.95 miles TelcoHub X1 Cyberjaya
0.99 miles CSF Computer Exchange 1 (CX1)
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

Designated staging area is available for customer use.
Meeting room is available next to the staging area.

NTT's Sora Data Centre
Source: Shaw Architect
Ground Floor Plan for CBJ3 and CBJ4
CB5 and CB6 Expansion Plans
Sectional Perspective
Source: Shaw Architect
Cyberjaya 4 Lounge Area
Seamless Cloud for the World
CBJ4 Office Area
Reception Counter
Source: H Lin Ho
Lobby Area
Drop Off Area
Source: H Lin Ho
NOC Room
Source: H Lin Ho
Lobby Area
Source: H Lin Ho
Unknown Area
Large Bonsai Tree
Source: H Lin Ho
Contained Colocation Room
CyberJaya 4
Nexcenter Hallway at CBJ4
NTT's MSC Global Solution Center (Office)
View of CBJ3 and CBJ4
Source: Leang Wai Loon
2017 Cyberjaya4 Expansion
MSC Global Solution Office
NTT Malaysia Cyberjaya 4 Data Center
Source: NTT
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Loading Bay

The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unauthorized access.

Source: NTT
Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable

Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.

Source: NTT
The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets

The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.

NTT provides power capacity and associate cooling of at least 3kVA per rack.

Source: NTT
Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room

Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.

Source: NTT

Designated staging area is available for customer use.
Staging Area

Designated staging area is available for customer use.

Source: NTT
Meeting room is available next to the staging area.
Customer Meeting Room

Meeting room is available next to the staging area.

Source: NTT