NTT Cyberjaya 4

Latest Podcast
itelligence Outsourcing MSC Sdn Bhd (H.Q) c/o NTT MSC No. 43000
Operational
Fully operational facility

NTT Cyberjaya 4

Year Built: 2014
Floors: 4
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.

The NTT MSC Global Solution Center is a five story building which offers 64,00 square feet of office space for disaster recovery and business continuity offices.

Map and Nearby Locations:

itelligence Outsourcing MSC Sdn Bhd (H.Q) c/o NTT MSC No. 43000
NTT MSC Sdn. Bhd Sites
Nearby Facilities

Sites within 15 miles of NTT Cyberjaya 4

Distance Site About
0.03 miles NTT Cyberjaya 3
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
0.05 miles NTT Cyberjaya CBJ5
Cyberjaya 5 Data Center is located in the Multimedia Super Corridor, just a 30-minute drive from central Kuala Lumpur, in Malaysia's premier IT hub.
0.06 miles NTT Cyberjaya 6
0.07 miles NTT Cyberjaya 2
NTT's Cyberjaya 2 (CBJ2) appears to have closed.
0.10 miles NTT Cyberjaya 1
0.12 miles NTT Malaysia Cyberjaya (MSC) Campus
0.39 miles Cyberjaya Klang Valley (KVDC)
Telekom Malaysia is expanding two of its data centers. Cyberjaya Klang Valley Core Data Centre (KVDC) was opened in 2019.
0.41 miles GDC SDN: Cyberjaya
Global Data Centre Sdn. Bhd. (GDC), a subsidiary of Global Telecommunications Sdn. Bhd., is planning to build an AI-Driven Data Centre in Cyberjaya, Malaysia.
0.41 miles Edgnex: Cyberjaya
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
0.44 miles Telekom Malaysia: KVDC 2
Telekom Malaysia has expanded its Cyberjaya Klang Valley Data Center (KVDC).
0.66 miles CSF Computer Exchange 2 (CX2)
The 300,000+ square foot CX2 data center in Kuala Lumpur, Malaysia is the flagship facility for the CSF Group, which went public in 2010 with an IPO in London.
0.70 miles Infinaxis: Cyberjaya 2
Infinaxis Cyberjaya 2 will be the company's second data center building of its Cyberjaya Campus.
0.72 miles Bridge Data Centres Cyberjaya MY01
0.74 miles AIMS: CJ1 Block 3
Malaysia’s AIM completed construction of Cyberjaya Block 3 in July 2025, ahead of schedule.
0.74 miles Infinaxis: Cyberjaya 1
Infinaxis Cyberjaya 1 is the company's first data center in Malaysia, located in Cyberjaya.
0.77 miles AIMS: CJ1 Block 2
In 2024, Malaysia’s AIMS completed a phase 2 expansion of its Cyberjaya campus and announced plans for a third phase expansion.
0.77 miles AIMS: Cyberjaya 2
DigitalBridge-owned AIMS has finalized a RM4 billion ($1.01 billion) investment to develop a new AI-ready data center in Cyberjaya, Malaysia.
0.79 miles AIMS Cyberjaya CJ1
AIMS Data Centre began constructing its Cyberjaya facility in the third quarter of 2020.
0.97 miles CSF Computer Exchange 1 (CX1)
The CX1 data center offers a network-dense environment and includes on-site deployment of the Malaysia Internet Exchange (MyIX).
0.99 miles TelcoHub X1 Cyberjaya
1.01 miles CSF Computer Exchange 5 (CX5)
Developed in three phases over three years, CX5 was completed in 2015.
1.08 miles Bridge Data Centres Cyberjaya MY02
1.19 miles Bridge: MY02 Bldg2
Bridge Data Centres (BDC) is expanding its footprint in Cyberjaya, Malaysia with the MY02 hyperscale data center project, adding substantial IT capacity across three phases.
1.24 miles Bridge: MY02 Bldg3
1.29 miles Bridge: MY02 Bldg4
1.43 miles Keppel Cyberjaya Basis Bay DC
1.49 miles Basis Bay: Cyberjaya DC1
Operational since 2009, Basis Bay DC.1 is a purpose-built, carrier-neutral facility designed to Tier III/Rated-3 standards (with Tier IV-ready mechanical and electrical redundancies).
1.52 miles STT Kuala Lumpur 1
STT Kuala Lumpur 1, is specifically designed for hyperscalers and is currently in the final stages of completion to meet the growing demand for global cloud and AI infrastructure.
1.53 miles Pi Data Centre: Cyberjaya
The development will span 7.3 acres, with Phase 1 construction scheduled to begin in the third quarter of 2024. The project is expected to be completed by the fourth quarter of 2025.
1.53 miles Basis Bay: Cyberjaya DC2
Basis Bay Cyberjaya DC.2 is a pioneering "Eco-Green Premium Data Centre" designed to meet the rigorous demands of the banking, financial services, and government sectors.
1.58 miles Vantage: KUL13
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
1.59 miles Vantage: KUL14
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
1.60 miles Open DC CJ1
1.60 miles MyTelehaus Cyberjaya CJ1 Centre
1.61 miles Hyperscale Data Center Request Dataset
AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.
1.62 miles Vantage Cyberjaya KUL11
Vantage's multi-story, four-data-center KUL1 campus is an 8-minute drive from the Central Business District via the Persiaran APEC and a 30-minute drive from Kuala Lumpur International Airport.
1.63 miles Equinix Kuala Lumpur KL1
Equinix KL1 is located within Vantage KUL1 Data Center Campus.
1.63 miles Equinix: KL2
The site is strategically located less than one kilometer from Equinix's KL1 data center, which began operations in May 2024.
1.65 miles Vantage: KUL12
In 2022, Vantage launched the second data center (KUL12) on its Cyberjaya CJ1 campus in Kuala Lumpur, Malaysia.
1.66 miles Vantage Cyberjaya (KUL2)
The KUL2 campus, spanning 35 acres, is distributed across 10 structures covering 2.76 million sq ft (256,000 sqm).
1.98 miles Hyperscale Data Center Request Dataset
2.07 miles EdgeConneX: Cyberjaya
The EdgeConneX data center campus in Cyberjaya (KUL2) will encompass nine buildings across 30 acres, offering the scalable capacity and power to accommodate a diverse range of customer needs in the future.
2.08 miles Hyperscale Data Center Request Dataset
6.72 miles Bridge DC: Southville City 2
Bridge Data Centres and Malaysian developer Mah Sing Group Berhad are expanding their data center joint venture outside Kuala Lumpur.
6.87 miles Bridge DC: Southville City 1
The initial phase will focus on developing a data center site on 17.55 acres.
7.89 miles Bridge DC: Banting Campus
Bridge Data Centres (BDC), backed by Bain Capital, has acquired 136.1 acres in Banting’s IOI Industrial Park for RM740.68 million (~$158M).
8.43 miles EdgeConneX: Bukit Jalil
EdgeConnex is building a 60,000 sqm data center in Bukit Jalil, Malaysia. The site will feature a 132 kV substation.
8.58 miles Bridge: MY03 DC2
Phase One of the expansion was planned to be ready for service by Q3 2025.
8.59 miles Bridge Data Centres MY03
Bridge DC announced plans for the first building at the MY03 Campus in 2021.
8.63 miles Bridge: MY03 DC3
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
8.66 miles Bridge: MY03 DC4
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
9.28 miles Exsim: Bukit Jalil
The EXSIM Hyperscale Data Center Project in Bukit Jalil, Malaysia, complies with Uptime Institute's Tier III/Tier IV standards.
9.88 miles ModernOne Kajang
11.73 miles NEXTDC KL1 Petaling Jaya
Once completed, KL1 will be the first Uptime Institute (UI) Tier IV certified data centre facility in Peninsular Malaysia.
12.05 miles EC31 Kuala Lumpur
12.48 miles Basis Bay: Glenmarie DC1
Basis Bay's Glenmarie DC.1 (also referred to as Subang Hi-Tech DC.1) is one of the company's established, purpose-built facilities located in Shah Alam, Malaysia.
12.56 miles Basis Bay: Glenmarie DC2
12.93 miles MyTelehaus Kuala Lumpur P33 Centre
13.07 miles TM KELANA JAYA DATA CENTRE (KJDC)
13.14 miles Strateq: Petaling Jaya
14.54 miles Hexatoff: Enstek City
The Hexatoff Group AI Data Center in Enstek City is a flagship digital infrastructure project designed to position Malaysia as a regional leader in high-performance computing.
14.72 miles Exitra: Kuala Lumpur
14.73 miles TM Brickfields Data Centre (BFDC)
15.29 miles i-Berhad: i-City Bldg-1
Located in the heart of Shah Alam, i-Berhad’s Building 1 (also known as Block M) serves as the foundation for the i-City Data Centre Park.
15.30 miles Strateq: Shah Alam I-City
15.38 miles i-Berhad: i-City Bldg-3
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
15.40 miles i-Berhad: i-City Bldg-2
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
15.47 miles Regal Orion: Shinsei 1
The facility is designed as a Tier IV green mega data center with capacity for 4,064 racks.
15.73 miles AIMS: KL2
AIMS Group, owned by DigitalBridge, expanded its Malaysian footprint in 2024 with the launch of Bangunan AIMS (also known as KL2) in Kuala Lumpur.
15.74 miles Crypto Mining Data Center Request Dataset
This facility is part of Bitdeer's Kuala Lumpur campus in Malaysia.
15.74 miles Crypto Mining Data Center Request Dataset
This facility is part of Bitdeer's Kuala Lumpur campus in Malaysia.
15.74 miles Crypto Mining Data Center Request Dataset
15.75 miles AIMS Kuala Lumpur Menara
16.39 miles EdgeConneX: CBD Kuala Lumpur
EdgeConnex is building a 19,200 sqm data center with in the Central Business District in Malaysia.
16.49 miles Safehouse: Wisma Mont’ Kiara
Launched in 2011, the 5,000 sq ft facility utilizes IBM's Scalable Modular Data Centre Solutions (SMDC) and incorporates technology from Schneider Electric and Juniper Networks.
17.86 miles YTL: Sentul 1
YTL’s Sentul Data Center 1 is located in the heart of Kuala Lumpur.
19.06 miles TM Morib CLS
Located in Morib, Selangor, Telekom Malaysia’s new 7,000 sq ft open cable landing station (CLS) serves as a strategic gateway along the Straits of Malacca.

NTT Cyberjaya 4 Data Center Photos (See all)

NTT's Sora Data Centre
Source: Shaw Architect
Ground Floor Plan for CBJ3 and CBJ4
Source: Baxtel
CB5 and CB6 Expansion Plans
Source: Baxtel
Sectional Perspective
Source: Shaw Architect
Cyberjaya 4 Lounge Area
Source: Baxtel
Seamless Cloud for the World
Source: Baxtel
CBJ4 Office Area
Source: Baxtel
Reception Counter
Source: H Lin Ho
Lobby Area
Source: Baxtel
Drop Off Area
Source: H Lin Ho
NOC Room
Source: H Lin Ho
Lobby Area
Source: H Lin Ho
Unknown Area
Source: Baxtel
Large Bonsai Tree
Source: H Lin Ho
Contained Colocation Room
Source: Baxtel
CyberJaya 4
Source: Baxtel
Nexcenter Hallway at CBJ4
Source: Baxtel
NTT's MSC Global Solution Center (Office)
Source: Baxtel
View of CBJ3 and CBJ4
Source: Leang Wai Loon
2017 Cyberjaya4 Expansion
Source: Baxtel
MSC Global Solution Office
Source: Baxtel
NTT Malaysia Cyberjaya 4 Data Center
Source: NTT
The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unautho...
Loading Bay
Source: NTT

The loading bay consists of a one meter height platform for two trucks for loading/unloading of heavy equipment. The roller shutter is integrated with interlocking control design to prevent unauthorized access.

Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.
Power Cable
Source: NTT

Cyberjaya 4 Data Center provides customers with 32 Amp single-phase power sockets for each standard rack. These sockets are colored red and grey.

The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.
...
Standard Cabinets
Source: NTT

The load capacity for each 42U rack is about 900 kg (including rack unit) and Cyberjaya 4 Data Center has two options of rack which are W 600 mm × D 1000 mm × 42 U or W 800 mm × D 1000 mm × 42 U.

NTT provides power capacity and associate cooling of at least 3kVA per rack.

Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.
Generator Room
Source: NTT

Generators are in 2N redundant configuration with enough fuel to run at full load for 36 hours. We also have a contract with a diesel supplier to ensure continuous fuel supply.


Designated staging area is available for customer use.
Staging Area
Source: NTT

Designated staging area is available for customer use.

Meeting room is available next to the staging area.
Customer Meeting Room
Source: NTT

Meeting room is available next to the staging area.

Operating Company

Operated by: NTT MSC Sdn. Bhd

Established in 1997, NTT MSC Sdn Bhd, short for "sendirian berhad" (Malay equivalent to incorporated), was named after the renowned Multimedia Super Corridor (MSC), currently known as MSC Malaysia, a national information and communications technology (ICT) initiative conceptualised in 1996 as one of the main programs to accelerate Vision 2020--the strategic intent of the Malaysian government to transform Malaysia into a developed country by the year 2020.

NTT MSC's head office is strategically based in Cyberjaya, while the sales office is located in the heart of Kuala Lumpur's Golden Triangle

8
Facilities
0
Markets
49MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?