NTT Hamburg 1

Latest Podcast Langenhorner Chaussee 40
Operational
Fully operational facility
Operated by:

NTT Hamburg 1

Ownership: NTT unknown the building.
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Power:


  • Medium-voltage feed from the European grid via a local power supplier (2 x 800 kVA transformer station)
  • UPS (UPS power supply: 2 + 1 module x 400 kVA) with bridging time minimum 15 minutes at full load
  • Emergency generators (1 x 1,400 kVA) with fuel storage for 48 hours

Security:


  • Connection to the 24/7 Security Command and Control Center of e-shelter security GmbH
  • Central access control with a personal access control system
  • Intruder alarm systems and video cameras for exterior surveillance and building surveillance of the entrances and corridors up to the rental unit

Map and Nearby Locations

Langenhorner Chaussee 40
NTT Sites
Nearby Facilities

Sites within 15 miles of NTT Hamburg 1

Distance Site About
0.11 miles GlobalConnect Hamburg (HAM1)
0.15 miles Level3 Hamburg (Flughafenstraße)
1.34 miles AtlasEdge: HAM001
AtlasEdge HAM001 Data Centre is located just 2.5 kilometre away from the nearest major airport, and connected via bus just 200 metre from this site.
1.37 miles Penta Infra: HAM01
1.37 miles Penta Infra: Hamburg
Located in Hamburg, Germany, Penta Infra's colocation data center provides 2,500 sqm (26,910 sq ft) of white space.
1.76 miles Equinix Hamburg HH1
3.05 miles q.beyond: Hamburg Data Harbour
The Hamburg Data Harbour, operated by q.beyond, is a TÜV and ISO-certified data center complex in Hamburg with advanced infrastructure connecting its facilities.
5.86 miles dataR: Rellingen, Hamburg
German firm dataR has officially begun construction of its Hamburg data center located in Rellingen. The facility will offer 5MW across 4,900 sqm (52,745 sq ft) of technical space.
6.03 miles GlobalConnect Hamburg (HAM3)
6.03 miles Portus: IPHH 3
The IPHH3 colocation edge facility, located in Hamburg, was launched in 2019.
6.08 miles Global Connect Hamburg
6.17 miles Portus: IPHH 4
The facility will span 6,380 square meters, consisting of two buildings, each 3,190 square meters, located on land next to the existing IPHH3 data center.
6.18 miles euNetworks Hamburg
6.18 miles IPHH Wendenstraße
6.19 miles Portus: IPHH 2
6.27 miles NorthC: Hamburg 1
Initially established by Level 3 Communications, the facility transitioned through the ownership of CenturyLink and Lumen Technologies before being acquired by Colt Technology Services.
6.68 miles ITENOS Hamburg
10.81 miles AtlasEdge: HAM002
Datacenter One (DC1), the German colocation company acquired by AtlasEdge in 2023, announced the opening of a new data center.
12.70 miles nLighten Hamburg HAM1
The data center is located just off the A1 motorway, 15 minutes from Hamburg’s main train station, and 30 minutes by car from Hamburg Airport.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240 network...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?