NTT Gains Council Approval for 482MW Data Center Campus in Nierstein, Germany
December 15, 2025
NTT
| Distance | Site | About |
|---|---|---|
| 0.35 miles | Colt Osaka Keihanna |
|
| 0.41 miles | STACK: KIX01C |
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
|
| 0.43 miles | STACK: KIX01B |
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
|
| 0.45 miles | ESR Group: Keihanna OS4 |
ESR Group and STACK Infrastructure, major players in APAC's New Economy real estate and global digital infrastructure, are jointly building a new data center campus in Keihanna, Japan (Kansai region).
|
| 0.46 miles | STACK Osaka KIX01 |
Located in Osaka’s eastern suburb of Keihanna, this data center campus will comprise three buildings with robust access to power and network to ensure strong reliability.
|
| 1.15 miles | Kagoya: Keihanna Lab B |
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
|
| 1.16 miles | Kagoya: Keihanna Lab A |
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
|
| 3.09 miles | ADA: Osaka East 1 |
GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
| 3.31 miles | EdgeConneX: Osaka Kyotanabe |
Data center firm EdgeConneX plans to develop a facility in the greater Osaka-Kyoto area in partnership with Kagoya Asset Management.
|
| 3.33 miles | EdgeConneX: Kyotanabe 2 |
This facility is part of EdgeConneX Kyotanabe campus in Osaka.
|
| 7.25 miles | EdgeConneX: Yawata 3 |
This facility is part of EdgeConneX Yawata Campus in Osaka.
|
| 7.29 miles | EdgeConneX: Osaka Yawata |
EdgeConneX expands in Japan, securing a long-term land lease for its second data center site in Greater Osaka/Yawata.
|
| 7.29 miles | EdgeConneX: Yawata 2 |
This facility is part of EdgeConneX Yawata Campus in Osaka.
|
| 8.97 miles | Goldman Sachs: Higashiosaka |
Goldman Sachs acquired land to build a data centre in Daito, Higashiosaka.
|
| 12.76 miles | NTT Osaka 7 | |
| 13.57 miles | Equinix Osaka OS3 | |
| 13.61 miles | Telehouse: Osaka 2 |
Built as the major Telehouse Data Center for the west of Japan, The Osaka 2 Data Center facility began service on 21st August, 2015.
|
| 13.62 miles | Digital Edge: Osaka OSA1 | |
| 13.82 miles | NTT: Nishiai |
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
|
| 14.39 miles | IDC Frontier: Osaka Suita |
|
| 14.66 miles | MC Digital Osaka 3 (KIX12) | |
| 14.68 miles | Telehouse: Osaka Umeda |
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
|
| 14.68 miles | Optage: Umeda North |
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
|
| 15.00 miles | NTT OS2 (Telepark Dojima Building 2) | |
| 15.10 miles | NTT Osaka OS4 | |
| 15.11 miles | Optage: Sonezaki |
Named 'Optage Sonezaki Data Center,' the 14-story carrier-neutral facility will offer 24,100 square feet (2,250 square meters) of space and incorporate seismic isolation design for earthquake protection.
|
| 15.21 miles | CapitalLand: Osaka 01 |
The new facility will include more than nine data halls along with dedicated office and working spaces to support operations.
|
| 15.30 miles | Vantage Osaka (KIX1) |
Located in Ibaraki, the Osaka campus comprises 485,000 square feet (45,000 square meters) and features two four-story, state-of-the-art facilities built to withstand even the worst earthquakes.
|
| 15.30 miles | Vantage: KIX12 |
This facility will be part of Vantage's Osaka (KIX1) Campus in Osaka, Japan.
|
| 15.34 miles | Equinix: OS4x |
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
|
| 15.34 miles | Equinix: OS5x | |
| 15.59 miles | AirTrunk: Osaka OSK2 |
AirTrunk’s newly announced OSK2 project is a massive hyperscale development located in East Osaka, designed specifically to meet the surging demand for cloud and artificial intelligence (AI) infrastructure in the Kansai region.
|
| 15.59 miles | AirTrunk: OSK2 Expansion | |
| 15.59 miles | Empyrion: Osaka JP2 | |
| 15.90 miles | NTT: Osaka North 1(OSK12) |
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
|
| 15.93 miles | NTT OS3 (Telepark Dojima Building 3) | |
| 15.94 miles | NTT Data Osaka Dojima (Building #4) | |
| 15.96 miles | MC Digital Osaka Connected Campus (KIX) |
|
| 16.02 miles | Telehouse: Osaka Shinsaibashi |
KDDI Telehouse operates a colocation data center in Shinsaibashi, Japan.
|
| 16.02 miles | Optage: Shinsaibashi |
The Shinsaibashi Data Center in central Osaka was launched in 2008. OPTAGE will establish a new connectivity area “Shinsaibashi POP (Point Of Presence)” within the existing Shinsaibashi Data Center in Osaka City By 2025.
|
| 16.02 miles | Hyperscale Data Center Request Dataset | |
| 16.02 miles | INAP Osaka |
|
| 16.05 miles | Mapletree: Osaka |
The multi-story facility is built on a 4,200 sqm site and offers 13,330 sqm of total space, including 12,720 sqm of lettable area. The property comes with a 70-year land lease that began October 1, 2020.
|
| 16.11 miles | NTT Osaka 5 | |
| 16.16 miles | Equinix Osaka OS1 |
Opened in 2013, the first phase, with room for 320 cabinets is a US$12m investment. Once fully opened the site will carry 800 cabinets.
|
| 16.16 miles | Optage: Shinmachi | |
| 16.28 miles | IIF Osaka Toyonaka |
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
|
| 16.35 miles | MC Digital Osaka 1 (KIX10) |
|
| 16.43 miles | MC Digital Osaka 2 (KIX11) |
|
| 16.66 miles | MC Digital Osaka 4 (KIX13) | |
| 16.78 miles | Equinix: OS2x | |
| 17.93 miles | Colt: Minoh, Osaka |
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
|
| 17.93 miles | Colt: Minoh 2 |
This facility is part of Colt's Minoh Campus in Osaka, Japan.
|
| 17.93 miles | ESR Group: Minoh, Osaka |
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
|
| 18.83 miles | NTT: OSK12 Bldg-2 | |
| 19.18 miles | AirTrunk: Osaka OSK1 |
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.
|
Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.
As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.
December 15, 2025
NTT
December 06, 2025
NTT
September 10, 2024
NTT
February 17, 2024
NTT
January 13, 2024
NTT
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas