NTT: Pacific 7

Latest Podcast E Pecos Rd
Planned
Future facility in planning stage
Operated by:

NTT: Pacific 7

Year Planned: 2034
Ownership: NTT owns the building.

This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.

Map and Nearby Locations

E Pecos Rd
NTT Sites
Nearby Facilities

NTT: Pacific 7 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT: Pacific 7

Distance Site About
0.09 miles NTT: Pacific 6
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
0.21 miles NTT: Pacific 5
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
0.24 miles NTT: Pacific 3
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
0.26 miles NTT: Pacific 2
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
0.32 miles NTT: Pacific 1
NTT Data has acquired 173 acres at the northeast intersection of Pecos and Crismon roads, east of Mesa, for $300 million.
0.32 miles NTT: Pacific 4
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
0.49 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.54 miles West PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.31 miles Edged Energy: Phoenix, Arizona
Edged Energy is building a 79,200 sq ft data center on a 14-acre site near the Loop 202 freeway and Warner Road.
3.31 miles Edged: Phoenix
Edged Energy’s PHX01-1 is a 36MW, two-story data center in Mesa, Arizona, spanning ~210,000 sq ft on a 12-acre site, launched in April 2026 with waterless cooling for high-density AI workloads.
3.38 miles Novva: Mesa 2
This facility is a part of Novva's Mesa campus in Arizona.
3.39 miles Novva: Mesa 5
This facility is a part of Novva's Mesa campus in Arizona.
3.47 miles Novva: Mesa 4
This facility is a part of Novva's Mesa campus in Arizona.
3.48 miles Novva: Mesa 1
Covering 160 acres, Novva’s first Arizona Data Center campus is located in Mesa, AZ. The campus includes five data halls, 1.3 million sq ft of data hall space, and 200,000 square feet of office space built over 2 phases.
3.50 miles EdgeCore: PH01
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 200,880 sqft with an adjoining 20,000 sqft office and support space included.
3.51 miles EdgeCore: PH03
3.55 miles Novva: Mesa 3
This facility is a part of Novva's Mesa campus in Arizona.
3.57 miles EdgeCore: PH02
3.73 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.75 miles Edge RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.75 miles PointInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.75 miles Plaza MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.79 miles EdgeCore: Mesa Expansion
EdgeCore Digital Infrastructure is significantly expanding its data center campus in Mesa, Arizona. The company plans to add an additional 43.87 acres to its existing 40-acre facility.
3.81 miles Core TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.82 miles North CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.85 miles Tower ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.93 miles NTT PH1
The first data center building encompasses 126,000 sqft of data floor space.
3.96 miles CyrusOne Mesa
CyrusOne plans to develop a new campus on 62 acres on the corner of Elliot and Ellsworth Roads.
4.10 miles NTT PH3
4.11 miles NTT PH6
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
4.19 miles NTT PH2
4.21 miles NTT PH5
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
4.29 miles NTT PH4
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
4.44 miles Edgeconnex: Mesa
EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.
4.49 miles Edged Energy: Phoenix PHX11
Edged Energy is planning a built-to-suit data center near its PHX01 facility.
4.51 miles Comarch Mesa
5.29 miles North PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.44 miles Prime HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.47 miles Cloud RidgeInterested in this information?Contact us
12.90 miles US Signal Phoenix AZ01
13.57 miles Ryan: Florence Tech Park
The 780-acre development, dubbed the Florence Tech Park, has been presented with varying plans. Initial conceptual documents show five data centers, two office buildings, and one general industrial building.
14.45 miles EdgeCore: Dobson Expansion
14.56 miles EdgeCore: Dobson Farms
Ryan Companies and EdgeCore are moving forward with plans to develop a massive new data center and industrial campus on over 780 acres located in the town of Florence, Pinal County.
15.42 miles CyrusOne PHX3
15.43 miles CyrusOne PHX10
15.43 miles CyrusOne PHX1
15.46 miles CyrusOne PHX5
15.46 miles CyrusOne PHX7
15.49 miles CyrusOne PHX2
15.49 miles CyrusOne PHX4
15.49 miles DataCanopy: Phoenix, AZ
15.52 miles CyrusOne PHX6
15.53 miles CyrusOne PHX9
15.58 miles CyrusOne PHX8
15.60 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
15.61 miles Lincoln: Chandler Bldg-1
Lincoln Property Company's 150,000 sq ft, four-hall data center at 2500 W Frye Road, Chandler, Arizona, is the first building on its Chandler campus. Lincoln re-acquired it in 2025.
15.63 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
15.63 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
15.74 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
15.79 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
15.79 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
15.89 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
16.57 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
16.76 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
16.80 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read NTT to Develop 200MW Data Center Campus Near Tokyo
NTT to Develop 200MW Data Center Campus Near Tokyo

NTT to Develop 200MW Data Center Campus Near Tokyo

April 21, 2026 NTT

Japanese technology giant NTT has announced plans for a new data center outside Tokyo. NTT Data this week said that work has begun on a new data center development in the Inzai–Shiroi area of Chiba Prefecture, outside Tokyo.The facility is being developed through NTT Global Data Centers (NTT...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?