0.13 miles
|
NTT Hempstead 1
|
|
0.32 miles
|
NTT Hempstead 2
|
|
0.36 miles
|
NTT Hempstead4
|
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
|
8.15 miles
|
Thrive Luton
|
|
8.15 miles
|
DRT London (Chess Building)
|
|
8.51 miles
|
Echelon LCY20
|
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
|
11.13 miles
|
Colt London North: Welwyn Garden City
|
London, Welwyn Garden City is a carrier neutral facility situated just 35 minutes train journey north of London’s Kings Cross station.
|
11.13 miles
|
INAP North London
|
INAP's North London data center is located within Colt's facility on Black Fan Road
|
15.29 miles
|
Barclays Data Centre
|
|
15.29 miles
|
Kao Data: Northolt
|
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
|
15.99 miles
|
LDeX London LDeX1
|
|
17.12 miles
|
Coreix Enfield
|
|
17.32 miles
|
Google: Waltham Cross
|
Google has started building a new data centre in Waltham Cross, Hertfordshire.
|
17.36 miles
|
VIRTUS: London 7
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
17.38 miles
|
VIRTUS: London 6
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
17.41 miles
|
Options West London
|
|
17.44 miles
|
VIRTUS: London 8
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
17.44 miles
|
VIRTUS Stockley Park Campus
|
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
17.51 miles
|
DRT London (Cresses Business Park)
|
|
17.54 miles
|
Equinix London LD3
|
|
17.54 miles
|
Colt: London 4
|
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
17.65 miles
|
Ark: Alliance Park
|
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
17.65 miles
|
Colt Powergate
|
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
17.73 miles
|
Equinix London LD9 Powergate
|
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
17.77 miles
|
VIRTUS: London 14
|
The data center, currently under construction, will span two floors upon completion. It will offer 8,600 square meters of white space divided among 6 data halls.
|
17.82 miles
|
Vantage London II
|
|
17.87 miles
|
Microsoft: Park Royal
|
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
17.89 miles
|
CyrusOne London II (Stockley Park)
|
The London II datacenter was originally built by Infinity SDC.
|
17.90 miles
|
Virtus: Saunderton Campus
|
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings totaling 75MW of IT capacity.
|
17.94 miles
|
CyrusOne: London II
|
|
17.96 miles
|
Vantage London I Campus
|
|
18.00 miles
|
VIRTUS London1 Enfield
|
|
18.03 miles
|
Redwire
|
|
18.04 miles
|
Ark: Union Park
|
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
18.23 miles
|
CyrusOne London III
|
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
18.25 miles
|
Level3 Slough
|
|
18.29 miles
|
Yondr Slough
|
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
|
18.29 miles
|
CyrusOne London I
|
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
18.30 miles
|
Iron Mountain London LON-1
|
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
18.30 miles
|
Iron Mountain London LON-2
|
|
18.31 miles
|
Equinix LD10
|
|
18.32 miles
|
VIRTUS Slough London 3 and 4
|
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
18.36 miles
|
Equinix: Wexham Road
|
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
18.36 miles
|
Equinix LD12
|
|
18.37 miles
|
Equinix LD14
|
|
18.38 miles
|
Equinix LD7
|
|
18.40 miles
|
Equinix LD13x
|
|
18.42 miles
|
VIRTUS LONDON10
|
|
18.42 miles
|
Rackspace London Slough (LON3)
|
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
18.44 miles
|
GoDaddy Slough (HEG)
|
|
18.44 miles
|
Equinix Slough Campus LD4, LD5, LD6, LD10
|
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
18.45 miles
|
Logicalis Slough
|
|
18.45 miles
|
VIRTUS Hayes London2
|
|
18.47 miles
|
Equinix LD6
|
|
18.48 miles
|
QTS London
|
|
18.48 miles
|
Equinix LD5
|
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
18.51 miles
|
VIRTUS LONDON9
|
|
18.56 miles
|
Equinix LD4
|
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
18.58 miles
|
NTT Slough 3
|
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
18.59 miles
|
GTR: Slough
|
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
18.59 miles
|
GTR: Slough 2
|
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
18.60 miles
|
GTR: Slough 3
|
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
18.60 miles
|
Equinix LD11x
|
|
18.61 miles
|
NTT Slough 2
|
|
18.63 miles
|
VIRTUS London 11
|
|
18.63 miles
|
China Mobile Slough
|
|
18.64 miles
|
Cyxtera Slough LO5
|
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
18.65 miles
|
Cyxtera: LHR1
|
|
18.68 miles
|
Kao Data Slough
|
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
18.83 miles
|
CyrusOne LON5
|
|
19.34 miles
|
DRT London (West Drayton)
|
|
19.57 miles
|
Ark: Meridian Park
|
|