NTT Bengaluru DC3

Latest Podcast Survey No. 146
Operational
Fully operational facility
Operated by:

NTT Bengaluru DC3

░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Power specifications

  • Power Receiving: BESCOM
  • Load Capacity: 20MVA
  • Transformer Capacity: N 2, 12 x 2250 KVA
  • UPS: N:N redundant configuration with at least 10-minute battery retention time
  • Power back up: N 2 redundant configuration and fuel-free operation for at least 24 hours
  • Battery Back Up: 10 minutes on full load
  • Standard Power per Rack: 16 Amp, 32 Amp (Redundant Circuits)
  • Total electric power capacity for IT equipment: 7 MW
  • Dual power feed, PDU sources to each rack

Map and Nearby Locations

Survey No. 146
NTT Sites
Nearby Facilities

Sites within 15 miles of NTT Bengaluru DC3

Distance Site About
3.48 miles Reliance Bengaluru IDC3
3.83 miles CapitaLand: Bangalore 01
CapitaLand Data Centre Bangalore 1 is situated within International Tech Park Bangalore (ITPB) located in Whitefield, Bangalore.
3.91 miles Iron Mountain: Bengaluru
First announced in February 2022 and located in the Whitefield area, the 80,000-square foot (7,430 sqm) BLR-1 facility is built to Tier III standards.
4.30 miles Sify: Bangalore 02
Sify is developing its second Bengaluru data center campus, located at Aerospace Park, with plans for two towers. The first tower is scheduled to begin operations in 2025.
4.38 miles STT Bangalore 2
4.52 miles L&T: Bengaluru BLR1
L&T Cloudfiniti, the data center arm of the L&T conglomerate, plans to invest up to Rs 3,600 crore (~US$415 million) in India to construct three new data centers, including BLR1 in Bengaluru.
4.53 miles STT Bangalore 3
5.13 miles Nxtra: Bengaluru I
Nxtra Bengaluru 1 is a 2,000-rack facility located in the region’s capital, Bengaluru (formerly known as Bangalore).
5.28 miles Tulip Data City TDC Bangalore
9.17 miles Teleindia Datasamudra
9.62 miles Nxtgen Infinite Bengaluru Whitefield
9.64 miles NxtGen Infinite Bengaluru
11.45 miles CtrlS Bengaluru
11.92 miles AdaniConneX: Bengaluru
AdaniConneX plans to build a data center in Bengaluru, India.
12.14 miles STT Bangalore 1
13.19 miles Nxtra: Bengaluru II
Nxtra Bengaluru II will be a 450,000 square foot hyperscale data center in Bengaluru, Karnataka, India, capable of housing 5,000 racks.
13.42 miles NTT: BLR 4C
This facility will be part of NTT's Bengaluru 4 Campus in India.
13.45 miles NTT: BLR 4B
This facility will be part of NTT's Bengaluru 4 Campus in India.
13.48 miles NTT: Bengaluru 4 Campus
This campus will comprise three data centers—4A, 4B, and 4C—providing a total of 17,000 square meters (182,986 sq ft) of data center space.
15.01 miles NTT Bengaluru (DC2)
15.02 miles Sify: Bangalore 01
Sify's first data center in Bangalore has capacity for over 600 racks.
15.03 miles ESDS: Bengaluru DC
ESDS operates a data center in Bengaluru, in partnership with STPI.
15.15 miles Reliance Bengaluru IDC2
15.24 miles Reliance Bengaluru

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read NTT to Develop 200MW Data Center Campus Near Tokyo
NTT to Develop 200MW Data Center Campus Near Tokyo

NTT to Develop 200MW Data Center Campus Near Tokyo

April 21, 2026 NTT

Japanese technology giant NTT has announced plans for a new data center outside Tokyo. NTT Data this week said that work has begun on a new data center development in the Inzai–Shiroi area of Chiba Prefecture, outside Tokyo.The facility is being developed through NTT Global Data Centers (NTT...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?