Site: NTT Johannesburg 1

Company: NTT
Metro: Johannesburg
Country: South Africa
Region: Africa
Region: EMEA
Region: World
Address:
Sterling Rd & Samrand Ave (Approximate Location)

Gross SqFt: 64,583
Total Power: ??? NN
Interested in this information? Contact us
Megawatts

The data center design is based on tier 3 standards and will be constructed in two phases. When fully built it will deliver a total of 6,000 sqm of IT space and 12 MW of IT load. The first phase of the site is scheduled to become operational beginning of 2022.

Map and Nearby Locations:

Sterling Rd & Samrand Ave

SITES within 15 miles of NTT Johannesburg 1

Show SqM



Distance Site name SqFt MW
0.45 miles xneelo JNB1 Samrand
0.53 miles ADC Samrand JHB2 129,167 30
6.11 miles ADC Midrand JHB1 96,875 18
6.90 miles Vantage Johannesburg 130,000 16
10.78 miles Teraco JB4 86,111 19
13.76 miles Teraco Bredell Campus (JB2) 64,583 20
Birdseye view of the NTT's first data center in South Africa

June 2021

JOH 1 Data Sheet (PDF)