NTT Johannesburg 1

Latest Podcast Sterling Rd & Samrand Ave
Operational
Fully operational facility
Operated by:

NTT Johannesburg 1

Year Built: 2022
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The data center design is based on tier 3 standards and will be constructed in two phases. When fully built it will deliver a total of 6,000 sqm of IT space and 12 MW of IT load. The first phase of the site is scheduled to become operational beginning of 2022.

Map and Nearby Locations

Sterling Rd & Samrand Ave
NTT Sites
Nearby Facilities

NTT Johannesburg 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT Johannesburg 1

Distance Site About
0.29 miles Cosmas Data City – Samrand
The Cavaleros Group, a South African real estate firm, is expanding into the data centre sector with its new division, Cosmas Data Cities (CDC).
0.33 miles NTT Data: JOH1, Johannesburg
The NTT Johannesburg 1 Data Center (JOH1) is a carrier-neutral, Tier-III standard colocation and interconnection facility that supports enterprise digital infrastructure and hyperscale cloud operations in South Africa
0.42 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.45 miles xneelo JNB1 Samrand
0.53 miles ADC Samrand JHB2
ADC´s JHB2 Samrand Data Centre is a former Standard Bank data centre
1.13 miles Digital Parks Africa: Samrand
DPA is adding 810 sqm (8,720 sq ft) and 570 racks to its existing Centurion facility, which currently features over 1,620 sqm of dedicated whitespace.
6.11 miles ADC Midrand JHB1
6.67 miles Vantage: JNB11
The campus sits on 30 acres (12 hectares) and will feature three data centers at full build-out.
6.70 miles Vantage: JNB12
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
6.74 miles Vantage: JNB13
This data center building is a part of Vantage's Johannesburg I campus in South Africa.
10.86 miles Teraco JB4
Located in South Africa, the JB4 facility spans 80,000 sqm (861,110 sq ft) and features 14 data halls which comprise 17,000 sqm (182,985 sq ft) of space.
13.76 miles Teraco Bredell Campus (JB2)
15.18 miles Teraco JB5
Teraco, a South African data centre operator, launched its JB5 facility in 2025.
15.19 miles OADC: Isando
Pan-African operator Open Access Data Centres (OADC) launched its Johannesburg data center in December 2022.
15.28 miles Teraco: JB7
Teraco, a Digital Realty owned South African data center operator, has broken ground on its latest facility known as JB7, located at the Isando Campus in Ekurhuleni, east of Johannesburg.
15.30 miles Teraco JB3
Teraco's JB3 facility spans 45,000 square metres of building structure, including 12,000 square metres of data white space.
15.31 miles Telehouse Johannesburg
15.31 miles Teraco: JB1
16.46 miles Vantage: Johannesburg II
The first building of the JNB2 Islando campus consists of a 355,000 square foot (33,000 square meters) two-story data center. This is Vantage Data Centers' second campus in Johannesburg, South Africa.
16.51 miles Equinix Johannesburg JN1
16.65 miles Internet Solutions Johannesburg 158 Jan Smuts

NTT Johannesburg 1 Data Center Photos See all

Birdseye view of the NTT's first data center in South Africa
Source: Baxtel

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read NTT to Develop 200MW Data Center Campus Near Tokyo
NTT to Develop 200MW Data Center Campus Near Tokyo

NTT to Develop 200MW Data Center Campus Near Tokyo

April 21, 2026 NTT

Japanese technology giant NTT has announced plans for a new data center outside Tokyo. NTT Data this week said that work has begun on a new data center development in the Inzai–Shiroi area of Chiba Prefecture, outside Tokyo.The facility is being developed through NTT Global Data Centers (NTT...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?