NTT Vienna

Latest Podcast Computer Straße 4
Operational
Fully operational facility
Operated by:

NTT Vienna

Short Code: VIE1
Year Built: 2015
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Opened in June 2015, the is situated in the South-West of the Vienna city center in the tenth district, Favoriten, approx. 6 km distance to Vienna city center and approx. 20 km distance to the Vienna International Airport.

On a nearly 29,000 sqm property approx. 24,000 sqm of gross floor space altogether 8,400 sqm data center space are being created in three building stages.

The building is a dedicated new data center building and offers on the first construction stage approx. 2,800 sqm data center space. Two further building stages will be developed at a later date. Aditionally, the data center Vienna offers 1,000 sqm well equipped office and conference space as well as a large reception and meeting area which may be used for events.

Power:


  • Electric power capacity 20 MW
  • UPS at medium voltage level 10 kV from two substations from two separate feeds
  • The critical power supply is designed as a dual power supply with uninterrupted A- and B-power supply

Security:


  • Connection to the 24/7 Security Command and Control Center (SCC) of e-shelter security GmbH
  • Central access control with a personal control system
  • Intruder alarm system and video surveillance to perimeter protection and building surveillance of the access door and corridor up to the leased units

Connectivity:


  • Carrier-neutral
  • Carrier-mix from global Tier 1 supplier to local supplier
  • Direct, redundant connection to VIX
  • Via several partners direct connection to international internet exchanges
  • Cross-Connects are realized via dedicated, redundant designed pipelines
  • Datacenter Connects between the data center Vienna and e-shelter locations, e.g. Campus Frankfurt 1 and Frankfurt 3; on request as well to commercial third-party data centers

Map and Nearby Locations

Computer Straße 4
NTT Sites
Nearby Facilities

NTT Vienna Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT Vienna

Distance Site About
3.09 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.88 miles A1 Telekom (VIVI)
3.89 miles xpirio Hainburger
3.94 miles Vienna University Computer Center
4.24 miles Raiffeisen Diana Haus (RDH)
5.71 miles Valley PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.79 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.26 miles AtlasEdge: Vienna
AtlasEdge has expanded into Austria through the acquisition of an existing data center located on the Siemens Campus in Vienna-Floridsdorf. AtlasEdge Vienna sits on 11,000 sqm plot with 10MW future capacity.
8.31 miles Digital Realty: Vienna
8.63 miles Digital Realty: Paukerwerkstrasse Campus
8.75 miles A1 Vienna XXI
The A1 Datacenter offers 2550 m² of Tier III-compliant datacenter whitespace within its 8000 m² facility, achieving a power usage effectiveness (PUE) of 1.4 or less.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy
[NTT DATA](https://baxtel.com/data-centers/ntt-data) will use Bloom Energy fuel cells as primary power at data centers worldwide under a [900MW agreement](https://www.nttdata.com/en-za/news/2026/nt...

NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy

November 06, 2026 NTT

NTT DATA will use Bloom Energy fuel cells as primary power at data centers worldwide under a 900MW agreement, with first shipments in 2027. The companies announced the agreement on Nov. 5. NTT Global Data Centers, the data center division of NTT DATA, will run the fuel cells as the main source of...

Read more
Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.