In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas. The facility, located at NTT's 12,516 sqm (134,720 sq ft) plot in the Európolis Business and Technology Park, offers 3,600 sqm (38,750 sq ft) of IT space.

Map and Nearby Locations

Calle Aquisgrán
NTT Sites
Nearby Facilities

NTT Madrid 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT Madrid 1

Distance Site About
10.50 miles nLighten Madrid-Lezama
11.17 miles hscale: Madrid MAD1
hscale plans to build its MAD1 data center campus in Madrid.
11.33 miles Echelon Iberdrola: Madrid South
The flagship project, the Madrid Sur campus (160,000 sqm), will be powered by a 100% renewable energy solution provided by Iberdrola.
11.44 miles Ibercom Madrid
11.89 miles AtlasEdge: Madrid MAD001
12.19 miles Produban Mesena 80
12.19 miles Espanix Datacenter
12.22 miles Equinix MD6
12.25 miles Equinix MD3x
12.26 miles Prime: Madrid
Prime Data Centers is developing a 26,000 square-meter data center in Madrid, Spain. The company has secured 7.6 acres in Alcobendas to develop the facility.
12.28 miles Equinix MD4x
Equinix MD4x is an operational xScale hyperscale data center at the company’s Alcobendas campus, publicly inaugurated alongside MD5 in May 2026.
12.30 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
12.30 miles Equinix MD5
Equinix has opened MD5 in Alcobendas, adding a new colocation facility to its Madrid campus and strengthening its interconnection footprint in Southern Europe.
12.43 miles Ferrovial: Alcobendas MAD01
Ferrovial Digital Infrastructure is building a multi-phase data center campus in Alcobendas, in Madrid’s Valdelacasa business park.
12.77 miles Quetta: Tres Cantos
12.89 miles BBVA CPD Tres Cantos
12.92 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
12.92 miles DATA4: MAD01 DC1
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
12.96 miles Equinix Madrid MD2
12.96 miles Equinix Madrid MD1
13.01 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
13.36 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
14.29 miles Digital Realty: MAD5
Planned Digital Realty data centre on about three acres at Calle de Alcalá in Madrid's San Blas-Canillejas district, next to MAD4. Digital Realty bought the land in October 2024.
14.34 miles Form8tion: Madrid One
14.35 miles Digital Realty: MAD4
14.36 miles NxN: Madrid
NxN Data Centers is developing its first Madrid data center at Calle de las Abelias, 1 in Hortaleza, Madrid, through the conversion of the former Banco Popular headquarters building.
14.40 miles Apto: Madrid
Apto is developing a five-building hyperscale data center campus on the former Casbega/Coca-Cola bottling plant site in Fuenlabrada, Madrid.
14.44 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
14.47 miles Cogent Madrid
14.55 miles Hispaweb Miguel Yuste
14.68 miles Grupo Aire OASIX: Madrid
The Grupo Aire OASIX Madrid data center spans almost 1,000m² and houses more than 256 racks.
14.72 miles Digital Realty: MAD3
14.74 miles Digital Realty: MAD1
Interxion's first Madrid data centre, a converted printing plant on Calle de Albasanz. It anchors the campus as Spain's main carrier hotel, with direct access to the ESpanix and DE-CIX Madrid exchanges.
14.77 miles Digital Realty: MAD2
14.94 miles Core HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.14 miles Adam Madrid
15.70 miles inAsset NixMad
16.67 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
16.69 miles Plaza ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.69 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
16.98 miles Global Switch: Madrid 1
16.99 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.25 miles IPCore Madrid
17.43 miles Edgnex: Madrid
Edgnex, a UAE-based data center company, is building a new facility in Spain. The site, located in the Vicalvaro region, was purchased from ActivumSG, a European real estate private equity manager.
18.52 miles Goodman: Madrid 01
Goodman Madrid 01 (MAD01) is a data center development located in Madrid, Spain, constructed on a converted brownfield site.
18.94 miles Data4: MAD02 DC01
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
18.96 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
19.01 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
19.02 miles Core RidgeInterested in this information?Contact us
19.03 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
19.73 miles Kyndryl: Madrid

NTT Madrid 1 Data Center Photos See all

Generators on the roof at MAD1
Source: Baxtel
MAD1 Entrance
Source: Baxtel
Exterior
Source: Baxtel
The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019
Interxion's Data Centers in Madrid
Source: Silicon Alley Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read NTT to Develop 200MW Data Center Campus Near Tokyo
NTT to Develop 200MW Data Center Campus Near Tokyo

NTT to Develop 200MW Data Center Campus Near Tokyo

April 21, 2026 NTT

Japanese technology giant NTT has announced plans for a new data center outside Tokyo. NTT Data this week said that work has begun on a new data center development in the Inzai–Shiroi area of Chiba Prefecture, outside Tokyo.The facility is being developed through NTT Global Data Centers (NTT...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?