NTT: Chicago CH4

Latest Podcast 1200 N Arlington Heights Rd
Planned
Future facility in planning stage
Operated by:

NTT: Chicago CH4

Short Code: CH4
Year Planned: 2028
Utility Provider: ComEd
Lot Size: 12 acres

CH4 is a planned 441,363 sq ft data center on a 12.26-acre lot at 1200 N. Arlington Heights Road on NTT's Itasca campus in Itasca, Illinois. NTT bought the two office buildings at 1200 and 1250 N. Arlington Heights Road for $27.5 million in November 2023 and cleared them.

The Village approved the data center in 2024. A September 2026 development agreement says NTT is seeking building permits.

Map and Nearby Locations

1200 N Arlington Heights Rd
NTT Sites
Nearby Facilities

NTT: Chicago CH4 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT: Chicago CH4

Distance Site About
0.13 miles NTT: Chicago CH2
CH2 is a two-story data center at 275 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with six data halls.
0.15 miles NTT: Chicago CH1
The first building on NTT's Itasca campus: a two-story data center at 255 Pierce Road with six data vaults and four primary 34.5 kV ComEd feeds plus one alternate.
0.23 miles NTT: Chicago CH3
CH3 is a data center under construction at 235 Pierce Road on NTT's Itasca campus in Itasca, Illinois, with four data vaults.
0.24 miles NTT: Chicago CH5
CH5 is a planned three-story data center on the former Marino Court subdivision east of Arlington Heights Road, the fifth and final building on NTT's Itasca campus.
1.56 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
2.02 miles Nexstar: Elk Grove Bldg3
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
2.04 miles CoreWeave: US Central ORD1
2.10 miles 1400 E Devon Ave (CH3) DRT
2.11 miles Nexstar: Elk Grove Bldg2
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
2.20 miles Nexstar: Elk Grove Bldg1
As of January 2026, the Nexstar/WGN data center project has expanded from its original 35-acre, three-building plan to a four-building campus utilizing a larger portion of the 102-acre transmitter site.
2.21 miles Deft: Elk Grove DF-CH1
2.21 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
2.22 miles Nexstar: Elk Grove Bldg4
This facility is part of Nexstar's Elk Grove data center campus in Illinois.
2.22 miles 2200 Busse Rd (CH1) DRT
2.23 miles Rackspace Elk Grove ORD1
2.25 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
2.26 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
2.31 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.33 miles Stack: CHI01B
Two-story data center at 1301 Touhy Avenue, built by STACK next to CHI01A on the same parcel, with four data halls and diverse underground ComEd feeds.
2.40 miles Stack: CHI01A
Single-story data center at 1441 Touhy Avenue in Elk Grove Village. Forsythe Technology broke ground on it in 2014, T5 bought it in 2016, and IPI Partners made it part of STACK. It adjoins CHI01B on a shared 14-acre parcel.
2.41 miles 2299 Busse (CH2) Digital Realty
2.44 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
2.48 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove Village, Illinois is a 226,000 square foot facility.
2.69 miles Equinix Chicago CH3
Equinix CH3 is a three-story colocation data center at 1905 Lunt Avenue in Elk Grove Village, Illinois, that Equinix opened in 2007 and expanded in five more phases through 2020.
2.76 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foot, two-story data center in Elk Grove, Chicago. This new facility is being built right next to their existing CH3 data center.
2.80 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
2.81 miles EdgeConneX CHI02
2.87 miles EdgeConneX: CHI04
CHI04 is a two-story, 164,000 sq ft EdgeConneX data center under construction at 901 Busse Road in Elk Grove Village, Illinois, near O'Hare Airport.
2.88 miles Stream Chicago I
Free-Standing, Data Center Designed to Tier III Standards
2.88 miles EdgeConneX CHI01
CHI01 is EdgeConneX's first Chicago data center, a 132,000 sq ft retrofit at 1800 Nicholas Blvd in Elk Grove Village, Illinois.
2.89 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
2.90 miles EdgeConneX: CHI03
EdgeConneX CHI03 is a new 167,000 sq ft, two-story data center building on its Elk Grove Village campus near Chicago.
2.95 miles EdgeConneX: CHI05
CHI05 is EdgeConneX's planned second data center on Busse Road in Elk Grove Village, Illinois, on the parcel next to CHI04.
2.97 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.01 miles CloudInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.08 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.09 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in Chicago, Illinois with a new data center in Elk Grove Village, known as CHI02.
3.14 miles Stream: Chicago ORDC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
3.17 miles Stream: Chicago ORDC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
3.19 miles Prime: ORD01-02
Building B will be another three-story construction, offering 279,360 gross square feet of space.
3.23 miles Prime: ORD01-01
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago), Illinois, which will comprise an investment of around $1 billion.
3.29 miles Prime: ORD01-03
Building C will be another three-story construction, offering 294,429 gross square feet of space.
3.30 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
3.37 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Village, a suburb of Chicago.
3.56 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
3.63 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
3.92 miles CenturyLink: Arlington Heights
4.06 miles CloudHQ: ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
4.15 miles CloudHQ: ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
4.23 miles CloudHQ: ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount Prospect, Illinois.
5.70 miles Complete Source Schaumburg
5.93 miles T5: Chicago lll
T5@Chicago III will be build-to-suit, with the company spending more than $500 million to develop a three-story, 250,000 sq ft facility for multi-tenant or single-tenant operations.
6.39 miles Park OneInterested in this information?Contact us
6.51 miles Iron Mountain Chicago
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
6.78 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
6.89 miles Aligned: ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
6.91 miles Aligned: ORD-02
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
7.38 miles Colocation America CH3
7.38 miles DataBank ORD3 Mount Prospect
7.68 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago market, situated at 1331 E Business Center Drive. This facility is a retrofitted structure, encompassing 32,000 square feet of space.
7.85 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in Chicago, Illinois.
8.45 miles Digital Realty: ORD15
In 2017, Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
8.56 miles Digital Realty: ORD12
8.59 miles Digital Realty: ORD14
8.59 miles Digital Realty: ORD13
8.67 miles Tierpoint Chicago West
8.69 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025, for a total of approximately $18 million.
9.08 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.09 miles GlobalInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.10 miles Point AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.16 miles Station GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.73 miles Digital Fortress: Chicago Lombard
9.73 miles 360TCS-Lombard
9.75 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
10.29 miles LexusNexis Oak Brook
10.29 miles DataBank (ORD4) Oak Brook
10.29 miles Verizon: Swift Dr
10.42 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
10.42 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
10.42 miles Verizon: (Oak Brook)
10.47 miles NYI Chicago (Oak Brook)
11.54 miles Karis: Hoffman Estates Campus
Karis Critical and site owner Hoffman Estates Holdings officially withdrew their rezoning application for the proposed data center project in Hoffman Estates, Illinois, in June 2026, putting all active approvals on hold.
11.96 miles Lumen Broadview
12.31 miles Equinix Chicago CH7
Equinix CH7 is a single-story colocation data center at 111 Plaza Drive in Westmont, Illinois, built in 1999 and acquired from Verizon, where it was ORD1, in 2017.
12.67 miles Compass Hoffman Estates
Located in Cook County, the campus will feature five buildings and represents a total planned investment of $10 billion.
13.30 miles CloudCenters: Lisle, IL
The Cloud Centers data center project aims to transform the 18 acre former Lockformer superfund site in Lisle, Illinois, into a two story, 256,000 square foot facility.
13.67 miles Karis: Naperville, IL
The Naperville City Council officially denied Karis Critical’s proposal for a "boutique data center campus" at 1960 Lucent Lane in January 2026.
13.68 miles WhiteRose: South Elgin, IL
Whiterose Partners LLC is proposing a 200,000-square-foot data center on nine acres in South Elgin, Illinois, located roughly 40 miles west of Chicago.
13.70 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
14.02 miles Brennan Investment: Barrington, IL
The Brennan Investment Group has officially withdrawn its ambitious plans for a $2 billion data center project in Barrington Hills, a village located roughly 40 miles northwest of Chicago, Illinois.
14.09 miles Colovore: West Chicago ORD02
ORD02 is Colovore's second Chicago-area facility, located in West Chicago and extending the company's distributed footprint across the metro. The liquid-cooled, HVDC-ready site is under construction and pre-leasing for edge AI and high-performance colocation workloads.
14.44 miles Karis: Naperville (INEOS)
Real estate developer Karis Critical is in early-stage exploratory discussions to potentially acquire the 168-acre former BP/INEOS campus at in Naperville, Illinois, within the Suburban Chicago market.
14.69 miles Cogent Naperville
14.79 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
15.73 miles NetSource Chicago
16.31 miles Hut 8: Batavia, IL
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby Batavia, Kane County.
16.97 miles MicroLink: Chicago, IL
MicroLink is planning to build a data center in Chicago, Illinois.
17.48 miles Edged Energy: Aurora ORD01
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
17.65 miles Edged Energy: Chicago ORD02
The new data center campus, Aurora TechPark, will offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
17.70 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
17.88 miles CyrusOne: CHI3 DC1
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
17.99 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in Aurora, Illinois, a project that will also include the construction of three 350-foot telecommunication towers.
18.08 miles CyrusOne: Aurora CME (CHI1)
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
18.09 miles DataCanopy: Chicago, IL
18.11 miles CyrusOne: CHI2 DC1
The CyrusOne CHI2 data center is located on 16 acres, 45 minutes southwest of Chicago O'Hare International Airport.
18.15 miles Summit: Naperville
18.29 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl Road, Aurora, IL.
18.54 miles US Signal: IL02 Aurora
US Signal's Aurora, Illinois data center at 4267 Meridian Parkway in the Meridian Business Campus, acquired in December 2025. The 70,000 sq ft facility carries about 33,000 sq ft of white space and is being upgraded in phases with new UPS, cooling and generator capacity, with liquid-cooled high-density space planned. It connects to US Signal's Oak Brook site and national fiber backbone and hosts the company's OpenCloud platform.
18.54 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
18.54 miles Colovore: ORD04
Colovore's fourth Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus, adjacent to the company's ORD01 site. Two-hall design with service dates in late 2028 and early 2029.
18.55 miles DataBridge: Aurora, IL
DataBridge Sites is the new name for ESite Systems, a company with two decades of history in the industry.
18.61 miles Colovore: ORD03
Colovore's third Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Two-hall design with service dates in 2028.
18.70 miles Colovore: ORD01
Colovore's first Chicago-area facility, a purpose-built liquid-cooled colocation building in Aurora's Meridian Business Campus. Single data hall slated for service in late 2026.
19.04 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in Chicago, Illinois.
19.08 miles H5: Chicago
19.53 miles Lumen Chicago 2
19.63 miles Lumen Chicago 4
19.96 miles QTS: CHI1 DC3
QTS plans to build another data center building on its Chicago Campus.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read NTT to Develop 200MW Data Center Campus Near Tokyo
NTT to Develop 200MW Data Center Campus Near Tokyo

NTT to Develop 200MW Data Center Campus Near Tokyo

April 21, 2026 NTT

Japanese technology giant NTT has announced plans for a new data center outside Tokyo. NTT Data this week said that work has begun on a new data center development in the Inzai–Shiroi area of Chiba Prefecture, outside Tokyo.The facility is being developed through NTT Global Data Centers (NTT...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?