5.23 miles
|
KDDI: Sakai, Osaka
|
KDDI has launched an AI data center at the former Sharp Sakai factory site in Osaka Prefecture.
|
|
5.27 miles
|
Softbank: Sakai, Osaka
|
The planned facility will have a total floor area of 750,000 square meters, utilizing about 60% of the Sharp Sakai Plant's total land area of approximately 440,000 square meters.
|
|
7.29 miles
|
Mapletree: Osaka
|
The multi-story facility is built on a 4,200 sqm site and offers 13,330 sqm of total space, including 12,720 sqm of lettable area. The property comes with a 70-year land lease that began October 1, 2020.
|
|
7.44 miles
|
SC Zeus: Osaka 2
|
This facility is part of SC Zeus' Project Zeus OSA1 campus in Osaka.
|
|
7.45 miles
|
SC Zeus: Osaka Campus
|
SC Zeus, a leader in sustainable data center solutions, is developing Project ZEUS OSA 1 in Osaka, a campus that will comprise two buildings.
|
|
7.58 miles
|
ESR Group: OS2
|
This facility is part of ESR Group's Cosmosquare campus in Osaka.
|
|
7.59 miles
|
CloudHQ: KIX2
|
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
|
|
7.60 miles
|
ESR Group: Cosmosquare OS1
|
The newly completed data center is the first hyperscale facility within ESR's Cosmosquare campus. At full build-out, the US$2 billion campus will comprise three buildings.
|
|
7.61 miles
|
CloudHQ: Cosmosquare KIX1
|
Strategically positioned in Nanko Kita, Osaka City, CloudHQ's Cosmosquare is a future-proof, three-phase hyperscale data center campus (KIX1, KIX2, KIX3).
|
|
7.62 miles
|
CloudHQ: KIX3
|
This facility is part of CloudHQ's Cosmosquare campus in Osaka.
|
|
7.62 miles
|
NTT Osaka OS4
|
|
|
7.64 miles
|
ESR Group: OS3
|
This facility is part of ESR Group's Cosmosquare campus in Osaka.
|
|
7.92 miles
|
INAP Osaka
|
|
|
7.93 miles
|
Optage: Shinsaibashi
|
The Shinsaibashi Data Center in central Osaka was launched in 2008. OPTAGE will establish a new connectivity area “Shinsaibashi POP (Point Of Presence)” within the existing Shinsaibashi Data Center in Osaka City By 2025.
|
|
7.93 miles
|
Telehouse: Osaka Shinsaibashi
|
KDDI Telehouse operates a colocation data center in Shinsaibashi, Japan.
|
|
7.93 miles
|
Hyperscale Data Center
Request Dataset
|
|
|
7.94 miles
|
Equinix Osaka OS1
|
Opened in 2013, the first phase, with room for 320 cabinets is a US$12m investment. Once fully opened the site will carry 800 cabinets.
|
|
7.97 miles
|
Optage: Shinmachi
|
|
|
8.40 miles
|
NTT Osaka 5
|
|
|
8.43 miles
|
Empyrion: Osaka JP2
|
|
|
8.43 miles
|
AirTrunk: Osaka OSK2
|
AirTrunk’s newly announced OSK2 project is a massive hyperscale development located in East Osaka, designed specifically to meet the surging demand for cloud and artificial intelligence (AI) infrastructure in the Kansai region.
|
|
8.43 miles
|
AirTrunk: OSK2 Expansion
|
|
|
9.08 miles
|
Telehouse: Osaka 2
|
Built as the major Telehouse Data Center for the west of Japan, The Osaka 2 Data Center facility began service on 21st August, 2015.
|
|
9.08 miles
|
NTT OS2 (Telepark Dojima Building 2)
|
|
|
9.09 miles
|
Equinix Osaka OS3
|
|
|
9.11 miles
|
Digital Edge: Osaka OSA1
|
|
|
9.12 miles
|
Equinix: OS4x
|
Equinix's fourth data center in Osaka, Japan, is connected to the adjacent OS2x in Minoh City, Osaka Prefecture. The facility has 4,925 square meters (53,025 square feet) of data center space.
|
|
9.12 miles
|
Equinix: OS5x
|
|
|
9.25 miles
|
NTT OS3 (Telepark Dojima Building 3)
|
|
|
9.31 miles
|
NTT Data Osaka Dojima (Building #4)
|
|
|
9.32 miles
|
NTT: Osaka North 1(OSK12)
|
NTT Global Data Centers has officially broken ground on its Osaka North 1 (OSK12) data center in Ibaraki City, marking a significant expansion into one of Japan’s fastest-growing digital hubs.
|
|
9.54 miles
|
Optage: Sonezaki
|
Named 'Optage Sonezaki Data Center,' the 14-story carrier-neutral facility will offer 24,100 square feet (2,250 square meters) of space and incorporate seismic isolation design for earthquake protection.
|
|
10.26 miles
|
MC Digital Osaka 3 (KIX12)
|
|
|
10.52 miles
|
Telehouse: Osaka Umeda
|
KDDI Telehouse operates a colocation data center in Umeda, Osaka.
|
|
10.53 miles
|
Optage: Umeda North
|
This state-of-the-art data center began operations in 2012. The facility encompasses 11,534 square meters of gross floor area, with 4,000 square meters dedicated to colocation space containing 1,300 racks.
|
|
11.17 miles
|
Goldman Sachs: Higashiosaka
|
Goldman Sachs acquired land to build a data centre in Daito, Higashiosaka.
|
|
12.53 miles
|
AirTrunk: Osaka OSK1
|
Located in West Osaka, the development consists of a 16,500sqm facility dedicated to high-scale cloud requirements.
|
|
13.90 miles
|
IDC Frontier: Osaka Suita
|
|
|
16.74 miles
|
ADA: Osaka East 1
|
GLP's data center subsidiary, Ada Infrastructure, plans to build a four-story data center in East Osaka, Japan. The site will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
|
|
17.07 miles
|
IIF Osaka Toyonaka
|
The IIF Osaka Toyonaka Data Center facility, constructed in September 1991, stands on a 4,769.70-square-meter plot of land. The building features a total floor area of 20,027.14 square meters.
|
|
18.83 miles
|
NTT Keihanna OSK11
|
|
|
18.86 miles
|
ESR Group: Minoh, Osaka
|
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
|
|
18.86 miles
|
Colt: Minoh, Osaka
|
ESR Group and Colt Data Centre Services (Colt DCS) have formed a joint venture to develop the initial phase of a hyperscale data center in Minoh City, Osaka, Japan.
|
|
18.86 miles
|
Colt: Minoh 2
|
This facility is part of Colt's Minoh Campus in Osaka, Japan.
|
|
18.88 miles
|
STACK: KIX01C
|
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
|
|
18.88 miles
|
STACK Osaka KIX01
|
Located in Osaka’s eastern suburb of Keihanna, this data center campus will comprise three buildings with robust access to power and network to ensure strong reliability.
|
|
18.88 miles
|
ESR Group: Keihanna OS4
|
ESR Group and STACK Infrastructure, major players in APAC's New Economy real estate and global digital infrastructure, are jointly building a new data center campus in Keihanna, Japan (Kansai region).
|
|
18.92 miles
|
STACK: KIX01B
|
This facility is a part of Stack's KIX01 Campus in Osaka, Japan.
|
|
19.00 miles
|
Colt Osaka Keihanna
|
|
|
19.62 miles
|
NTT Osaka 7
|
|
|
19.89 miles
|
NTT: Nishiai
|
NTT acquired eight acres in Osaka Nishiai to develop two data centers, with the first facility expected to open in fiscal year 2027.
|
|
19.93 miles
|
Kagoya: Keihanna Lab B
|
The facility Lab B is a four-story building located on Kagoya's Keihanna Campus in Kyoto, Japan. It covers an area of 3275.29 square meters (including corridors) and has a capacity of 400 racks.
|
|
19.95 miles
|
Kagoya: Keihanna Lab A
|
The data center's first three-story Building A was built in 2006, with a four-story Building B added in 2014. Currently, the two are connected by a walkway, providing server space for up to 650+ racks.
|