NTT Munich 1

Latest Podcast Ammerthalstraße 10
Operational
Fully operational facility
Operated by:

NTT Munich 1

░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Power:


  • Medium-voltage feed from the European grid via a local power supplier ( 3 x 1,000 kVA transformer station)
  • UPS (n + 1 redundant) bridging time minimum 15 minutes at full load
  • Emergency generators ( 2 x 1,400 kVA) with fuel storage for 48 hours

Security:


  • Connection to the 24/7 Security Command and Control Center of e-shelter security GmbH
  • Central access control with a personal access control system
  • Intruder alarm systems and video cameras for exterior surveillance and building surveillance of the entrances and corridors up to the rental unit

Map and Nearby Locations

Ammerthalstraße 10
NTT Sites
Nearby Facilities

Sites within 15 miles of NTT Munich 1

Distance Site About
1.00 miles noris Munich MUC5
1.12 miles Portus: MUC1
The company acquired this newly developed data center in Munich, which had been developed by SpaceNet AG, a local IT services provider.
1.16 miles Portus: MUC2
European operator Portus Data Centers has announced the expansion of its Munich colocation campus with a new facility, Portus Data Centers Munich 2 (MUC2).
3.03 miles Equinix Munich MU4
4.06 miles NorthC: Munich II
The NorthC Munich II facility, located in Wamslerstrasse, officially joined the NorthC portfolio in September 2025.
7.05 miles NorthC: Munich
In 2021, the NorthC Group acquired the IP Exchange data centers in Munich and Nuremberg.
7.75 miles nLighten: Munich
In February 2023, nLighten acquired the site from Exa Infrastructure.
7.75 miles T-Systems München
7.98 miles M-net: Munich
M-net is building a new colocation data center in northern Munich, targeting a 2028 opening after construction began in mid-2026, aimed primarily at regional small and mid-sized businesses.
8.87 miles Equinix Munich MU1, MU3
8.87 miles Level3 Munich (Seidlstraße)
10.23 miles EdgeConnex Munich
Edgeconnex acquired the facility from Vodafone in January of 2019.
10.25 miles Vodafone Munich 2
10.36 miles euNetworks Munich 2
10.47 miles euNetworks Munich 1
11.94 miles DCP: Munich
The site will offer 6,300 square meters (67,810 square feet) of white space across three floors, aiming for a Power Usage Effectiveness (PUE) of 1.2.
12.48 miles PGIM: Munich
In April 2024, PGIM Real Estate acquired a greenfield site in Unterschleißheim, positioned between Munich's city center and Munich Airport.
12.70 miles NTT Munich 2
13.53 miles Max Planck Society: Munich
The Max Planck Society in Germany is building a new data center in Munich after getting approval for a modified plan.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy
[NTT DATA](https://baxtel.com/data-centers/ntt-data) will use Bloom Energy fuel cells as primary power at data centers worldwide under a [900MW agreement](https://www.nttdata.com/en-za/news/2026/nt...

NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy

November 06, 2026 NTT

NTT DATA will use Bloom Energy fuel cells as primary power at data centers worldwide under a 900MW agreement, with first shipments in 2027. The companies announced the agreement on Nov. 5. NTT Global Data Centers, the data center division of NTT DATA, will run the fuel cells as the main source of...

Read more
Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.