NTT: Chennai 2

Latest Podcast Plot no.:08
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

NTT: Chennai 2

Site was first built in 2023 and has expansions through 2027
Floors: 9
Lot Size: 6 acres
░░░░ Request Dataset MW
Operational Power

Located 9km from NTT's Chennai 1 Data Center, our new Chennai 2 Data Center campus will boast two 9-storey buildings. Building A and B will offer a maximum IT load of 17.4MW in each building once fully built out.

Map and Nearby Locations

Plot no.:08 ( Chennai Tiruvallur High Rd, Sai Nagar, Ambattur Industrial Estate )
NTT Sites
Nearby Facilities

NTT: Chennai 2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of NTT: Chennai 2

Distance Site About
0.14 miles Iron Mountain: CHN-1
Two data centers with eight data halls each will offer nearly 800,000 square feet of AI-ready space, with on-site access to Tier 1 carriers and other connectivity and service providers.
0.14 miles Iron Mountain: CHN-2
This facility will be part of Iron Mountain's Chennai Campus in India.
0.53 miles CtrlS: Chennai DC2
Chennai DC 2, the second building on CtrlS's Chennai Campus, is located in the Ambattur industrial area and spans 290,000 sq ft (26,900 sqm).
0.55 miles CtrlS: Chennai DC3
Chennai DC3 is the planned third building on CtrlS's Chennai Datacenter Park in Ambattur, a multi-floor tower with roughly 8,000 to 9,000 sq ft per floor and a dedicated on-premises substation.
0.56 miles CtrlS: Chennai DC1
The CtrlS Chennai Datacenter Park comprises two buildings spanning a total of 1 million square feet (92,900 sqm).
0.61 miles Digital Connexion: Chennai
Digital Connexion's first greenfield data center in India, MAA10, located in Chennai's Ambattur Industrial Estate, serves as a strategic connectivity hub for Southeast Asia.
0.63 miles Colt: Chennai 1
Colt Data Centre Services has secured a 10-acre plot in Chennai for data center development.
0.67 miles Colt: CHE1 DC2
This planned facility is part of Colt's Chennai Campus in India.
0.85 miles CapitaLand: Chennai 01
The company aims to build out the site in multiple phases; when completed, it will have space for 4,900 racks across 420,000 sq ft and seven stories.
1.91 miles STT Chennai 4
STT Chennai 4 is the third building on STT GDC India's STT Chennai Ambattur Campus. It broke ground in February 2026 with an e-inauguration by Tamil Nadu's Chief Minister.
2.00 miles STT Chennai 3
STT Chennai 3 is the second building on STT GDC India's STT Chennai Ambattur Campus on Ambattur Red Hills Road, Chennai. It is operational alongside STT Chennai 2.
2.14 miles STT Chennai 2
STT Chennai 2 is the first building on STT GDC India's STT Chennai Ambattur Campus in Kallikuppam, Ambattur, Chennai. It opened in 2010 and is LEED Gold certified.
3.42 miles NTT Chennai DC1
4.81 miles Princeton PDG CH1
Princeton Digital Group is planning to build a data center campus in the Northern Chennai Metropolitan Area on a 9.3-acre site.
6.24 miles Net4 Chennai
6.79 miles Ishan Technologies: Chennai
7.92 miles STT Chennai 1
8.96 miles Nxtra: Chennai III
Nxtra Chennai III is located in Santhome, Chennai and capable of housing 250 racks.
9.46 miles Sify: Chennai 01
Sify's first data center in Chennai, which is also India's first purpose-built data center, has capacity for over 800 racks.
19.00 miles Nxtra Data Chennai
19.08 miles Sify: Chennai 2C
This data center is a part of Sify's Chennai 02 Campus in India.
19.11 miles Sify: Chennai 2B
Sify's Chennai 02 Campus launched its first facility, Tower B, in 2024.
19.14 miles STT Chennai 7
STT GDC India has launched its STT Chennai 7 data center at SIPCOT IT Park, Siruseri, Chennai, delivering an initial 7.2MW phase within a planned 45MW AI-ready campus. The facility became operational in February 2026, with further phased expansion underway, while the company targets a potential IPO in H1 2027 to support continued growth.
19.14 miles Sify: Chennai 02
Sify’s Chennai 02 campus is strategically located close to business parks to serve the nearby IT hubs and is well-connected via railways, airways, and the road transport systems.
19.42 miles Techno Digital: Chennai
Techno Digital's inaugural data center is located in Sipcot IT Park, Siruseri, south of Chennai, Tamil Nadu's capital.
19.57 miles Nxtra Chennai II
Nxtra Chennai II is a hyperscale data center campus in the SIPCOT IT Park at Siruseri, the dedicated IT and ITeS zone on Chennai's southern corridor.
19.68 miles Vodafone Chennai
19.69 miles AdaniConneX: Chennai 1 Bldg1
The site is located in SIPCOT IT Park.
19.70 miles AdaniConneX: Chennai 1 Bldg2
Building 2 of AdaniConneX's Chennai 1 campus in the SIPCOT IT Park at Siruseri, south Chennai. It completes the second phase of a G+6 steel building that shares a central core with the live Building 1.
19.78 miles Equinix CN1

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy
[NTT DATA](https://baxtel.com/data-centers/ntt-data) will use Bloom Energy fuel cells as primary power at data centers worldwide under a [900MW agreement](https://www.nttdata.com/en-za/news/2026/nt...

NTT Global Data Centers Signs 900MW Fuel Cell Deal With Bloom Energy

November 06, 2026 NTT

NTT DATA will use Bloom Energy fuel cells as primary power at data centers worldwide under a 900MW agreement, with first shipments in 2027. The companies announced the agreement on Nov. 5. NTT Global Data Centers, the data center division of NTT DATA, will run the fuel cells as the main source of...

Read more
Read NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia
[NTT DATA](https://www.nttdata.com/en-us/news/2026/ntt-data-opens-jakarta-data-center) opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakar...

NTT Opens 12MW Jakarta 2 Annex Data Center in Indonesia

November 03, 2026 NTT

NTT DATA opened its new Jakarta data center on Nov. 3, adding 12MW of IT capacity at its existing campus in South Jakarta. The facility, the Jakarta 2 Annex Data Center, is known as JKT2A and sits inside NTT DATA's Jakarta campus. JKT2A extends the JKT2 campus, which hosts more than 240...

Read more
Read L&T's Vyoma.AI Breaks Ground on 52MW Chennai Data Center
L&T's Vyoma.AI broke ground on a 52 MW data center near Chennai on October 28, expanding its Kancheepuram campus. Vyoma.AI is the integrated AI cloud and hyperscale data center business![thehindubu...

L&T's Vyoma.AI Breaks Ground on 52MW Chennai Data Center

October 31, 2026 L&T-Cloudfiniti

L&T's Vyoma.AI broke ground on a 52 MW data center near Chennai on October 28, expanding its Kancheepuram campus. Vyoma.AI is the integrated AI cloud and hyperscale data center business of Larsen & Toubro, and it marked the start of construction with a Bhoomi Pujan ceremony (L&T)....

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.