NTT TK4

Latest Podcast 2-9-8 Saga
Operational
Fully operational facility
Operated by:

NTT TK4

Map and Nearby Locations

2-9-8 Saga ( Koto-ku )
NTT Sites
Nearby Facilities

Sites within 15 miles of NTT TK4

Distance Site About
0.54 miles NTT TK3
0.96 miles Digital Edge: Comspace I (TY02)
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
1.32 miles NTT: Tokyo TKY12
NTT Global Data Centers is developing the TKY12 hyperscale data center campus in the Inzai–Shiroi area of Chiba Prefecture outside Tokyo, Japan.
1.42 miles Empyrion: Tokyo JP1
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
1.45 miles INAP Koto-ku
1.48 miles NTT DATA Otemachi
1.50 miles Colt Shiohama
1.52 miles Marunouchi: Otemachi II
1.53 miles NTT TK1
1.58 miles Marunouchi
1.63 miles Colt Ōtemachi
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
1.64 miles Equinix Tokyo TY3
1.64 miles Equinix Tokyo TY4
1.69 miles NTT Tokyo Otemachi Building
1.69 miles KDDI Tokyo Otemachi
1.73 miles Flow Digital: Tokyo TK7
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
1.75 miles Equinix Tokyo TY5
1.76 miles Marunouchi: Otemachi I
1.77 miles Flow Digital: TK8
This facility will be part of Flow Digital's Tokyo Data Center Campus.
1.88 miles NTT TK12
2.08 miles TISI: Tokyo 1st DC
TISI data center space in Toyosu, Koto Ward, Tokyo, marketed as Tokyo 1st DC.
2.08 miles NTT TK9
2.09 miles @Tokyo Chuo Center (CC1 & CC2)
2.13 miles SKYY: Koto City
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
2.18 miles NTT TK2
2.25 miles NTT Tokyo 5
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
2.26 miles SoftBank: Tokyo Nihombashi
SoftBank interconnection data center near Tokyo's Otemachi and Marunouchi business districts.
2.64 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
2.70 miles Equinix Tokyo TY11
2.96 miles Digital Edge: Otemachi TYO2
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
3.05 miles NEXTDC: TK1 Tokyo
NEXTDC are poised to expand their leading design, construction and operations of data facilities into Tokyo, Japan.
3.16 miles SoftBank: Tokyo Ariake
SoftBank data center in the Ariake Park Building in Tokyo Waterfront City, a district built for disaster resilience.
3.16 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.17 miles ESR Group: Ariake
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
3.37 miles Equinix Tokyo TY10
3.39 miles Colt KVH Tokyo
3.43 miles Equinix Tokyo TY9
4.24 miles Digital Edge: Tokyo TY01
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
4.30 miles Telecom Center Building
4.33 miles Equinix TY15
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
4.44 miles NTT TK6
4.58 miles OneInterested in this information?Contact us
4.59 miles Equinix Tokyo TY6
4.64 miles Equinix Tokyo TY7
4.66 miles INAP Edogawa-ku
4.69 miles Equinix Tokyo TY8
4.92 miles Equinix Tokyo TY2
5.05 miles Digital Edge: Comspace II (TY03)
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links.
5.07 miles TISI: Tokyo 4th DC (GDC Gotenyama)
TISI's dedicated data center building in Kita-Shinagawa, Tokyo, opened in 2011 as GDC Gotenyama and now marketed as Tokyo 4th DC under the EINS WAVE brand.
5.07 miles SoftBank: Tokyo No. 5
SoftBank data center on leased floors of the Gotenyama SH Building in Kita-Shinagawa, Tokyo, in service since 2013.
5.12 miles AT&T Tokyo NRT4
5.12 miles Digital Edge: Shibuya (SDC)
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
5.19 miles Digital Edge: TY07
The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).
5.88 miles Telehouse: Tokyo Shibuya
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
6.03 miles SoftBank: Tokyo No. 2
SoftBank data center in Toshima Ward, Tokyo, in service since 2001.
7.35 miles Deft: Tokyo TY1
7.48 miles Equinix Tokyo TY1
7.48 miles INAP Heiwajima Ota-ku
7.99 miles AT TOKYO Central Tokyo
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
7.99 miles NTT Tokyo No 11
8.01 miles Keppel DC: Tokyo 1
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
12.40 miles NTT DATA Mitaka East (TK10)
12.55 miles NTT Mitaka West
12.71 miles TISI: Tokyo 2nd DC (Mitaka)
TISI data center space inside MC Digital Realty's Mitaka campus in western Tokyo, opened in 2015.
12.79 miles MCC Mitaka: South Block
12.81 miles MCC Mitaka: North Block
13.61 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
13.68 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
14.35 miles NTT Yokohama 1
14.52 miles Canon Nishi-Tokyo
14.55 miles NTT TK8
14.70 miles West PointInterested in this information?Contact us
15.59 miles ESR Group: Higashikurume
The company acquired a site in Higashikurume, Tokyo, which previously housed three office buildings across 20,900 square meters (225,000 square feet).
16.44 miles ADA: Tokyo East 2
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, consisting of six four-story data center buildings. The campus will feature an N+1 UPS distributed redundant and N+1 closed loop air-cooled chiller plant.
16.47 miles Digital Edge: Yokohama TY06
The TY06 (YCC North) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
16.52 miles Digital Edge: Yokohama TY04
Digital Edge's Yokohama Computer Center (YCC) is situated in Tsuzuki-ku, Yokohama, approximately 5.5 miles (9 kilometers) inland from Tokyo Bay. The campus comprises three buildings.
16.58 miles Digital Edge: Yokohama TY05
The TY05 (YCC East) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
16.76 miles NTT: Shiroi SHR1
The first data center on the campus, the Shiroi Data Center (SHR1) is expected to be completed by April 2027. The building will support AI, cloud computing, and the next generation of digital services.
16.84 miles Mitsui: Kanagawa
Mitsui & Co., a Japanese conglomerate, invested ¥18 billion (approximately $121 million) to acquire a hyperscale data center.
17.27 miles SoftBank: Kanagawa Yokohama
18.09 miles SoftBank: Tokyo Fuchu
Seismically isolated SoftBank data center in Fuchu, western Tokyo, with about 4,000 racks across 25 server rooms.
18.10 miles DayOne: Fuchu Intelligent Park
The plots cover a total area of 10,970 square meters (118,080 square feet), and the first phase is scheduled to begin operations in late 2026.
18.13 miles Telehouse: Tokyo Fuchu
The Telehouse Fuchu data center features earthquake-resistant construction on solid ground.
18.24 miles I-NET: Annex, Tokyo
The I-NET Annex is a high-density, carrier-neutral facility in Yokohama designed to support AI processing and hybrid cloud environments.
19.06 miles IIJ: Shiroi Bldg 2
This facility, located within Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus in Chiba Prefecture, provides space for 1,100 racks across 8,000 square meters (86,110 sq ft).
19.10 miles IIJ: Shiroi Bldg 3
Dubbed "Phase 3," this expansion will add about 1,000 racks to Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
19.10 miles IIJ: Shiroi Bldg 4
This facility will be part of Internet Initiative Japan Inc. (IIJ)'s Shiroi Campus.
19.12 miles IIJ: Shiroi Bldg 1
Japanese internet and data center company IIJ is expanding its Shiroi data center campus, situated east of Tokyo in Shiroi City, Chiba Prefecture.
19.28 miles RHAELM: Chiba Campus
The Chiba AI data center campus, developed under a partnership between JERA, Dell Technologies, and Rhaelm, is a behind-the-meter AI infrastructure project planned at JERA’s Chiba Thermal Power Station.
19.31 miles ADA: TKE1 Bldg1
GLP's data center subsidiary, Ada Infrastructure, plans to build a data center campus in East Tokyo, Japan, consisting of three four-story data center buildings.
19.35 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.41 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.73 miles Mapletree: Tama-shi
Mapletree Industrial Trust has acquired a 98.47 percent stake in a Tokyo mixed-use property through a JPY14.5 billion ($99.5 million) deal with Nagayama Tokutei Mokuteki Kaisha.

Operating Company

Operated by:

Global Data Centers is a division of NTT DATA. The company is one of the largest in the data center providers in the world, spanning more than 20 countries and regions, including the Americas, Asia Pacific, EMEA and India. NTT is routinely recognized as a Leader by leading networking and data center analysts.

As a neutral operator, NTT offers access to multiple cloud providers, a large variety of internet exchanges and telecommunication network providers including our own IPv6-compliant Tier 1 Global IP Network.

0
Facilities
0
Markets

News See all

Read STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus
STTGDC has [secured a JPY93 billion green loan](https://www.sttgdc.com/newsroom/sttgdc-secures-jpy93-billion-green-loan-support-expansion-tokyo-data-centre-campus) to fit out the two buildings at i...

STTGDC Secures JPY93 Billion Green Loan For 70.8MW Tokyo Campus

October 27, 2026 ST Telemedia Global Data Centres (STT GDC)

STTGDC has secured a JPY93 billion green loan to fit out the two buildings at its 70.8MW data center campus in Inzai City, near Tokyo. The facility is worth about US$589.9 million, STTGDC said on Oct. 27. STTGDC develops, owns and operates both buildings. The company calls them TYO1 and TYO2, and...

Read more
Read NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center
NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory M...

NTT Installs Nvidia GPU Test Cluster at Munich 2 Data Center

October 15, 2026 NTT

NTT Global Data Centres has deployed an Nvidia GPU cluster at its Munich 2 data center, allowing clients to test AI applications at scale before committing to wider deployments. Dubbed AI Factory Munich, the cluster lets customers assess AI workloads against real-world infrastructure, security,...

Read more
Read NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka
NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project coul...

NTT Data Nears $6.3B, 500MW Data Center Deal For Anthropic In Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka Prefecture for Anthropic, in what would be the U.S. AI developer's first dedicated facility in Japan. The project could draw up to 500 MW and cost as much as ¥1 trillion, about $6.3 billion, Nikkei Asia reported on...

Read more
Read NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka
[NTT Data Group](https://baxtel.com/data-centers/ntt) is in the final stages of talks to build a data center in [Osaka](https://baxtel.com/regions/osaka) for [Anthropic](https://baxtel.com/data-cen...

NTT Data in Final Talks for 500MW, $6.3B Anthropic Data Center in Osaka

October 13, 2026 NTT

NTT Data Group is in the final stages of talks to build a data center in Osaka for Anthropic, Nikkei reported Tuesday. Construction could cost up to 1 trillion yen ($6.3 billion), and the site would draw as much as 500 MW of power, among the largest intakes of any facility in the country. The...

Read more
Read NTT Facilities Creates Modular Design for Hyperscale Data Centers
NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units...

NTT Facilities Creates Modular Design for Hyperscale Data Centers

July 03, 2026 NTT

NTT’s Facilities division says it has developed a prefabricated construction method, Hyper Ready Module, designed to speed up hyperscale data center delivery. The modular system uses prebuilt units that can be transported and assembled on-site, with the company claiming it could reduce delivery...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts