RagingWire Data Centers

Login to Add Favorite Login to Get a Quote

RagingWire is a carrier-neutral data center provider that operates across four regions in the United States. The company got its start in Sacramento and has since expanded to Ashburn, Dallas, and Chicago. RagingWire colorfully brands its data centers.

RagingWire and NTT Relationship

RagingWire was a privately held company from it's founding in 2000 until 2014 when NTT Communications, purchased approximately 80% of the shares of RagingWire, and in 2018 purchased the remaining shares. RagingWire continues to be a separate legal entity, 100% owned by NTT. NTT Communications, a unit of NTT Group.

RagingWire Dallas

RagingWire Logo
Parent Company:
Headquarters:
Sacramento, California
Stock:
: NTT Communications owns RagingWire
Year Founded:
2000
CEO:

Douglas Adams

Services:
Retail Colocation (Cabinets, Cages, RU), Wholesale Data Center
Company Type:
Owned by a Carrier, but operates as Carrier-Neutral

Links

Careers:

RagingWire Locations


Show Sites
RagingWire Ashburn VA1/VA2
44664 Guilford Dr
Ashburn, VA 20147
Located in Ashburn: Data Center Alley
  • 290,000 Gross SqFt
  • 28.4 Megawatts

RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.

RagingWire Sacramento Campus CA1, CA2, CA3
1200 Striker Ave
Sacramento, CA 95834
Located in Sacramento
  • 650,000 Gross SqFt
  • 50.9 Megawatts

RagingWire's Sacramento's data center campus is split among 3 buildings (CA1, CA2, and CA3)

RagingWire CA2
1312 Striker Ave
Sacramento, CA 95834
Located in Sacramento
RagingWire CA3
1625 National Dr
Sacramento, CA 95834
Located in Sacramento
RagingWire Ashburn VA3
21583 Megawatt Drive
Ashburn VA 20147
Located in Ashburn: Data Center Alley
  • 245,000 Gross SqFt
  • 16.0 Megawatts

RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.

RagingWire Dallas TX1
2008 Lookout Drive
Garland, TX 75044
Located in Dallas
  • 118,000 Gross SqFt
  • 16.0 Megawatts

RagingWire’s Dallas TX1 Datacenter is a 16 megawatt facility with 230,000 square feet of data center space. TX1 is the first phase of a 42 acre campus that can expand capacity up to 80 megawatts and 1 million sqft spread across 5 interconnected buildings.

RagingWire Chicago CH1
255 Pierce Road
Chicago, IL 60143
Located in Chicago
  • 245,000 SqFt Under Construction
  • 16.0 MWs Under Construction

RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.

Ragingwire Santa Clara SV1
1150 Walsh Ave
Santa Clara, CA 95050
Located in San Francisco Bay Area
  • 160,000 SqFt Under Construction
  • 16.0 MWs Under Construction

The site is currently preleasing and will be available in early 2020.

RagingWire CA1
1200 Striker Ave
Sacramento, CA 95834
Located in Sacramento
NTT Hilsboro HI1
4050 NW Evergreen Rd
Hillsboro, OR 97124
Located in Portland
  • 23,000 SqFt Under Construction
  • 6.0 MWs Under Construction

Photos


150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
Meet Me Room at RagingWire's CA3 facility in Sacramento.
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
The new Santa Clara data center will be ready in 2020.

150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
Layout Diagram of VA1 Building
Posted in RagingWire Ashburn VA1/VA2

150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.

Source: RagingWire
Computer Room Inside VA1
Posted in RagingWire Ashburn VA1/VA2 Source: RagingWire
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
Lobby of VA3
Posted in RagingWire Ashburn VA3

RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.

Source: RagingWire
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
Planned Ashburn Campus Building Layout
Posted in RagingWire Ashburn VA3

The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.

The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
Planned Ashburn Campus Building Layout
Posted in RagingWire Ashburn VA3

The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.

Source: RagingWire
Meet Me Room at RagingWire's CA3 facility in Sacramento.
CA3 Network Infrastructure
Posted in RagingWire Sacramento Campus CA1, CA2, CA3

Meet Me Room at RagingWire's CA3 facility in Sacramento.

Source: RagingWire
CA3 Skywalk Overlooking the Data Floor
Posted in RagingWire Sacramento Campus CA1, CA2, CA3 Source: RagingWire
CA3 Cooling Infrastructure
Posted in RagingWire Sacramento Campus CA1, CA2, CA3 Source: RagingWire
Exterior of VA3
Posted in RagingWire Sacramento Campus CA1, CA2, CA3 Source: RagingWire
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
Ashburn Campus Building Overview
Posted in RagingWire Ashburn VA3

RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.

Source: RagingWire
The new Santa Clara data center will be ready in 2020.
Rendering of SV1
Posted in Ragingwire Santa Clara SV1

The new Santa Clara data center will be ready in 2020.

Source: RagingWire
Rendering of the Base Isolation System
Posted in Ragingwire Santa Clara SV1 Source: RagingWire
Proposed Phased Expansion for TX1
Posted in RagingWire Dallas TX1
Data Floor From Above
Posted in RagingWire Dallas TX1 Source: RagingWire
Phase 1 of RagingWire's Dallas Data Center
Posted in RagingWire Dallas TX1 Source: RagingWire
Rendering of Phase I
Posted in RagingWire Dallas TX1 Source: RagingWire