The company was granted permission for the third of five planned buildings on the site in 2021.
Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.
An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.
With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.
An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.
Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.
Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.
Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.
The company was granted permission for the third of five planned buildings on the site in 2021.
Microsoft is investing $69 million CAD in a new data center campus in Vaughan, Ontario.
Microsoft and Dubai-based AI firm G42 are investing $1 billion to build a geothermal-powered data center in Kenya, with potential capacity reaching 1GW.
This facility is part of Microsoft's YT011 data center campus in Vaughan, Ontario.
Microsoft could be planning its first data center in Romania after buying a plot of land in Otopeni, 15km north of Bucharest.
The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.
This Facility is a part of Microsoft's El mirage Campus in Arizona.
Microsoft's Stackbo GVX21 data center campus is located in Valbo, Sweden.
This facility is part of Microsoft's Stackbo campus located in Valbo, Sweden.
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
This facility is part of Microsoft's Stackbo campus located in Valbo, Sweden.
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
This facility is part of Microsoft's Stackbo campus located in Valbo, Sweden.
This facility is part of Microsoft's Stackbo campus located in Valbo, Sweden.
This facility is part of Microsoft's GVX11 data center campus in Sandviken, Sweden.
This facility is part of Microsoft's GVX11 data center campus in Sandviken, Sweden.
This facility is part of Microsoft's GVX11 data center campus in Sandviken, Sweden.
The Austria East region, consisting of three availability zones in the Greater Vienna / Lower Austria area, went live in August 2025.
The Austria East region, consisting of three availability zones in the Greater Vienna / Lower Austria area, went live in August 2025.
In Elsdorf, Germany, Microsoft plans to build a data center on a 26-hectare site, situated about one kilometer (0.6 miles) south of Heppendorf.
In July 2023, Microsoft gained a permit for a data center at 3655 S.E. Soteria Ave. Issued to Microsoft's contractor, the Weitz Company, the permit was for a 184,600 sq ft facility under the description DSM 14.
The technology giant acquired this property from Australian developer in 2021 for AU$90 million (US$66.8m).
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
Built in July 2009, The 57,000 square foot Redmond Ridge 1 data center is about eight miles from Microsoft's headquarters campus in Redmond.
The site was a cultural shift for Microsoft employees at the time. At the time each development team had their own server labs on the Redmond campus. Today cloud computing is commonplace, but this data center forced the teams to think and develop software in terms of remote computing.
This data center building is a part of Microsoft's Mekaguda Campus in Hyderabad.
In 2023, a permit valued at $358 million was issued for a 245,000-square-foot data center in Microsoft’s Ginger East campus.
This building will be a part of Microsoft Corp.'s Ginger East data center campus.
This planned data center building will be an addition to Microsoft's existing Ginger West Campus.
In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.
Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa.
This planned data center building will be an addition to Microsoft's existing Ginger West Campus.
This data center building is an addition to Microsoft's existing Ginger West Campus.
Microsoft acquired 52 acres in Chandanvelly for Rs 72 crore to establish one of the three data centers announced in 2022 for the Hyderabad cloud region.
Microsoft SAT80-1 and SAT80-2 data centers are located on 206 rural acres at Potranco Road and FM 471 near Castroville.
SAT82 is permitted to start construction in April 2026 and finish in early 2028
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
This data center building, valued at $47.1 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 244,440 square feet and stands 30 feet high. It features 12 restrooms.
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
Microsoft is seeking to rezone a 40-acre parcel southwest of the Cleveland Road and Currant Road intersection.
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
Microsoft is acquiring more land for its data center campus in Palmetto. The facility will be located about two miles northeast of Palmetto, near a Lowe’s warehouse.
A $345 million permit was issued in 2023 for a 250,000-square-foot facility at 5855 S.W. Kerry St. This data center building is the final one for the Osmium Campus.
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
Microsoft is constructing a data center in Kirkkonummi, Finland, as part of a broader initiative to establish a new data center region in Southern Finland, which also includes facilities in Espoo and Vihti.
Microsoft is constructing a data center campus in Vihti, Finland, as part of a broader initiative to establish a new data center region in Southern Finland, which also includes facilities in Espoo and Kirkkonummi.
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
Microsoft put its data center construction plans on hold in New Albany, Heath, and Hebron in April 2025.
Microsoft's first Data Center in Greece is underway, with a €100 million (including VAT) construction contract covering all phases: studies, construction, and commissioning.
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. Microsoft acquired more than 100 acres in a deal spread across two phases; Phase I is the Lojo Property, 72.5 acres at 5375 Malaga Alcoa Highway for which Microsoft paid $6.6 million.
This planned facility will be part of Microsoft's two-building data center campus in the Pimpri Chinchwad Industrial Area of Pune.
Microsoft is looking to build a data center outside Dunkirk in Quaëdypre in Hauts de Flandre, in the Nord department of Northern France. The company wants to build a data center on a 20.5-hectare site.
Microsoft is looking to develop two facilities in the neighboring department of Pas-de-Calais; one outside Calais in Vieille-Église and another further south in Zouafques.
Microsoft revealed plans to build a data center in Busan in 2014, which became operational in 2020.
The Microsoft Tinghøj Campus is a cornerstone of the new "Denmark West" data center region, representing a hyperscale investment designed to meet the soaring demand for AI and cloud services.
Microsoft is constructing a $765 million data center campus in Castroville, featuring two single-story buildings, SAT89 and SAT90.
Microsoft has acquired 377 acres of farmland for $40 million for a data center in Van Meter's Vision Park, Des Moines, Iowa.
Microsoft plans to construct five (5) single-story data center buildings along with associated infrastructure and amenities. The campus plan include a Duke Energy Substation.
The facility is part of Microsoft's Bison Business Park Campus in Cheyenne, Wyoming.
The facility is part of Microsoft's Bison Business Park Campus in Cheyenne, Wyoming.
The facility is part of Microsoft's Bison Business Park Campus in Cheyenne, Wyoming.
This facility is part of Microsoft's Cheyenne Business Parkway Campus in Wyoming.
Microsoft's SAT15 data center is located at 3555 Westover Link in San Antonio’s Bexar County. Microsoft invested $215.9 million for this 245,000 sq ft facility.
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
Commissioned in 2009, the site was Microsoft's first data center outside of the United States.
In February 2024, the West Des Moines Planning and Zoning Commission approved site plans for two new data centers at Microsoft Corp.'s Ginger East campus.
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
Microsoft is expanding its cloud footprint in Texas with a new $400 million data center project in Castroville.
Microsoft is expanding its Irish data center footprint with a new campus in County Kildare, southwest of Dublin.
The Microsoft MWH Data Center Campus, formerly known as the Microsoft Oxford data center, is located at Port Industrial Parkway in Quincy.
Microsoft plans to build a new data center campus in La Puebla de Alfindén to the east of Zaragoza, Spain.
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
Microsoft is constructing a two-building data center campus in the Pimpri Chinchwad Industrial Area of Pune.
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvidia chips.
Microsoft has revealed that it is behind a data center project in Lowell Township, Kent County. The project would see 235 acres developed into a data center campus.
The Wisconsin facility was first announced in March 2023 and is set on a 315-acre parcel.
Microsoft has purchased a 50-hectare plot of land in Middenmeer, north of Amsterdam, for the expansion of its AMS13/14 hyperscale data center campus.
Microsoft will invest an additional €2.9 billion (US$3 billion) to build another data center campus in Zaragoza, adjacent to Puerto Venecia.
Microsoft has officially withdrawn its plans for the "Project Nova" data center in Caledonia, Wisconsin, following significant community opposition.
Microsoft is constructing the Lyle Creek data center campus in North Carolina starting March 2024.
The development of Microsoft's new data center campus in Alcalá de Henares, Madrid, has advanced following the initial approval of the special construction plan by the local government board.
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
In 2025, the Lyon County Planning Commission approved a parcel map for Microsoft, allowing the company to restructure 274 acres of land it owns in Silver Springs, Nevada.
In May 2024, The West Des Moines City Council approved a development agreement with Microsoft for another data center in Des Moines.
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
Microsoft operates a data center in Madrid, Spain, located in San Sebastian de los Reyes.
This data center building, valued at $47.1 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 244,440 square feet and stands 30 feet high. It features 12 restrooms.
Microsoft operates its SAT80-1 and SAT80-2 data centers on 206 rural acres at Potranco Road and FM 471 near Castroville.
Microsoft has acquired 48 acres of land at the Skelton Grange site in Leeds, UK, for £106.6 million ($134.83m) from real estate group Harworth.
Microsoft acquired two tracts totaling 85 acres at 7905 and 8537 Braun Road, Mount Pleasant, for $24.1m from West Road Investments LLC.
Microsoft bought 50.4 acres, at 4912 90th St., from Lake Forest, Illinois-based Espy Farms LLC for $14.3 million.
Microsoft plans to construct an expansive data centre campus in Kosmosdal area of the city, to the south of Pretoria. Microsoft will be the first US cloud provider to enter in South Africa.
Microsoft is looking to develop two facilities in the neighboring department of Pas-de-Calais; one outside Calais in Vieille-Église and another further south in Zouafques.
Microsoft plans to invest €6.69 billion ($7.16bn) in a new data center campus in Spain's northeastern Aragon region.
Microsoft bought about 295 acres in the city of Becker for a future data center.
The first phase of the Ginger East project, which sits on a 146-acre plot east of Veterans Parkway at SE Maffitt Lake Road, consists of a 250,000 sq ft (23,200 sqm) data center building located near the company's existing Alluvion data center.
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
Microsoft’s CPH03 data center in Køge, part of its Denmark East cloud region, with Phase 2 expansion underway (2026–2028) and designed to operate on 100% renewable energy through power purchase agreements.
The two new facilities, DUB14 & DUB15, are located west of the company's DUB9, DUB10, DUB12, and DUB13 data centers on the Microsoft Dublin Grange Castle campus.
Microsoft’s SAT93 data center in Medina County, Texas, is a 245,000 sq ft single-story facility developed alongside SAT94 on County Road 381, with $26M investment, powered by Medina Electric Cooperative, and scheduled for construction from 2027 to 2029.
Microsoft’s SAT94 data center in Medina County, Texas, is a 245,000 sq ft single-story facility developed alongside SAT93 on County Road 381, with a $26m investment and construction scheduled from 2027 to 2029.
Microsoft has acquired 240 additional acres in Wisconsin for data centers, near its Mount Pleasant project that was paused in early 2025.
Microsoft acquired 500 acres of land around Eldamain and Corneils roads from three landowners in Plano, Illinois.
Microsoft is further expanding its data center footprint in Malaysia by acquiring another plot of land in Johor.
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
In 2024, Microsoft acquired a 128-acre property in Dorr Township, Allegan County, located along U.S. 131 at 144th Avenue.
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
Microsoft has expanded its presence in Chicago, Illinois, acquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
Microsoft is building another data center campus near its Boydton site. Microsoft Corporation bought the vacant site where the Mecklenburg Correctional Center was once located at 960 Prison Road.
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
Microsoft plans to build yet another data center SAT16 at its campus at 3555 Westover Link in San Antonio. The project is described as a building shell and fit out associated with 245,000 square foot (22,760 sqm) data center.
Microsoft acquired 300.7 acres from Mark IV Capital within the 4,300-acre Victory Logistics District, a master-planned industrial hub located in Fernley, Nevada.
Microsoft is constructing a data center in Høje-Taastrup, located 25km west of Copenhagen.
A new data center was set to be built near the city of Mulhouse in the Grand Est region of eastern France.
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
Microsoft is building a data center campus at Cheyenne Business Parkway to support its West Central US Azure region. The plan was Announced in 2021.
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
Microsoft plans to build four data centers, with Irving City Council approving separate tax incentives for each facility.
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
This data center building, valued at $55.2 million, is part of the Microsoft East Wenatchee Campus. The one-story building measures 237,337 square feet and stands 30 feet high with 12 restrooms.
This facility is a part of Microsoft's Columbia Data Center Campus.
The Boydton site has strong fiber connectivity from existing routes supporting a government data center in the region.
The SW Kerry Street site, also known as Project Osmium, was announced in 2016 and will span 1.7 million sq ft (158,000 sq m) of land once fully built out.
Microsoft's Cheyenne data center in Wyoming is powered entirely by wind energy.
The CO2 facility is a part of Microsoft's Columbia Data Center Campus.
Microsoft has acquired 123 acres of land in Kulai, Johor, Malaysia for data center development. The plot, located in Eco Business Park VI in Senai, was purchased from EcoWorld's subsidiary for RM402.3 million ($85.2m).
Microsoft is building a data center campus at Bison Business Park to support its West Central US Azure region. The plan was Announced in 2021.
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
Announced in October 2023, the campus in Rome Georgia is known as ‘Project Firecracker' It''s situated on a 347-acre property on Huffaker Road, east of Fouche Gap Road.
Microsoft’s data center in Settala represents the first of three facilities the U.S. tech giant intends to establish in the province. The site was acquired from the AKNO Group.
Microsoft has filed plans to build a campus with three data centers in Malaga, Washington. The development will construct the first building on the site by the end of 2025, with potential for two more buildings by 2027.
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
Microsoft's first data center facility in Denmark is located in the business area at Finervej, 4621 Gadstrup, Roskilde.
The Columbia Data Center is Microsoft's data center facility located in Quincy, Washington. Until 2015, it was reported to be the world's largest data center.
Microsoft is building a datacenter in the Taquara Branca region in São Paulo state.
In 2024, Microsoft acquired a 144-acre property in Dorr Township, Allegan County, located along U.S. 131 at 14th st.
This data center is a part of Amazon's Hillcrest Campus in South Hill, VA.
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
Microsoft is planning to build a new data center on the site of a now-closed Lowe’s store between Islington Avenue and Highway 401 in Toronto, Canada.
Microsoft is developing a two-building data center campus in South Hill, Virginia.
Microsoft plans to build a new data center campus with three buildings on a 259.1-acre site in Mecklenburg County, Virginia, to expand its southern Virginia Regional Network Group.
Microsoft is building a data center on a 41-acre site in Shadnagar, Hyderababd. The company acquired this site for Rs 164 crore in 2022.
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft launched its Brazil South Azure region in 2014, located in Campinas, São Paulo state.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
The facility is part of Microsoft's Bison Business Park Campus in Cheyenne, Wyoming.
Microsoft operates a data center campus in the Hollands Kroon area in the north of the Netherlands, close to its existing facility.
The proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," features two distinct 3-storey buildings including administration zone.
The $1.3 billion campus will see the development of two two-story data center buildings.
This facility will be part of the proposed Microsoft Data Centre campus, also known as the "YTO14 Data Processing Centre," in Ontario, Canada.
DC2 is the second data center building of Microsoft's Station Road Campus. In late 2022, a subsequent application was lodged and approved for a 22-meter-tall data center with 8,076 sqm of gross floor area.
Microsoft has filed plans for a $317 million data center development in Santiago, Chile.
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
Microsoft is constructing a data center in San Bovio, a neighborhood in Peschiera Borromeo, near Milan, Italy.
Microsoft's second data center in Pune is currently under construction in the Bhosari area.
Microsoft's Indian subsidiary, Microsoft Corporation (India) Private Limited, purchased 16.4 acres (66,414.5 sq m) of prime land in Hinjewadi, Pune, for ₹519.72 crore ($62 million).
According to property consultant Square Yards, technology giant Microsoft Corporation (India) purchased around 16 acres (66,450 sq m) of land from Viva Highways in Pune for ₹453 crore.
Microsoft is building a data center campus in Bornasco, which is located in the province of Pavia, Italy.
Microsoft is constructing a 270,605 sq ft data center on a 20-hectare site in Bergheim, located west of Cologne in the Rhein-Erft district.
Microsoft plans to build data center on an 18-hectare site at the new industrial estate in Bedburg, Germany.
Microsoft launched its first hyperscale data center in New Zealand on December 2024.
Microsoft is planning to build a data center at Whenuapai Business Park in Auckland, New Zealand.
Microsoft plans to construct the "Progetto Data Center MIL03" in Settimo Milanese (MI), with Microsoft 4825 Italy S.R.L. as the proponent.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft is developing a large single-story data center next to Vantage's Newport campus in Newport, Wales.
Microsoft is investing $1.8 billion to build a new data center campus in Union City, southwest of Atlanta.
Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa.
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
Microsoft is proposing to develop a new UK data center campus on the site of a decommissioned power station in Eggborough, North Yorkshire. Microsoft aims to build two two-story data centers on part of the former Eggborough power station.
This facility is a part of Microsoft's Columbia Data Center Campus.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft purchased a sprawling 1,385-acre megasite in multiple parcels in North Carolina's Person County for $26.85 million.
Microsoft is building a data center campus in Mekaguda, a village in the southern Indian state of Telangana, which is expected to start operations by 2025.
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
Microsoft is building a data center campus on a 125-acre site located on Ben Hill Road in East Point.
Microsoft plans to invest $700 million to construct two identical single-story facilities in San Antonio, Texas.
The 245,000-square-foot facility, to be located on nearly 489 acres in the Radius Industrial Park
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
Microsoft Corp. is developing data centers on a 120-acre plot in East Wenatchee. The project, known as EAT06 and EAT09, involves the construction of two linked single-story structures with a combined area of 250,530 square feet.
Microsoft paid DRI FR Goodyear LLC $37 million for the 147 acre lot in Goodyear on April 15, 2019.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft is building a new data center campus in the Hollands Kroon area in the north of the Netherlands, close to its existing facility. The campus is located at Cultuurweg 11 in Middenmeer (Het Venster).
Microsoft plans to build a new data center campus in La Muela to the west of Zaragoza, Spain.
Microsoft acquired the property in 2021. In early 2022, Blacktown Council approved the construction of this data center. The tech giant completed the facility in December 2023.
In December 2022, Microsoft was issued a permit valued at $255 million for the fourth building.
This data center building is a part of Microsoft's Chandanvelly Campus in Hyderabad.
Microsoft operates a datacenter near Hortolândia’s Chácaras Recreio Alvorada area in São Paulo state.
Microsoft acquired a 170-acre plot in East Wenatchee in 2020 with plans to build six facilities in the Pangborn area.
Microsoft acquired the 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
The SW Kerry Street site, also known as Project Osmium, was announced in 2016 and will span 1.7 million sq ft (158,000 sq m) of land once fully built out.
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
Microsoft plans to invest $700 million to construct two identical single-story facilities in San Antonio, Texas.
The project, known as EAT06 and EAT09, involves the construction of two linked single-story structures with a combined area of 250,530 square feet.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft has launched its first cloud region in Indonesia, located in West Java.
Microsoft has launched its first cloud region in Indonesia, located in West Java.
Microsoft is constructing a $765 million data center campus in Castroville, featuring two single-story buildings, SAT89 and SAT90.
In late 2020, Microsoft acquired 33.55 acres around the Valero (NYSE: VLO) data center
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft is developing almost 1 million square feet of data center buildings in Douglasville, Georgia, as part of its East US 3 Azure data center region.
In August 2018, Microsoft paid about $48 million for its 279-acre site near the Phoenix Goodyear Airport. The project already has three massive buildings, and Microsoft plans to construct two more buildings on the campus, for a total of five buildings.
Microsoft has filed a rezoning request for a 40.5-acre portion of its 316-acre holding in Gaines Township.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
This facility is a part of Microsoft's MWH Data Center Campus in Quincy.
Microsoft is planning a large-scale data center project in Cherry Valley. The proposed development would consist of six buildings and stretch across farmland from Valley Orchard to Wheeler Road.
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
Microsoft started work on its Boyd Farms data center, located off Zeb Haynes Road in Maiden, a town in Catawba and Lincoln counties.