South ValleyInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, West Des Moines, IA 50266, USA
Operational
Fully operational facility
Operated by:

Microsoft: DSM40

Short Code: DSM40
Year Built: 2023
Lot Size: 188 acres

Sites on this Campus:

  • Valley OneInterested in this information?Contact us
  • Station PrimeInterested in this information?Contact us
  • West HubInterested in this information?Contact us
  • Valley MaxInterested in this information?Contact us
  • StationInterested in this information?Contact us
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Microsoft's Ginger West Campus is located at 11100 Booneville Road in Des Moines. In 2021, Microsoft gained approval for the first two buildings of its Ginger West data center project in West Des Moines, Iowa. Turner Construction Co. is overseeing the construction of the two Ginger West data centers.

  • The first data center building came online in 2023 with 244,676 square feet of space.
  • The Ginger West Project is valued at $374.5 million
  • Ginger West Campus is expected to span around 1.8 million sq ft (167,000 sq m), with Microsoft planning more than $1.65 billion investment over a number of years.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Edge CampusInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of PrimeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Hub BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us Core ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us West HubInterested in this information?Contact us
NN milesInterested in this information?Contact us COPT: Des Moines Expansion
Future phases of COPT Defense Properties' Van Meter data center campus west of Des Moines: up to 14 more 220,000 sq ft powered shells, planned in three phases of five buildings.
NN milesInterested in this information?Contact us COPT: Des Moines DC1
The first planned powered shell on COPT Defense Properties' Van Meter campus west of Des Moines: a 220,000 sq ft building for COPT's Fortune 100 cloud tenant.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

October 22, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more
Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?