Under ConstructionPlanned
Multi-phase construction project

Microsoft: Stover (Hickory NC)

Year Planned: 2027
Lot Size: 158 acres

Microsoft is construct five (5) single-story data center buildings along with associated infrastructure and amenities in Hickory Lincolnton, Hickory, North Carolina. The campus plan include a Duke Energy Substation. Construction work at the project, known as the Stover data center, began in July 2024.

Update: Microsoft's billion-dollar data center plans in North Carolina are slowing down as economic uncertainty grips the tech industry.

Map and Nearby Locations:

This Facility
Microsoft Azure Sites
Nearby Facilities

Sites within 15 miles of Point Alpha

Distance Site About
3.39 miles Hyperscale Data Center Request Dataset
Apple is investing $175 million to expand its existing data center in Maiden. Permits indicate the project will add a 237,600 square-foot facility on land already owned by the company.
3.51 miles Hyperscale Data Center Request Dataset
This approximately 240,000-square-foot data center is part of Apple's Maiden Campus.
3.63 miles Hyperscale Data Center Request Dataset
This data center is part of Apple's Maiden Campus in North Carolina.
3.69 miles Hyperscale Data Center Request Dataset
Apple's North Carolina data center campus spans 183 acres and consists of four buildings totaling approximately 1 million square feet.
3.80 miles Hyperscale Data Center Request Dataset
This small, 21,030 square foot “tactical” data center is a part of Apple's Maiden Data Center Campus.
3.84 miles Hyperscale Data Center Request Dataset
This approximately 240,000-square-foot data center is part of Apple's Maiden Campus.
5.04 miles Hyperscale Data Center Request Dataset
Microsoft started work on its Boyd Farms data center, located off Zeb Haynes Road in Maiden, a town in Catawba and Lincoln counties.
9.90 miles Hyperscale Data Center Request Dataset
Microsoft is constructing the Lyle Creek data center campus in North Carolina starting March 2024.
10.50 miles Data Journey: Claremont, NC
In 2024, Texas-based Data Journey acquired the former Bed Bath & Beyond data center in Claremont, Catawba County, and converted the facility from a purpose-built enterprise data center into a colocation facility. This is the company’s second facility.

Tower One Data Center Photos (See all)

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

351
Facilities
4
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)