TowerInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Irving, TX 75063
Operational
Fully operational facility
Operated by:

Microsoft: Irving (QTS DC3)

Year Built: 2024
Utility Provider: Oncor
Ownership: Microsoft Azure does not own the building.
This site is leased from QTS Data Centers in the QTS Irving DC3 building
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Microsoft occupies DC3, a multi-story data center on QTS Data Centers' Irving campus in Las Colinas. In December 2024 the Irving City Council approved a 10-year, 50 percent tax abatement for Microsoft alongside a separate abatement for QTS's DC3, DC4, DC5 and DC6 buildings. The Microsoft agreement requires 15-year leases on four buildings, two by the end of 2025 and two by the end of 2026, at least 500,000 sq ft occupied by the end of 2026, and at least $200 million of added taxable value by 2027.

Site History

  • December 2024: Irving approves the Microsoft and QTS tax abatements.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Ridge ThreeInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of ParkInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us QTS Irving DC3
DC3 is a multi-story data center on QTS's Irving campus in Las Colinas, occupied by Microsoft, with an on-site substation and diverse campus fiber entrances.
NN milesInterested in this information?Contact us QTS: Irving DC4
DC4 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in 2024 and fitted out for Microsoft in 2025.
NN milesInterested in this information?Contact us EastInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us QTS: Irving DC5
DC5 is a two-story, $180 million data center on QTS's Irving campus in Las Colinas, completed in 2025 and occupied by Microsoft.
NN milesInterested in this information?Contact us Center TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
NN milesInterested in this information?Contact us QTS Irving DC1
QTS's first Dallas-area data center occupies the former Maxim semiconductor plant in Irving, Texas, and holds the campus's DC1 and DC2 data halls.
NN milesInterested in this information?Contact us QTS: Irving DC6
DC6 is a two-story data center on QTS's Irving campus in Las Colinas, finished as a shell in late 2025 and fitted out for Microsoft in 2026.
NN milesInterested in this information?Contact us Hub PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois
The City of Rockford named [Microsoft](https://baxtel.com/data-centers/microsoft-azure) on Nov. 13 as the company evaluating a Monarch Energy-controlled pro![msblogs.thesourcemediaassets.com](/rail...

Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois

November 16, 2026 Microsoft Azure

The City of Rockford named Microsoft on Nov. 13 as the company evaluating a Monarch Energy-controlled property in south Rockford for a data center campus. Microsoft is conducting due diligence on the land and has not submitted a proposal, the city said in its announcement. The land sits along...

Read more
Read Equinix Affiliate Files for $500M DA13 Data Center in Dallas
An affiliate of [Equinix](https://baxtel.com/data-centers/equinix) has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The applicati...

Equinix Affiliate Files for $500M DA13 Data Center in Dallas

November 16, 2026 Equinix

An affiliate of Equinix has filed with the Texas Department of Licensing and Regulation to build DA13, a $500 million data center in Dallas. The application puts a four-story, 372,445-square-foot building at 1520 West Mockingbird Lane, in an industrial area near Love Field, as Data Center...

Read more
Read Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) will buy the entire output of two new solar projects in [Japan](https://baxtel.com/regions/japan) developed by Blueleaf Energy under lon...

Microsoft Signs Two Solar PPAs With Blueleaf For Japan Data Centers

October 29, 2026 Microsoft Azure

Microsoft will buy the entire output of two new solar projects in Japan developed by Blueleaf Energy under long-term power purchase agreements. Macquarie Asset Management, which owns Blueleaf, said in a press release on Oct. 28 that its Energy Markets and Customer Solutions team coordinated both...

Read more
Read Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%
[Microsoft](https://baxtel.com/data-centers/microsoft-azure) is extending the useful life of its data centers and office buildings to 25 years from 15, effective ![blogs.microsoft.com](/rails/activ...

Microsoft Extends Data Center Useful Life To 25 Years As Cloud Revenue Rises 30%

October 29, 2026 Microsoft Azure

Microsoft is extending the useful life of its data centers and office buildings to 25 years from 15, effective this fiscal year. The company reported fiscal first-quarter Microsoft Cloud revenue up 30% on Oct. 28, with Azure revenue up 48%, according to Microsoft's earnings release....

Read more
Read Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site
Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94....

Fireworks Reserves $94.4M Nvidia B300 Capacity at Forum Edge AI Dallas Site

October 26, 2026 Dallas

Fireworks has reserved three years of Nvidia B300 GPU capacity at Forum Edge AI's powered data center in Dallas. The 36-month agreement carries a combined total contract value of approximately $94.4 million, Forum Edge AI said on Oct. 26, reflecting GPU capacity and associated CPU management...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.