Planned
Future facility in planning stage
Operated by:

Microsoft: 3580 FM471 Rd

Year Planned: 2028

Microsoft is expanding its cloud footprint in Texas with a new $400 million data center project in Castroville. Located at Farm to Market Road 471 N, the 195,670 sq ft (18,178 sqm) facility is scheduled to begin construction in August 2026, with completion targeted for mid-2028.

This single-story development joins a growing cluster of Microsoft campuses in the San Antonio area, further solidifying the region’s role as a critical hub for the company's Azure cloud infrastructure.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

MaxInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of ThreeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us East CenterInterested in this information?Contact us
SAT82 is permitted to start construction in April 2026 and finish in early 2028
NN milesInterested in this information?Contact us Metro ValleyInterested in this information?Contact us
Microsoft SAT80-1 and SAT80-2 data centers are located on 206 rural acres at Potranco Road and FM 471 near Castroville.
NN milesInterested in this information?Contact us West HubInterested in this information?Contact us
Microsoft operates its SAT80-1 and SAT80-2 data centers on 206 rural acres at Potranco Road and FM 471 near Castroville.
NN milesInterested in this information?Contact us Prime StationInterested in this information?Contact us
Microsoft’s SAT94 data center in Medina County, Texas, is a 245,000 sq ft single-story facility developed alongside SAT93 on County Road 381, with a $26m investment and construction scheduled from 2027 to 2029.
NN milesInterested in this information?Contact us PlazaInterested in this information?Contact us
Microsoft plans to invest $700 million to construct two identical single-story facilities in San Antonio, Texas.
NN milesInterested in this information?Contact us StationInterested in this information?Contact us
Microsoft plans to invest $700 million to construct two identical single-story facilities in San Antonio, Texas.
NN milesInterested in this information?Contact us Hub PrimeInterested in this information?Contact us
NN milesInterested in this information?Contact us CyrusOne: SAT10
In September 2023, Cyrusone acquired more than 25 acres nearby at 15355 Lambda Drive to construct two data centers, designated SAT10 and SAT11.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Plans 38GW Of Data Center Capacity By 2032
Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with le...

Microsoft Plans 38GW Of Data Center Capacity By 2032

September 11, 2026 Microsoft Azure

Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with leased capacity from third-party providers, including neoclouds such as CoreWeave, Nscale, Lambda,...

Read more
Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?