Latest Podcast Street AddressInterested in this information?Contact us, Mukim Pulai, Johor, Malaysia
Land Bank
Land secured for future development
Operated by:

Microsoft: Mukim Pulai

The tech giant has purchased a 102,558.3 square meter (approximately 1,103,927.3 square feet) parcel in the Mukim of Pulai, located within the Johor Bahru district. This acquisition, intended for a new data center, was confirmed by local property development firm Crescendo Corporation Berhad (CCB), which sold the land to Microsoft for RM132,471,276.00 (Malaysian Ringgit).

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Sites within 15 miles of West CenterInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
NN milesInterested in this information?Contact us NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.
NN milesInterested in this information?Contact us Stack: JHB01B
JHB01B is the second building planned on STACK's JHB01 campus in Iskandar Puteri, Johor, on the east side of the lot beside JHB01A and served by the campus's on-site TNB 275 kV substation.
NN milesInterested in this information?Contact us Stack: JHB01A
JHB01A is the first of two buildings on STACK's JHB01 campus in Iskandar Puteri, Johor: a two-storey data center with a multi-level external electrical yard, beside the campus's on-site TNB 275 kV substation. Construction began in 2025.
NN milesInterested in this information?Contact us AirTrunk Johor Bahru JHB1
AirTrunk officially commenced operations at its JHB1 data center campus in Johor in 2024.
NN milesInterested in this information?Contact us Empyrion: Nusajaya Campus MY1
Empyrion Digital is expanding its pan-Asian footprint with the development of the MY1 campus in Johor, Malaysia.
NN milesInterested in this information?Contact us Digital Hyperspace: Johor
AME Elite, a Malaysian real estate company, has agreed to sell 35 acres of land in i-TechValley to Digital Hyperspace Malaysia SDN BHD for RM210.3 million ($2.5 million).
NN milesInterested in this information?Contact us AirTrunk: Johor JHB2
AirTrunk plans to develop its second cloud and AI-ready data centre in Malaysia, named AirTrunk JHB2 located in Iskandar Puteri, Johor region

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex
Microsoft has ended its agreement to anchor [Nscale](https://baxtel.com/data-centers/nscale)'s Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sov...

Microsoft Exits Nscale's 50MW Loughton Data Center Deal In Essex

October 19, 2026 Nscale

Microsoft has ended its agreement to anchor Nscale's Loughton AI campus in Essex, the 50MW facility that UK ministers promoted as the country's largest sovereign AI data center when it was announced in 2025. The withdrawal, first reported by The Telegraph on Oct. 18, leaves the £2bn project...

Read more
Read Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal
Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with [NiSource](https://www.nisource.c...

Microsoft To Fund 1,100MW Of Indiana Generation Under 20-Year NiSource Deal

October 19, 2026 Microsoft Azure

Microsoft will pay for all the generation and transmission needed to serve its La Porte, Indiana data center campus under a 20-year electric service agreement with NiSource announced Oct. 16. Service starts in 2028. The utility's unregulated affiliate, NiSource Generation Company, will add...

Read more
Read NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power
Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with [NiSource](https://www.nisource.com/news/article/ni...

NiSource And Microsoft Sign 20-Year Deal For 1,100MW Of Indiana Power

October 19, 2026 Microsoft Azure

Microsoft will fund about 1,100 MW of new generation and transmission in northern Indiana and buy the output for 20 years under an agreement with NiSource, the holding company that owns Northern Indiana Public Service Company. Announced Friday, the deal covers the La Porte data center campus...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a joint...

Read more
Read Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa
Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, fo...

Microsoft Acquires 600 Acres for Data Center Development in Woodward, Iowa

October 14, 2026 Microsoft Azure

Microsoft has acquired 600 acres in Woodward, around 30 miles northwest of Des Moines, Iowa, for a potential data center campus. The purchase was disclosed at a residents’ meeting on October 12, four days after the sale closed. The site lies between Highway 141 and Seminole Avenue, but...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?