CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Telangana 501503, India
Operational
Fully operational facility
Operated by:

Microsoft: HYD11

Short Code: Building 1
Year Built: 2026
Lot Size: 52 acres

Sites on this Campus:

░░░░ Request Dataset MW
Total Power

Microsoft acquired 52 acres in Chandanvelly for Rs 72 crore to establish one of the three data centers announced in 2022 for the Hyderabad cloud region.

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Ridge GammaInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of MetroInterested in this information?Contact us

Distance Site About
0.07 miles GammaInterested in this information?Contact us
This data center building is a part of Microsoft's Chandanvelly Campus in Hyderabad.
1.28 miles EdgeInterested in this information?Contact us
This data center is a part of Amazon's Chandanvelly Campus in Hyderabad.
1.37 miles Campus TwoInterested in this information?Contact us
This data center is a part of Amazon's Chandanvelly Campus in Hyderabad.
1.39 miles Cloud CenterInterested in this information?Contact us
This data center is a part of Amazon's Chandanvelly Campus in Hyderabad.
1.46 miles ProInterested in this information?Contact us
In 2022, Amazon Web Services (AWS) launched its Chandanvelly Campus, In Hyderabad. At full buildout the campus will span 66,000 sq m (710,000 sq ft).
2.09 miles CtrlS: Chandan Valley Campus
CtrlS is planning an expansive data center campus in Chandanvelly, Hyderabad. The facility will feature 6 DC buildings housing a total of 5,101 racks and span 1,612,700 square feet.
11.00 miles AdaniConneX Hyderabad
11.00 miles Core RidgeInterested in this information?Contact us
Microsoft is building a data center on a 41-acre site in Shadnagar, Hyderababd. The company acquired this site for Rs 164 crore in 2022.
11.08 miles South TowerInterested in this information?Contact us
11.64 miles Plaza PlusInterested in this information?Contact us
This data center building is a part of Microsoft's Mekaguda Campus in Hyderabad.
13.44 miles UPC Volt: Telangana
UPC Volt, a joint venture between Netherlands-based UPC Renewables and Volt Data Centres, is set to establish a high-performance AI-ready data center in Telangana’s Bharat Future City.
16.03 miles Sify: Hyderabad 1
Sify's first data center in Hyderabad has capacity for 2,400 racks.
16.04 miles CtrlS: Hyderabad DC2
In 2020, CtrlS launched the second Rated-4 data center facility in Hyderabad. This facility houses 720 racks and occupies an area of 82,262 square feet.
17.69 miles CtrlS: Hyderabad DC3
Located in Seismic Zone 2, CtrlS Hyderabad DC3 shields enterprise operations from natural disasters. This facility houses 3500 racks and occupies an area of 130,000 square feet.
18.68 miles Iron Mountain: Hyderabad
Located in the Kondapur region of Hyderabad, the Tier III quality HYD-1 data center spans 120,000 square feet (11,100 sqm).
18.84 miles CtrlS Hyderabad
This facility houses 1,152 racks and occupies an area of 191,749 square feet.
18.87 miles CapitaLand: HYD01
CapitaLand Investment Limited (CLI) HYD01 data center, located in the International Tech Park Hyderabad (ITPH), spans a total floor space of 300,000 sq ft (27,870 sqm).
18.87 miles Nxtra: Hyderabad I
Nxtra by Airtel is building a massive data center campus in Hyderabad, India, situated on a 40-acre plot.
18.97 miles STT Hyderabad 1
19.29 miles Reliance: Hyderabad
Reliance operates a data center in Hyderabad, Telangana.

Prime RidgeInterested in this information?Contact us Data Center Photos See all

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read Microsoft Begins Construction of La Porte Data Center Campus
Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took plac...

Microsoft Begins Construction of La Porte Data Center Campus

June 18, 2026 Microsoft Azure

Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took place on June 17. Smith wrote: "Today we broke ground in La Porte, Indiana, alongside Mayor Tom Dermody,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?