Meta

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

Meta Data Center Map

Meta Locations

In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.

In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.

Meta owns 212 hectares of land at Andrup near Esbjerg for a planned hyperscale data center campus known as Project Ember, but the project has been on hold since 2022 as the company redesigns its data center architecture for AI workloads and awaits grid capacity from Energinet.

The Meta data center in Kuna, Idaho, spans 960,000 square feet, represents an $800 million capital investment, and is part of Meta's global network of 19 data centers, which includes 15 locations within the United States.

When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall

Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

Meta is investing over $1 billion to build a 700,000-square-foot data center in Beaver Dam, Wisconsin, its 30th facility globally.

Project Splitrock, the proposed 1,077-acre Meta-backed data center in Howell Township, was officially withdrawn by developers in December 2025 just hours before a final vote by the Board of Trustees.

Meta, operating through its subsidiary Valoa Networks, is advancing plans for a massive data center campus in the municipality of Ii, located in Finland’s Northern Ostrobothnia region.

Facebook's $750 million datacenter project in Huntsville was previously known by the codename “Starbelt.” The data center is located in the North Huntsville Industrial Park and was expected to launch in 2020, but was delayed until late 2021.

In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.

In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.

Project Domino is planned to include 12 data center buildings along with a dedicated AI-Network facility, providing over 4.6 million square feet of compute infrastructure.

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.

Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

Meta's proposed data center in Zeewolde, Netherlands was permanently cancelled in July 2022 after intense environmental and political opposition led to the project's zoning plan being struck down by the Council of State in September 2023.

Luleå is a small coastal town just south of the Arctic Circle. The facility opened in 2013 and was Facebook's first data center outside the U.S.

Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.

The original plan called for 900,000 sqft data center space and a 70,000 office space. Facebook has since announced an expansion that will bring the complex to 2.6 million square feet. The first data center comes online in 2019.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.

Facebook data center campus in the White Oak Technology Park will use solar power and 100 percent renewable energy.

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.

In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.

Meta will be investing $800 million to develop a data center campus spanning almost 700,000 sq ft (65,030 sqm). The company expects the data center to be operational in 2026.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

Meta opened the first part of its data center in Los Lunas in February 2019. Since then the company has invested nearly $2 billion into building a total of eight buildings on the campus.

The Bowling Green Data Center, a 715,000-square-foot (66,425 sqm) facility, is being built on a 280-acre site in Middleton Township, Wood County.

Meta Data Center Photos (See all)

Facebook Construction in Prineville Circa 2018
Source: KTVZ.com
Construction Photo of the FB Los Lunas Data Center
Source: Santa Fe New Mexian
Construction Photo of the FB Los Lunas Data Center
Source: Santa Fe New Mexian
Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technolog...
The First Two Data Centers Take Shape
Source: VEDP-Virginia Economic Development Partnership

Site work began in February 2018, just five months after the project was announced, thanks to Henrico County’s fast permitting approval program and the development-ready site at White Oak Technology Park.

Facebook's Heat Recovery Project in Denmark
Source: Facebook
A visualization from Cowi shows the proposed data center in Esbjerg. The campus will have four data centers and administration buildings. In total, the center will have fully built 250,000 square m...
Rendering of FB's Proposed Data Center in Esbjerg
Source: Cowi

A visualization from Cowi shows the proposed data center in Esbjerg. The campus will have four data centers and administration buildings. In total, the center will have fully built 250,000 square meters.

A logistics specialist uses a tug to move a server rack in one of the data halls at the newly opened Facebook data center in Los Lunas
Moving In: Facebook Opens the Los Lunas in February 2019
Source: Jim Thompson-Albuquerque Journal

A logistics specialist uses a tug to move a server rack in one of the data halls at the newly opened Facebook data center in Los Lunas

Game Room for Facebook Employees
Source: Baxtel
Facebook Logo in Front of the Forest City Data Center
Source: Facebook
Colorful Mural Inside the Data Center
Source: Facebook
Phase I on the Alliance Texas development is pictured
Facebook is expanding the Fort Worth campus
Source: Dallasnews.com

Phase I on the Alliance Texas development is pictured

Data Center Aisle on the Alliance Campus
Source: Facebook
Break Area with Colorful Wall Art
Source: Facebook
Admin Building on Campus
Source: Facebook
In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout
Henrico Campus Expansion Layout
Source: Baxtel

In September 2018, Facebook announced an expansion from two buildings to five. This graphic shows the layout

Structured Cabling and Cabinets on FB's Fort Worth Campus
Source: Facebook
Topping Out Cermony
Source: Facebook
The practice of "topping out" a new building can be traced to the ancient Scandinavian religious rite of placing a tree atop a new building to appease the tree-dwelling spirits displaced in its con...
Topping Out: Placing the Last Beam on the First Building
Source: Facebook

The practice of "topping out" a new building can be traced to the ancient Scandinavian religious rite of placing a tree atop a new building to appease the tree-dwelling spirits displaced in its construction. Long an important component of timber frame building, it migrated initially to England and Northern Europe, thence to the Americas. [Wikipedia]

Last Beam Signing at the Newton Data Center
Source: Facebook
Rendering of the Proposed Newton Data Center in Stanton Springs
Source: Facebook
Large Cooling Fans at Lulea Data Center
Source: Facebook
With portable stations, diagnostic functions easily can be performed throughout the data center.
Diagnostic Station
Source: Facebook

With portable stations, diagnostic functions easily can be performed throughout the data center.

Office Space within the Lulea Data Center
Source: Facebook
Photo taken in July 2012
Aerial View of the 1st Data Center on the Forest City Campus
Source: Facebook

Photo taken in July 2012

Aerial View
Source: Baxtel
Data Hall Full of Open Compute Cabinets
Source: DPR
25,000 SqFt Air Handling Penthouse
Source: DPR
Plot of Land for Facebook Data Center in Esbjerg
Source: Baxtel
Project Ember Land Plot
Source: Christer Holte
Facebook Facility at 100 Share Way NW
Source: Des Moines Register
This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.
Original Artwork
Source: Facebook

This is an original piece commissioned for the Altoona Data Center by @Micah Crandall-Bear and Shaun Burner.

The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines
Altoona Artwork
Source: Facebook

The license plate wall at the Altoona Data Center was created with plates and pieces from West End Architectural Salvage & Coffee Shop in Des Moines

2017 Rendering of the first 5 Buildings on the Facebook Iowa Campus
Source: Facebook
Data Center Floor at FB Iowa
Source: Baxtel
Facebook's 3 data centers in Clonee
Source: Baxtel
Front of FB Prineville facility
Source: Baxtel
FB data center room in Prineville
Source: Baxtel
Silicon Ranch's 1st solar farm to serve Facebook
Source: Baxtel
The yellow outlines the land Facebook plans to use to build their Gallatin data center campus
Source: Gallatin City Council
Rendering of proposed DeKalb Illinois facility
Source: Facebook
Rendering of Facebook's datacenter in Singapore which will open in 2022
Source: Baxtel
Rendering of the 3 Buildings on Facebook's New Albany Campus
Source: Facebook
Rendering of the FB Sarpy Campus when it is complete
Source: Baxtel
Rendering of the Facebook Tennessee data center
Source: Facebook
FB Site plan
Source: Zeewolde Planning Permits
Rendering of the Meta facility in Kuna, Idaho
Source: Facebook
9 properties (totaling ~1,088 acres) were annexed into Kuna’s city limits.
Farmland to data centers
Source: Baxtel

9 properties (totaling ~1,088 acres) were annexed into Kuna’s city limits.

Satellite snapshot of Facebook's campus in 2021
Source: Baxtel
2022 Satellite snapshot
Source: gmaps
Rendering of Meta Jeffersonville, Indiana campus
Source: Meta
Facebook's Huntsville Data Center
Source: Baxtel
Campus expansion plan
Source: Baxtel
Meta's Project Tropical near Henrico Campus
Source: Google Maps
Meta's Project Tropical near Henrico Campus
Source: Google Maps
Render of Meta's Cheyenne campus
Source: Meta
Project area for Meta's Cheyenne Campus in Wyoming
Source: City of Cheyenne
Rendering of Meta's Aiken County Campus in South Carolina
Source: Meta
Rendering of Meta's Gallatin Data Center Campus in Nashville
Source: Meta
Rendering of Meta's Eagle Mountain Campus Expansion in Utah
Source: Meta
Rendering of Meta's upcoming Bowling Green campus outside Toledo, Ohio
Source: Meta
Rendering of Meta's Hyperion Campus Richland Parish, Louisiana.
Source: Meta
Meta: Project Domino
Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/