Wisconsin Data Center Market

Latest Podcast
Lambeau Field
Wisconsin is a fast-growing Midwest data center state, led by an AI corridor south of Milwaukee and a colocation hub in Madison. Sales-tax exemptions, large-load power tariffs and cool weather draw developers. Local moratoria, transmission build times and ratepayer scrutiny set the pace. Read More

Market Facts

Wisconsin Data Center Map

Wisconsin Power Growth Over Time

+720% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Wisconsin

Microsoft Azure
Site
Power
Operational
2
338.0
Construction
2
Planned
13
Prospective Expansion
0
Land Bank
4
In Doubt
0
Withdrawn
3
Decommissioned
0
Totals
4
View Provider
Vantage Data Centers
Site
Power
Operational
0
0.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
OpenAI
Site
Power
Operational
0
0.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Meta
Site
Power
Operational
0
0.0
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Wisconsin

Location About Total SqFt Power (MW)
Center MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
Hub BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
EdgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Mapletree: N15 W24250 Riverwood
N15 W24250 Riverwood Drive in Pewaukee, Wisconsin, is a two-story, 142,952 sq ft data center buil...
NN Request Dataset NN Request Dataset
US Signal: WI02 Madison
US Signal's WI02 data center at 5515 Nobel Drive in Fitchburg, just south of Madison, Wisconsin, ...
NN Request Dataset NN Request Dataset

Regions in Wisconsin

About This Metro

Wisconsin Data Center Market Overview

Wisconsin's data center market has two centers and a long tail. Milwaukee holds most of the state's capacity and its hyperscale builds. Madison is the second colocation market. Outside the two metros, the state has small colocation sites, telephone exchanges, crypto hosting at old paper mills, and a growing list of large proposals.

History

Wisconsin's first data centers belonged to its banks, insurers, health systems and telephone companies. Independent telephone companies founded a shared fiber network in 1997, which later opened colocation sites in Eau Claire and Green Bay. Marshfield Clinic built a data center in Marshfield in 2010 that now operates as a colocation facility. In Green Bay, local hosting providers have sold colocation since the 1990s.

Crypto miners arrived in 2021 and 2022. They moved into former paper mills and hydro plants in northern and central Wisconsin. A bitcoin hosting center opened at the former Flambeau River Papers mill in Park Falls in 2022.

Hyperscale demand followed. Microsoft bought land in Mount Pleasant in 2023 that the state had assembled for Foxconn, and finished its first Fairwater data center there in 2026. Vantage Data Centers began a campus in Port Washington for OpenAI and Oracle in 2025. Meta is building a data center in Beaver Dam, set to open in 2027.

Data Centers in Wisconsin Today

Milwaukee and the southeast lead the state. The corridor from Kenosha to Port Washington holds the largest campuses under construction. The city of Milwaukee keeps the main carrier hotel and internet exchange.

Madison has a cluster of colocation and carrier facilities. A hyperscale campus proposed north of the city moved to Iowa in 2026.

In the Fox Valley, Ark Data Centers runs a colocation campus near Green Bay on a former Kimberly-Clark site and is adding new halls. Smaller providers serve Green Bay and Little Chute. In central Wisconsin, Aventus runs the Marshfield facility, and a small colocation site operates in Port Edwards. Beaver Dam, between Madison and Milwaukee, now hosts a Meta campus.

Large proposals have spread beyond the metros since 2025. Developers have pitched campuses at the former General Motors plant in Janesville and a quarry near Beloit. Others targeted farmland near Menomonie and Green Bay, and a paper mill in Wisconsin Rapids. Most have stalled, been withdrawn or been denied.

Why Build Data Centers in Wisconsin?

  • Tax incentives. Since 2023, qualified data centers pay no sales tax on equipment and building materials.
  • Power for large loads. We Energies has a tariff for loads of 100 MW or more, approved in April 2026. Alliant Energy and Xcel Energy have filed their own large-load tariffs.
  • Cool climate. Long winters support free cooling for much of the year.
  • Industrial sites. Former paper mills, factories and quarries offer large parcels with grid and rail connections.
  • Fiber. Long-haul routes between Chicago and Minneapolis cross the state, and a statewide fiber network links the smaller cities.

What Limits Data Center Growth in Wisconsin?

  • Local opposition. Counties, cities and towns took about 40 moratorium actions on data centers in 2026. Voters in Janesville approved a referendum that requires a public vote on large deals for the former General Motors site.
  • Transmission lead times. New campuses need new high-voltage lines and substations, which take years to permit and build.
  • Ratepayer scrutiny. The PSC's large-load rules make very large customers pay for the generation and grid built for them.
  • Policy uncertainty. Bills for a statewide moratorium and new data center rules died in the legislature in March 2026, and the debate continues.
  • Thin colocation outside the metros. Most outstate facilities are small, so large tenants have few ready-built options.

Wisconsin Data Center Trends

  • Hyperscale spillover from Chicago. Developers look north along Interstate 94 for land and power.
  • Industrial reuse. Paper mills and auto plants are the most pitched sites, for their grid ties and zoning.
  • Local control. Towns are writing data center zoning districts and putting large deals to voters.
  • Telecom consolidation. Verizon bought Frontier in 2026, T-Mobile bought UScellular's wireless business in 2025, and Brightspeed took over Lumen's local phone business in 2022.

Power and Policy in Wisconsin

WEC Energy Group's We Energies and Wisconsin Public Service serve the southeast and northeast. Alliant Energy serves much of southern and central Wisconsin, Xcel Energy the west, and Madison Gas and Electric the Madison area. Municipal utilities and electric cooperatives serve many smaller towns. American Transmission Company builds most of the high-voltage grid, and the Midcontinent Independent System Operator (MISO) runs the wholesale market. The Public Service Commission of Wisconsin (PSC) approves tariffs, plants, transmission lines and large customer contracts.

Get Quotes

Related News See all

Read Potawatomi Seeks Milwaukee Data Center Expansion Up To 59,000 Sq Ft
Data Holdings, the Forest County Potawatomi Community's data center business, has filed a zoning request to expand its [Milwaukee](https://baxtel.com/regions/milwaukee) facility, [the Milwaukee Jou...

Potawatomi Seeks Milwaukee Data Center Expansion Up To 59,000 Sq Ft

November 12, 2026 Data Holdings

Data Holdings, the Forest County Potawatomi Community's data center business, has filed a zoning request to expand its Milwaukee facility, the Milwaukee Journal Sentinel reported. The application describes an expansion of up to 59,000 square feet beside the existing 46,000-square-foot data...

Read more
Read Lambda To Anchor $33.1B Project Red Clay Campus In Alabama
[Lambda](https://baxtel.com/data-centers/lambda) will anchor Project Red Clay, a 1GW data center campus in Lowndes County, Alabama. The AI cloud provider [said on November 4](https://lambda.ai/blog...

Lambda To Anchor $33.1B Project Red Clay Campus In Alabama

November 05, 2026 Lambda

Lambda will anchor Project Red Clay, a 1GW data center campus in Lowndes County, Alabama. The AI cloud provider said on November 4 that it will serve as the end user for the site, which Cloverleaf Infrastructure readied for development, and estimates the project represents a $33.1 billion...

Read more
Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read Meta Named on 400MW Kentucky Campus With 40-Year Local Tax Break
Mason County Fiscal Court voted unanimously on Oct. 13 to approve a development and community revenue agreement with Meta, ending two years in which the company behind a planned hyperscale campus n...

Meta Named on 400MW Kentucky Campus With 40-Year Local Tax Break

October 16, 2026 Meta

Mason County Fiscal Court voted unanimously on Oct. 13 to approve a development and community revenue agreement with Meta, ending two years in which the company behind a planned hyperscale campus near Maysville, Kentucky was kept unnamed (Mason County Fiscal Court announcement). The site covers...

Read more
Read Mason County Approves 40-Year Tax Deal for Meta's 400MW Kentucky Campus
The Mason County Fiscal Court voted unanimously on Oct. 13 to approve three agreements that clear the way for [Meta](https://baxtel.com/data-centers/meta) to build a hyperscale data center campus o...

Mason County Approves 40-Year Tax Deal for Meta's 400MW Kentucky Campus

October 16, 2026 Meta

The Mason County Fiscal Court voted unanimously on Oct. 13 to approve three agreements that clear the way for Meta to build a hyperscale data center campus on nearly 3,000 acres near Maysville in northeastern Kentucky. The approvals, set out in the county's news release, cover a 40-year...

Read more
Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.