Street Address
Interested in this information? Contact us
Operational
Fully operational facility
Operated by:

Meta: Bilbao-Arasur

Year Built: 2024
This site is leased from Merlin Properties in the Merlin: Bilbao-Arasur building
░░░░ Request Dataset MW
Total Power

In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.

Map and Nearby Locations:

This Facility
Meta Sites
Nearby Facilities

Sites within 15 miles of Station Prime

Distance Site About
0.02 miles Edged Energy: Bilbao-Arasur BIL03
This advanced tech campus is situated in the Arasur industrial and logistics hub south of Bilbao, positioned at a junction of high-speed fiber networks.
0.03 miles Merlin: Bilbao-Arasur
The Bilbao-Arasur Campus, located in the Arasur hub south of Bilbao, sits at a high-speed fiber junction. It features three data centers and an administrative building, with expansion potential.
0.18 miles Edged Energy: BIL02
BIL02 is the second building of Edged Energy's Bilbao-Arasur Campus.
0.37 miles Edged Energy: BIL01
BIL01 is the third building of Edged Energy's Bilbao-Arasur Campus.

Tower Pro Data Center Photos (See all)

Operating Company

Operated by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

158
Facilities
9
Markets
4948MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?