Meta Begins Construction on Tulsa Data Center
April 22, 2026
Meta
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
| Distance | Site | About |
|---|---|---|
| 0.02 miles | Edged Energy: Bilbao-Arasur BIL03 |
This advanced tech campus is situated in the Arasur industrial and logistics hub south of Bilbao, positioned at a junction of high-speed fiber networks.
|
| 0.03 miles | Merlin: Bilbao-Arasur |
The Bilbao-Arasur Campus, located in the Arasur hub south of Bilbao, sits at a high-speed fiber junction. It features three data centers and an administrative building, with expansion potential.
|
| 0.18 miles | Edged Energy: BIL02 |
BIL02 is the second building of Edged Energy's Bilbao-Arasur Campus.
|
| 0.37 miles | Edged Energy: BIL01 |
BIL01 is the third building of Edged Energy's Bilbao-Arasur Campus.
|
Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.
April 22, 2026
Meta
March 05, 2026
Meta
February 11, 2026
Meta
September 08, 2023
Meta
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas