Michigan Data Center Market

Latest Podcast

The Michigan data center market is located in the region of Midwest US and within United States. Michigan has 76 facilities.

The top providers in Michigan are OpenAI (3 sites) and Related Digital with 1 facility . The most popular facilities are Benton Harbor (Proposed) and Benton Harbor (Proposed).

Market Facts

Michigan Data Center Map

Michigan Power Growth Over Time

+85% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Michigan

OpenAI
Site
Power
Operational
0
0.0
Construction
3
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Related Digital
Site
Power
Operational
0
0.0
Construction
1
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Hyperscale Data, Inc.
Site
Power
Operational
1
30.0
Construction
1
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Switch
Site
Power
Operational
2
50.0
Construction
0
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider

Largest Data Centers in Michigan

Location About Total SqFt Power (MW)
Switch: Grand Rapids 1
After gaining approval in 2021, construction on the first 312,000-square-foot (29,000 sqm) expans...
NN Request Dataset NN Request Dataset
Hyperscale Data: Michigan
This data center was operated by Sentinum, Inc. ("Sentinum"), a wholly-owned subsidiary of Ault A...
NN Request Dataset NN Request Dataset
Switch: Grand Rapids (The Pyramid Campus)
The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up...
NN Request Dataset NN Request Dataset
123.net DC1
Michigan-based Internet Service Provider (ISP) 123Net has completed a major expansion of its Detr...
NN Request Dataset
Quicken Loans NN Request Dataset NN Request Dataset

Regions in Michigan

Related News See all

Read Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia
[Meta](https://baxtel.com/data-centers/meta) has signed strategic AI infrastructure agreements with Australian AI factory developer [Firmus Technologies](https://baxtel.com/data-centers/firmus-tech...

Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia

September 30, 2026 Firmus Technologies

Meta has signed strategic AI infrastructure agreements with Australian AI factory developer Firmus Technologies for GPU compute capacity at Firmus sites across Southeast Asia, the companies announced Tuesday. The agreements cover contracted capacity plus options to expand, and Capital Brief...

Read more
Read Meta Signs Deal to Use AI Capacity at Firmus Data Centers in Southeast Asia
Meta has agreed to lease AI compute capacity from Australian neocloud Firmus across its upcoming Southeast Asian data centers. The deal expands an existing partnership under which Meta leases Nvidi...

Meta Signs Deal to Use AI Capacity at Firmus Data Centers in Southeast Asia

September 30, 2026 Meta

Meta has agreed to lease AI compute capacity from Australian neocloud Firmus across its upcoming Southeast Asian data centers. The deal expands an existing partnership under which Meta leases Nvidia GB300 NVL72 capacity at Firmus’ Melbourne facility. Firmus is developing AI factories with DayOne...

Read more
Read Schneider Electric Launches 2.5MW Power Modules For AI Data Centers
Schneider Electric has launched a new range of 2.5MW power modules for hyperscale, neocloud, colocation, and AI data centers. The standardized, prefabricated modules and power skids use Schneider’s...

Schneider Electric Launches 2.5MW Power Modules For AI Data Centers

September 16, 2026 Hyperscale Data, Inc.

Schneider Electric has launched a new range of 2.5MW power modules for hyperscale, neocloud, colocation, and AI data centers. The standardized, prefabricated modules and power skids use Schneider’s Galaxy VXL UPS technology and are based on reference designs developed with Nvidia for its GB300...

Read more
Read Meta’s $1.2B Data Center In Kuna, Idaho, Goes Live
Meta’s Kuna, Idaho Data Center Is Now Operational Meta has begun serving traffic from its data center in Kuna, Idaho. The company announced the campus in 2022, initially planning to invest $800 mil...

Meta’s $1.2B Data Center In Kuna, Idaho, Goes Live

September 04, 2026 Meta

Meta’s Kuna, Idaho Data Center Is Now Operational Meta has begun serving traffic from its data center in Kuna, Idaho. The company announced the campus in 2022, initially planning to invest $800 million in a 960,000 sq ft (89,187 sqm) facility. The project was later temporarily paused for redesign...

Read more
Read Hyperscale Data Ends Cryptomining Operations At Michigan Data Center
Hyperscale Data has ended Bitcoin mining at its Michigan data center as it prepares the site for AI infrastructure. The company said mining operations stopped on September 1, 2026, ahead of a neocl...

Hyperscale Data Ends Cryptomining Operations At Michigan Data Center

September 03, 2026 Hyperscale Data, Inc.

Hyperscale Data has ended Bitcoin mining at its Michigan data center as it prepares the site for AI infrastructure. The company said mining operations stopped on September 1, 2026, ahead of a neocloud customer’s planned AI deployment. The unnamed California-based customer signed a lease in June...

Read more
Read Raeden Says Michigan Moratorium Unlawfully Halted Gibraltar Data Center Project
Data center developer Raeden has sued Gibraltar, Michigan, arguing that the city’s recently imposed moratorium unlawfully blocked its proposed 100MW data center. Raeden, backed by landowner Cal Rea...

Raeden Says Michigan Moratorium Unlawfully Halted Gibraltar Data Center Project

August 24, 2026 Michigan

Data center developer Raeden has sued Gibraltar, Michigan, arguing that the city’s recently imposed moratorium unlawfully blocked its proposed 100MW data center. Raeden, backed by landowner Cal Realty, said the facility at the former McLouth Steel site was permitted under existing zoning rules....

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...

Ready to Level up Your
Data Center Strategy?