Bilbao Data Center Market

Latest Podcast

The Bilbao data center market is located in the region of Basque Country within EMEA. Bilbao has 19 facilities.

The top providers in Bilbao are CoreWeave (3 sites) and Edged Energy with 3 facilities . The most popular facilities are Santander: Solares, Cantabria and South PlazaInterested in this information?Contact us.

Read More

Market Facts

Bilbao Data Center Map

Bilbao Power Growth Over Time

+100% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Data Centers in Bilbao

Name Company Size Status Type
Santander: Solares, Cantabria Santander Digital Services Medium Operational Fintech
Core ParkInterested in this information?Contact us Meta Small Operational Hyperscale
Telxius Derio Communications Hub Telxius Small Operational Carrier
Orange: San Sebastián Zuatzu Orange Decommissioned Carrier
Orange: Santander Orange Extra Small Operational Carrier
Merlin: Bilbao-Arasur Merlin Properties Medium Operational Real Estate
Merlin: Bilbao-Arasur Expansion Merlin Properties In Doubt Real Estate
CoreWeave: Bilbao-Arasur BIL03 CoreWeave Medium Operational Neocloud
CoreWeave: Bilbao-Arasur BIL02 CoreWeave Large Construction Neocloud
CoreWeave: Bilbao-Arasur BIL01 CoreWeave Large Construction Neocloud
Edged Energy: BIL03 Edged Energy Medium Operational Carrier-Neutral
Edged Energy: BIL02 Edged Energy Large Construction Carrier-Neutral
Edged Energy: BIL01 Edged Energy Large Construction, In Doubt Carrier-Neutral
IREN: Zamudio IREN Medium Planned Neocloud
Stoneshield: Altamira I Stoneshield Capital Land Bank Private Equity
Solaria: Basque Country Solaria Energía y Medio Ambiente Withdrawn Enterprise
Sarenet: Zamudio 2 Sarenet Small Construction, Operational Carrier
Sarenet: Zamudio Sarenet Operational Carrier
aDi: Arrasate aDi Atlantic Data Infrastructure Small Construction Carrier-Neutral

Largest Providers in Bilbao

CoreWeave
Site
Power
Operational
1
18.0
Construction
2
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Edged Energy
Site
Power
Operational
1
16.0
Construction
2
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
1
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Santander Digital Services
Site
Power
Operational
1
20.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Merlin Properties
Site
Power
Operational
1
16.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
1
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Bilbao

Location About Total SqFt Power (MW)
Edged Energy: BIL03
This advanced tech campus is situated in the Arasur industrial and logistics hub south of Bilbao,...
NN Request Dataset NN Request Dataset
Merlin: Bilbao-Arasur
The Bilbao-Arasur Campus, located in the Arasur hub south of Bilbao, sits at a high-speed fiber j...
NN Request Dataset
Santander: Solares, Cantabria
Banco Santander's twin-building group data center at Solares in Cantabria, which also provides di...
NN Request Dataset NN Request Dataset
CoreWeave: Bilbao-Arasur BIL03
CoreWeave runs GPU cloud capacity in BIL03, Merlin Properties' first data center at the Arasur lo...
NN Request Dataset
Telxius Derio Communications Hub NN Request Dataset

Sites Under Construction in Bilbao

Location Building SqFt Power (MW) Estimated Launch
Edged Energy: BIL02 SqFt 48 Megawatts Q4 2026
aDi: Arrasate SqFt 3 Megawatts Q3 2026

About This Metro

Bilbao, an industrial port city in northern Spain, is surrounded by green mountains. It’s the de facto capital of Basque Country. 

Get Quotes

Related News See all

Read Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW
[Merlin Properties](https://baxtel.com/data-centers/merlin-properties) has paused work on two buildings at its [Bilbao-Arasur data center campus](https://baxtel.com/data-center/merlin-bilbao-arasur...

Merlin Pauses Two Bilbao Data Center Buildings, Cuts MEGA Plan to 704MW

November 19, 2026 Merlin Properties

Merlin Properties has paused work on two buildings at its Bilbao-Arasur data center campus after failing to secure an electricity supply for them. The suspension covers Arasur 4 and Arasur 5 in Álava, in Spain's Basque Country. Chief executive Ismael Clemente confirmed the halt at...

Read more
Read CoreWeave Tops 1.7GW Active Power As Backlog Reaches $132.5B
[CoreWeave](https://baxtel.com/data-centers/coreweave) added more than 200 MW of active power in the third quarter, lifting its live footprint past 1.7 GW. The neocloud [reported third-quarter resu...

CoreWeave Tops 1.7GW Active Power As Backlog Reaches $132.5B

November 12, 2026 CoreWeave

CoreWeave added more than 200 MW of active power in the third quarter, lifting its live footprint past 1.7 GW. The neocloud reported third-quarter results on Nov. 10 with revenue of $3.66 billion for the quarter ended Sept. 30, up 168 percent from a year earlier. The company said the gain doubled...

Read more
Read CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center
CoreWeave has brought most of its planned 22.5MW of IT capacity online at [atNorth](https://baxtel.com/data-centers/atnorth)'s [DEN01](https://baxtel.com/data-center/atnorth-den01) data center in t...

CoreWeave Brings 22.5MW Online at atNorth's Copenhagen Data Center

October 27, 2026 CoreWeave

CoreWeave has brought most of its planned 22.5MW of IT capacity online at atNorth's DEN01 data center in the Copenhagen metro, its first deployment in Denmark. The company announced the activation from London on October 27. atNorth owns and operates DEN01, a colocation site in Ballerup,...

Read more
Read Meta Named on 400MW Kentucky Campus With 40-Year Local Tax Break
Mason County Fiscal Court voted unanimously on Oct. 13 to approve a development and community revenue agreement with Meta, ending two years in which the company behind a planned hyperscale campus n...

Meta Named on 400MW Kentucky Campus With 40-Year Local Tax Break

October 16, 2026 Meta

Mason County Fiscal Court voted unanimously on Oct. 13 to approve a development and community revenue agreement with Meta, ending two years in which the company behind a planned hyperscale campus near Maysville, Kentucky was kept unnamed (Mason County Fiscal Court announcement). The site covers...

Read more
Read Mason County Approves 40-Year Tax Deal for Meta's 400MW Kentucky Campus
The Mason County Fiscal Court voted unanimously on Oct. 13 to approve three agreements that clear the way for [Meta](https://baxtel.com/data-centers/meta) to build a hyperscale data center campus o...

Mason County Approves 40-Year Tax Deal for Meta's 400MW Kentucky Campus

October 16, 2026 Meta

The Mason County Fiscal Court voted unanimously on Oct. 13 to approve three agreements that clear the way for Meta to build a hyperscale data center campus on nearly 3,000 acres near Maysville in northeastern Kentucky. The approvals, set out in the county's news release, cover a 40-year...

Read more
Read IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured
IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional [New South Wales](https://baxtel.com/regions/new-south-wales). The Nasdaq-listed o...

IREN Proposes 900MW Redbank Campus Near Wagga Wagga, Power Not Yet Secured

October 14, 2026 IREN

IREN outlined early plans this week for Redbank, a proposed 900 MW data center campus near Wagga Wagga in regional New South Wales. The Nasdaq-listed operator took the proposal to the local community ahead of a scoping report due to the state's Department of Planning, Housing and...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.