Facebook: Newton 5

Short Code: Building 5
Year Built: 2023
Utility Provider: Walton Electric Membership Corporation (EMC)
Floors: 2
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023. It is powered by 100 percent clean and renewable energy and cooled using outside air.
The data complex stands at Stanton Springs near the Shire pharmaceutical plant along I-20, about 40 miles east of Atlanta.

Solar Power:

  • 102.5 megawatt solar farm in Blakely came online in 2019
  • 107 megawatt Snipesville II in Denton, GA came online in 2021

Map and Nearby Locations

This Facility
Meta Sites
Nearby Facilities

Facebook: Newton 5 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Ridge Gamma

Distance Site About
0.11 miles Hyperscale Data Center Request Dataset
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
0.23 miles Hyperscale Data Center Request Dataset
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
0.44 miles Hyperscale Data Center Request Dataset
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
0.50 miles Hyperscale Data Center Request Dataset
The first phase of the data center broke ground in 2018 with a 970,000 sq ft data center space. The second phase is a three-building expansion that added 1.5 million sq ft to the existing two-building campus in 2023.
2.63 miles Newton County Expansion
2.71 miles Newton County Technology Park.
The proposed development could reach 2.56 million square feet (237,830 square meters) at full capacity, spread across nine buildings.
3.65 miles Sailfish Investors: Social Circle Expansion
3.68 miles Sailfish Investors: Social Circle, GA
Sailfish Investors, a real estate investment and operating platform, aims to develop a 1.78 million sq ft data center site along Social Circle Parkway.
4.98 miles Atlas Development: Social 3
This facility is part of Atlas Development's Hawkins Academy Data Center Campus in Social Circle, Georgia.
5.10 miles Atlas Development: Social 2
This facility is part of Atlas Development's Hawkins Academy Data Center Campus in Social Circle, Georgia.
5.19 miles Atlas Development: Social Circle, GA
The Hawkins Academy Data Center Campus in Social Circle, Georgia, was approved on November 6, 2025, when the City Council overrode a Planning Commission rejection with a 2-1 vote.
6.99 miles Serverfarm: Covington, GA
The project involves converting an existing 498,960-square-foot warehouse/distribution facility situated on a 97-acre site at Hazelbrand Road.
7.46 miles Gregory 5
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
7.48 miles Gregory 4
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
7.48 miles Hyperscale Data Center Request Dataset
Amazon is developing a new data center campus on 430 acres in Covington, Georgia.
7.49 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
7.54 miles Gregory Road DC Campus
Universal Planning LLC is proposing a data center campus, named the Gregory Road Data Center, in Covington, Newton County.
7.55 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
7.60 miles Gregory 2
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
7.63 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
7.64 miles Gregory 3
This facility is part of Universal Planning LLC's Gregory Road Data Center Campus in Covington.
7.68 miles Hyperscale Data Center Request Dataset
This facility is part of Amazon's 430-acre data center campus near Alcovy Road in Covington.
8.20 miles Hyperscale Data Center Request Dataset
Amazon plans to expand its data center footprint in Covington.

Core Station Data Center Photos See all

Map produced by TAG, the Technology Association of Georgia.
Map of Georgia's Data Centers
Source: Baxtel

Map produced by TAG, the Technology Association of Georgia.

Operating Company

Operated by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

167
Facilities
41
Markets

News See all

Read Meta Expands Louisiana Data Center Campus To 5GW
Meta plans to more than double its Richland Parish, Louisiana, data center campus to 5GW of capacity. The site, known as the Hyperion data center project, was previously planned as a 2GW developmen...

Meta Expands Louisiana Data Center Campus To 5GW

July 13, 2026 Meta

Meta plans to more than double its Richland Parish, Louisiana, data center campus to 5GW of capacity. The site, known as the Hyperion data center project, was previously planned as a 2GW development. Announced in late 2024, Hyperion was originally designed as a 4 million sq ft (372,000 sqm)...

Read more
Read Meta Plans $9.17 Billion Gigawatt-Scale Data Center in Alberta, Canada
Meta is planning a 1GW data center in Sturgeon County, Alberta, marking the company’s first facility in Canada. The project represents a CA$13 billion (US$9.17 billion) investment and could scale u...

Meta Plans $9.17 Billion Gigawatt-Scale Data Center in Alberta, Canada

July 09, 2026 Meta

Meta is planning a 1GW data center in Sturgeon County, Alberta, marking the company’s first facility in Canada. The project represents a CA$13 billion (US$9.17 billion) investment and could scale up to 1.8GW of capacity. The AI-focused facility will use a closed-loop liquid cooling system and is...

Read more
Read Meta Veteran Sham Parmar Joins Anthropic Supply Chain Operations
Meta’s Sham Parmar has joined generative AI company Anthropic.
Parmar previously served as senior manager for supply chain and engineering, overseeing electrical, mechanical, and fiber connectivit...

Meta Veteran Sham Parmar Joins Anthropic Supply Chain Operations

June 16, 2026 Meta

Meta’s Sham Parmar has joined generative AI company Anthropic. Parmar previously served as senior manager for supply chain and engineering, overseeing electrical, mechanical, and fiber connectivity systems. "I'm excited to share that I've joined Anthropic as a supply chain lead, power and cooling...

Read more
Read Private Equity Firm Acquires Croatia’s ‘Fort Knox’ Data Center
Gnomon Capital has acquired 100% of Croatian data center DC North, known as the “Fort Knox” facility, in a deal involving former owners Cratis and Muraplast. Court records show the transfer was com...

Private Equity Firm Acquires Croatia’s ‘Fort Knox’ Data Center

June 13, 2026 Meta

Gnomon Capital has acquired 100% of Croatian data center DC North, known as the “Fort Knox” facility, in a deal involving former owners Cratis and Muraplast. Court records show the transfer was completed in late May, with Gnomon now listed as the sole shareholder. DC North was launched by Cratis...

Read more
Read Meta Signs 168MW Data Center Pact at Reliance Gujarat Campus
Meta and Reliance are partnering to develop a 168MW data center in Jamnagar, Gujarat, India. Reliance will build the facility, which Meta will lease to run AI workloads. The project may be expanded...

Meta Signs 168MW Data Center Pact at Reliance Gujarat Campus

June 10, 2026 Meta

Meta and Reliance are partnering to develop a 168MW data center in Jamnagar, Gujarat, India. Reliance will build the facility, which Meta will lease to run AI workloads. The project may be expanded in the future, though no launch timeline has been disclosed. Meta will cover power and water costs,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?