Withdrawn
Project cancelled before construction
Operated by:

Facebook Zeewolde

Year Built: 2022
Lot Size: 410 acres

Meta's proposed hyperscale data center in Zeewolde, Netherlands was officially cancelled in July 2022 following intense local and national opposition. The project, which would have become the largest data center in the Netherlands, was permanently blocked when the Council of State struck down the municipality's zoning plan in September 2023.

Project Specifications:

  • Site: 166 hectares (410 acres) at Trekkersveld IV
  • Location: Zeewolde, Flevoland, ~50 km east of Amsterdam
  • Annual Energy: 1.38 GWh from renewable sources
  • Jobs: 400 permanent positions promised

Timeline:

  • Late 2019: Meta (then Facebook) began exploring site, initially concealing identity
  • February 2021: Application submitted before Flevoland's data center moratorium
  • December 2021: Zeewolde council approved zoning change (11-8 vote)
  • March 2022: Project paused after Senate motion and local election upset
  • July 2022: Meta officially cancelled project
  • September 2023: Court definitively struck down zoning plan

Cancellation Factors:

The project faced opposition on multiple fronts: environmental groups protested the consumption of renewable energy by a multinational, local residents objected to converting fertile reclaimed farmland to "metal boxes," and the anti-data center party Leefbaar Zeewolde won an absolute majority in March 2022 elections. National concerns about data centers consuming 10% of Netherlands' electricity by 2030 added pressure. Part of the required land was government-owned, and officials ultimately refused to sell, citing sustainability concerns and violation of national spatial planning strategy.

Map and Nearby Locations:

This Facility
Meta Sites
Nearby Facilities

Sites within 15 miles of Plaza

Distance Site About
11.11 miles Cellnex: Lelystad
Constructed in 1975, this prominent structure was acquired by Cellnex in 2007, along with 23 other towers, from KPN.
11.19 miles NorthC Almere
11.21 miles Keppel Almere Netherlands
Almere Data Centre is a three-storey facility built in 2008. NorthC is located in the building.
13.31 miles Solcon Droten
13.64 miles Digital Residence Serverius Dronten
13.64 miles Serverius SDC1
14.94 miles UNET Almere
17.99 miles Cellnex: Media Gateway Hilversum
In 2021, Cellnex acquired Red Bee Media’s Media Gateway data center in Hilversum in the Netherlands.
18.01 miles TCN Hilversum
18.12 miles Cellnex: Hilversum
The first radio mast for television (Nederland 1) was erected in Hilversum in 1951. This was later replaced in 1973 by a new mast on the Witte Kruislaan.

Center Max Data Center Photos (See all)

FB Site plan
Source: Zeewolde Planning Permits

Operating Company

Operated by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

158
Facilities
9
Markets
4948MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?